300 resultados para one way delay


Relevância:

80.00% 80.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The interaction between industry and university is often discussed. Industry participants feel they do not have enough time to spend with academics because of tight deadlines to achieve your goals. The other hand, professors and his students do not have availability and resources for responding quickly to industry activities. Both sides recognize the associated problems and feel the consequences of various forms. One way to reduce the distance between them is to provide industrial labs that resemble the factory floor at the university. Thus not only students may work on a real technological base, but also the industry's problems can be brought to the university laboratory. To ensure that relevant industrial problems will be studied, the industry needs help in the formulation of the problem being researched. The graduate program of Automation and Control Engineering from UNESP Sorocaba is aimed at training human resources with skills in automation and control activities related to the development of automatic control processes, integrating electronic commands, intelligent manufacturing and industrial robotics. In order to achieve its objectives, one of the pillars of the university consists of a wide range of modern equipments and software for industrial automation, which allows the circuit assembly from most primitive until configuration and programming of a complex system of integrated manufacturing. This paper describes industrial automation equipments and laboratory structure offered to students of Control and Automation Engineering graduate program at UNESP Sorocaba as alternative to close technologies and real problems on the job until academic world. The strategic is to do students understand theory and operations in robotic and industrial automation by means to manipulating real production systems locate at university

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Currently , as a result of the significant increase in the number of elderly, one can observe an increase in the number of chronic diseases , among them Alzheimer's disease (AD) , which affects both patients and their caregivers , that due care with the patient , just overwhelmed , anxious and depressed. Therefore, this study aims to draw a profile of caregivers of Alzheimer's patients, correlating the physical activity of patients with levels of overload, anxiety, depression caregivers. For both sample consisted of 40 patients with AD to characterize the physical activity levels and perform activities of daily living. In addition, we evaluated 40 caregivers. Patient assessment was made through a medical history, beyond the score Clinical Dementia Rating (CDR), Mini - Mental State Examination (MMSE), Modified Baecke Questionnaire for Older Adults (MBQ) , Functional Activities Questionnaire PFEFFER (QAFP) , and the Self Perception Performance in Activities of Daily Living (EAPAVD). For assessing the caregiver was also used an interview, then the Neuropsychiatric Inventory (NPI), anxiety and depression scale (HAD) Scale and the Zarit caregiver burden (Zarit). The data were processed using descriptive procedures for the analysis of characterization of samples, such as cognitive screening and physical activity level and profile of caregivers. There was a normal distribution of the data using the Shapiro Wilk, For data with normal distribution were used parametric descriptive procedures using One Way ANOVA to compare groups and applying a post hoc Bonferroni. As for the data that showed the destruction not normal was used to standardize the test by Z -score , and then treated by means of parametric statistical procedures , as presented earlier . The Pearson correlation was used to identify possible associations between variables. It was assumed significance level of 5 % (p ≤ 0.05) for all analyzes. Given these results, we conclude that...

Relevância:

80.00% 80.00%

Publicador:

Resumo:

In heavy machining industries, a critical point that must be taken into account is setup. Because the characteristics of machine tools and parts to be machined, usually pieces robust and large, the preparation of these parts must be made accurately for machining has a good result as planned. As a result of the difficulty raised in the setup machining of heavy parts, companies in this segment seek alternatives to reduce the unproductive time caused by setup and optimize machining processes. One way was found that these companies create operating instructions that describe and standardize the operation between its employees, as well as deploy a control machining times to measure the unproductive time caused by the setup. This work studied a new system for the realization of centering and alignment of Rotating Deck R-9350 in CNC Milling Machine PAMA Speedram 3000, in Liebherr Brazil company. The part Rotating Deck R-9350 is a critical part in which its machining in PAMA Milling Machine is made in three phases and their setup times are quite high and involve stopping the machine. It has been tested and proposed a solution to the realization of this part of the setup without the use of the machine, but of the measuring instrument three-dimensional Laser tracker, with which the machine continued to work, while he was in the centering and alignment of other parts. It was noted that the instrument technically attended the need and it was possible to perform this operation more accurately

