458 resultados para Energia Limpa
Resumo:
Pós-graduação em Zootecnia - FCAV
Resumo:
Pós-graduação em Psicologia - FCLAS
Resumo:
Pós-graduação em Engenharia Elétrica - FEB
Resumo:
Pós-graduação em Engenharia Elétrica - FEIS
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Due to the high value of the bill that the Brazilian has been paying, one of the most expensive in the world, is becoming increasingly attractive the option for renewable energy in form of distributed micro and minigeneration. In other words, the renewable energy sources are becoming attractive not only because of environmental concerns, but also due to economic issues. This has become even more relevant and concrete after approval of rules by National Agency of Electric Energy (ANEEL) on 4/17/2012 (Normative Resolution n ° 482/2012 of 04/17/2012) aimed at reducing barriers to installation of small distributed generation, including microgeneration, with up to 100 kW of power, and minigeneration, 100 kW to 1 MW. The Normative Resolution n ° 482/2012 creates the Energy Clearing System, which allows consumers to install small generators in its consumer unit and exchange energy with the local distributor. The rule applies to generators that use renewable sources of energy (hydro, solar, biomass, wind and cogeneration qualified). In this context, this paper presents a technical and economic analysis of installing a residential microgenerating plant composed of photovoltaic cells, solar panels and small wind turbines
Resumo:
The tertiary sector is largely responsible for the growth of electricity consumption in Brazil. The large commercial and public buildings, hypermarkets and shopping centers stand out as major consumers of electricity for lighting, power and thermal energy. Brazil presents significant potential for the deployment of small cogeneration plants, especially in the tertiary sector. Allied to this, the possibility of natural gas supply and the growing demands in favor of maintaining and preserving the environment favor the implementation of cogeneration plants. In this context, this paper presents a technical and economic analysis of installing a cogeneration plant using internal combustion engine with natural gas in a mall
Resumo:
Electrical energy is present in the lives of all people and is extremely important that it be delivered to end users with plenty of quality, safety and low costs. The electric power substations are responsible for transmission and distribution of electricity generating sources to consumers, and with technological advances and the subsequent automation of same, the electricity began to be delivered with greater continuity and reliability. Protection systems in substations are largely responsible for making the electricity reaches the final consumer with quality, since their function is to prevent the spread of any type of failure occurred at any point of transmission to the load centers. These systems consist primarily by the current transformers and potential, by the protective relays and circuit breakers and switchgear. The processors send the necessary data to the relays and, if those detect any abnormality in the system, operate the opening command of the branch circuit breakers to isolate where the fault. Therefore, it is essential to better understand the operation of such equipment, as well as the overall system. This work aims to study the main substation equipment, current transformers and potential and, especially, protection relays, in order to obtain the advantages that automated systems can provide
Resumo:
Brazil is nowadays the greatest bet of investors for the future due to its stable economy growth. The country has grown side by side with the greatest demand for electrical energy. The international appeal for renewable sources is causing a change in the Brazilian energetic matrix, raising the amount of energy generated by thermoelectric power plants. The construction of new power plants, running on biomass, requires a crescent number of capacitated personnel to run them. The Faculdade de Engenharia de Guaratinguetá – UNESP – has a steam laboratory; witch is deactivated, which has a thermoelectric plant of small capacity. The laboratory reactivation and the return of its activities can be an important tool in order to graduate engineer able to operate on such units. This paper proposes four new experiments to be simulated on the Collage’s Energy Dep. Steam Lab when it gets back to its educational activities
Resumo:
The purpose of this work was the inlay’s characterization from the water supply networks of Rio Claro-SP city; as well analyze the influence of network’s aging in the actual system. To do this, some samples of inlays were collected and made chemistry analysis and X-Ray Diffraction Spectrometry. The history of the source water quality was also analyzed, to make possible to known the origins of the inlays. To evaluate the performance of the network, some different scenarios have been simulated, varying the resistance coefficient of the water supply networks of Rio Claro-SP. The characterization results showed that there are basically oxide and hydroxide of iron (magnetite and goethite) and quartz in the inlays, which are materials of high hardness. The hydraulic simulations indicated that the simulated scenarios had a variation of ~2000% in terms of loss of energy
Resumo:
O presente trabalho possui o intuito de analisar o panorama de energia eólica em âmbito mundial, dando um enfoque maior para seu cenário no Brasil. Primeiramente, estudando a história da energia eólica, seu advento, para fins de solução ao viés ambiental e à necessidade de diversificação da matriz energética mundial, com a finalidade de assumir os compromissos firmados no Protocolo de Kyoto, e, no caso do Brasil, da menor dependência do abastecimento externo
Resumo:
This paper addresses the topics required for the selection of surge arresters used, the output of autotransformers, which protect the system Auxiliary Services (SE) of an electrical substation. Surge arresters used are part of the Protection System Lightning (SPDA). Transmission lines mostly run through regions with orographic well diversified and have constant weather changes, which lead to many undesirable interactions with electromagnetic phenomena, such as giving rise to blackout on 10 November 2009, which left nine states without power, which led to unplanned shutdowns in the system that left millions of people without electricity. This work of completion is to determine whether the method used in the selection of surge arresters meet the protection needs faced by a substation auxiliary services, through the use of software use ATPDraw
Resumo:
The treatment of domestic and industrial effluents through Wastewater Treatment Plants (WTPs) generates a residue termed sewage sludge, rich in organic matter, high-volume, occasionally containing pathogens and heavy metals. The sludge generation can minimize the benefits brought by the treatment of sewage, because this residue does not always receive appropriate treatment before final disposal. The disposal is another problem related to sludge. Landfills generally does not have physical space and alternatives such as the use in agriculture requires an intense treatment that could be in many cases operational or economic unfeasible. The objective of this work is the theoretical research about the processes of stabilization of the sludge by anaerobic digestion and the methanogenic activity during the process. Through analysis of each step and contemplating each relevant factor in anaerobic digestion process in order to optimize them, we proposed a theoretical model of reactors capable of stabilize the sludge, reduce its volume and eliminate pathogens. The obtained configuration consists of two anaerobic reactors connected in series. The first one operates in the range mesophilic temperature (35 ° C) and has higher hydraulic retention time (25 days) working primarily in the stabilization of organic matter present in the sludge and producing biogas, whereas the second one operates in the thermophilic range (55 ° C) in order to eliminate pathogens, and to reduce the volume. The hydraulic retention time in the second reactor is lower (10 days). Both mesophilic and thermophilic processes were efficient in what was proposed, promoting the stabilization of organic matter present in the sludge and significant reduction of pathogens. As a final step with the sludge previously digested, it is indicated a final dehydration... (Complete abstract click electronic access below)