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Several studies have shown that different stretching routines can lead to decreases on acute neuromuscular system performance. Although the deficit in muscle strength mediated by different methods of stretching has been systematically observed, few studies have investigated the possible existence of a dose-response relationship between the amount of stretching and muscle strength deficit in older adults. In this context, the objective of this study was to investigate the acute effect of two different stretching volumes on isometric force-time curve (Cf-t) in elderly women. The study included 13 older women (64.08 ± 4.27 years, 69.98 ± 10.56 kg, 157.90 ± 8.66 cm, 28.25 ± 4.22 kg/m²). The participants visited the laboratory for five consecutive days, among which the first two were used for familiarization. During the other three days the participants underwent experimental conditions: control (C) stretch 30 seconds (AE30) and stretch 60 seconds (AE60). For the AE30 and AE60 conditions, three series of passive static stretching were performed, with duration of 30 and 60 seconds, respectively. The experimental conditions were performed with an interval of at least 24 hours between them and the order of execution was randomized. The recording of isometric Cf-t of the knee extensor muscles was performed in extensor chair connected to a force transducer. Measurements were recorded immediately after each experimental condition, for five seconds. For statistical analysis, descriptive procedures were used and ANOVA one way to check possible changes on the Maximal Voluntary Contraction (CVM) and Peak Rate of Force Development (TDFP) among the three conditions (p <0.05). The ANOVA showed no statistically significant difference for CVM and TDFP, between the three conditions. It can be concluded that different volumes of static stretching, three sets ...(Complete abstract click electronic access below)

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Over the years, the concern with the detection of the levels of radionuclides in the environment has increased, given that they are carcinogenic to the human respiratory system. Present in the air, waters, soil and building materials, among other substances, radionuclides are unknown by most of the population. In this paper, we present the radioactive gas 222Rn, predominant element among all others and one way of detecting it in an example study of the waters of the Presidente Prudente - SP, through the plastic detector called CR-39. Likewise, we realized the need to approach this issue more broadly in schools and even in higher education, since this field of modern physics and environmental physics usually appears only in master's and doctorate. Thus, we attempted to perform the didactic transposition schooluniversity, through the construction of an object Educational, OE, to be placed on the Bank for International Educational Objects - bioethanol and by developing this contribute to the knowledge and understanding of the importance of monitoring of radioactivity in a way accessible to the population as a whole

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The cosmetic industry has presenting growth in Brazil and one way to support this demand is improving production and reducing waste. Wastes can be related to setup time, which is spent to support demand of product´s mix and volume. One of the methodologies used to reduce setup time is SMED (Single Minute Exchange of Die). This paper aims to describe and analyze the setup process in a production line in a cosmetic industrial branch, before and after the application of SMED methodology, highlighting good practices and difficulties in order to help other companies develop fast setup. The research method used was the case study. From the analysis of the implementation of the methodology on the company which is object from the case study was possible to summarize good practices, such as: the use of pillar E&T to store information about the training on the SMED methodology; creation of a multifunctional teamwork and involving different areas; creation of a “From-To” matrix. Difficulties were identified, such as: high and constant turnover of people who work on the shop floor; lack of discipline in filling the forms and by doing the setup activities that were standardized; lack of financial resources; lack of people´s availability in orer to conduct necessary meetings and trainings. Recommendations for other companies have also been proposed, such as: training of the team involved, before starting the project and a refresher training; standardization of training, forms and documentation of all steps of the project; create a multifunctional team; training after an employee, who is responsible for the setup, leaves the company

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Currently the company suffers a heavy influence of media, through their tentacles people are reached and clawed into a consumerist context, and the reason for the success of this market share is linked to aesthetics. An ideal beauty standard is followed, aimed at recognizing social, emotional success, professional and loving. Thus, people are accustomed from his childhood with the image of a perfect prince or princess, heroes that is becoming increasingly more muscular and developed throughout the evolution of cinema. While the aesthetic perfection is internalized by society and see that this beauty is not a particular good for some people, but everyone should become pretty standard to suit hence those who do not fit this stereotype are somehow excluded from the circle of society standard. One way people try to develop and hone the look is through weight training exercises in specialized academies. The problem is when it appears not the contentment of the individual in relation to his body. Even when your muscles are increasing, for the person who suffers from Vigorexia changes are significant to the point never to be content with their state of development, which is seen distorted and underestimated. Thus this paper aims to describe the situation and how the routine Vigorexia context and people are distorted to suit the aesthetic and social demands that are made, through a literature search on the muscle dysmorphia. It is of paramount importance to know the pathological picture of Vigorexia not only by professionals of Psychology, Psychiatry and Medicine, but also for Physical Educators that are constantly present in an active and that can positively or negatively influence the routine and pathological picture of these people with Muscular Dysmorphia

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Continuous improvement of industrial processes is one way to become companies more competitive in the market. For this, a fairly widespread use is the methodology of lean production systems, by eliminating waste. One of the tools of these systems is the method of rapid exchange of die or also called SMED, which will be applied in this study. The study aims to develop proposals for reducing the time of set up of two machines in two machining lines, watching also the ergonomics and safety conditions in this operations. The set up time reduction is justified among others, due to increase the machine productivity. In applying the connecting rod machining line, there were two types of exchange. Reductions in time to set up proposals reached values of 47% to one of them, and 55% to the other. It is important to underline that to reach this result, there was no need for large investments. In the application in block machining line, was developed an improvement in the ergonomic area. It was placed a pulley block that came to increase the time of tool change. Aiming to improve the security of the exchange, without productivity loss, the method was applied to reduce this time. It was developed two proposals.: the first would reduce that time by 19%, and does not require many resources of the company. The second involves the parallelization of the exchange, so that the reduction is 48%. However, this proposal requires one more manpower at the time of exchange and it is not always possible

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Pós-graduação em Cirurgia Veterinária - FCAV

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Pós-graduação em Medicina Veterinária - FCAV

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Pós-graduação em Cirurgia Veterinária - FCAV

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Pós-graduação em Fisioterapia - FCT

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The automobile industry is increasingly interested in reducing vehicle weight for greater speed, lower fuel consumption and emissions, through innovation of materials and processes. One way to do this is to seek the replacement of conventional processes by the use of structural adhesives. Structural adhesives are highly resistant materials, which can replace rivets, bolts and welds allowing the substrate / adhesive assemble is stronger than the substrate itself. One of the major advantages of gluing with respect to welding is its esthetic appearance, since it does not leave marks. For this reason, parts to be soldered require a minimum thickness so that the marks do not appear, since the pieces from gluing have no restriction as to the thickness. By replacing the vibration welding process for gluing process of the instrument panel parts of an automobile, one obtains a reduction of the thickness of the parts and therefore it decreases the weight of the car. This work aims to study the various structural adhesives that already exist on the market to be applied on the instrument panel. The mechanical test performed to measure the maximum adhesive strength was the Lap Shear Test at 23°C (room temperature), -35°C and 85°C. The types of adhesives used were the hot-melt and the bi-component. By the results obtained, it is in favor using the bi-component for application to the union of instrument panel parts

Relevância:

80.00% 80.00%

Publicador:

Resumo:

To the companies maintain competitive in the market, they need continuous improvement in quality and productivity. This continuous improvement can be achieved through lean manufacturing tools. The idea of lean manufacturing is to map the flow to identify the processes that don’t add value in the final product, according the customer specification, in others words is eliminate or reduce the waste on the production flow. However the implementation of lean manufacturing is not so simple and involves the resistance of the employees, lack of training and the lack of knowledge to make the implementation. The objective of this study is determinate the good practices and difficulties found by a multinational company in the field of healthy that aims implementing the Lean Manufaturing through an internal certification. The methodology used to approach the problem is a case of study that analyzes the information introduced through discussion made by a semi structured interview. The case study describes the steps to get the certification, involving the concepts of 5S, balancing, standardization and routine management. The literature and the study case showed that the good practices, such as productivity increases, safety level increases and the machine stability were accomplished, but the majority difficulties was found in cultural factors and planning. Some recommendations were proposed to the others companies, such as the elaboration of a qualification matrix and the review of the activities chronogram during the implementation. The way that the company found to implement Lean Manufacturing concepts was a creative method to show to everybody the objective and the target to be accomplished and is one way to recognize the effort through the certification