34 resultados para Road drainage.
Resumo:
In this road-crossing simulation study, we assessed both participant's ability to visually judge whether or not they could cross a road, and their adaptive walking behavior. To this end, participants were presented with a road inside the laboratory on which a bike approached with different velocities from different distances. Eight children aged 5-7, ten children aged 10-12, and ten adults were asked both to verbally judge whether they could cross the road, and to actually walk across the road if possible. The results indicated that the verbal judgments were not similar to judgments to actually cross the road. With respect to safety and accuracy of judgments, groups did not differ from each other, although the youngest group tended to be more cautious. All groups appeared to use a strategy to cross the road based both on the distance and the velocity of the approaching bike. Young children waited longer on the curb before crossing the road than older children and adults. All groups adjusted their crossing time to the time-to-arrival of the bike. These findings are discussed in relation to the ecological psychological approach and the putative dissociation between vision for perception (i.e. verbal judgment) and vision for action (i.e. actual crossing). (c) 2004 Elsevier Ltd. All rights reserved.
Resumo:
Aim: Children with cerebral palsy (CP) are regularly confronted with physical constraints during locomotion. Because abnormalities in motor control are often related to perceptual deficits, the aim of this study was to find out whether children with CP were able to walk across a road as safely as their non-handicapped peers. Method: Ten children with CP and 10 non-handicapped children aged 4-14 y were asked to cross a simulated road if they felt the situation was safe. Results: With respect to safety and accuracy of crossings, the behaviour of children with CP was comparable with that of non-handicapped children. However, a closer examination of children's individual crossing behaviour showed considerable differences within the CP group. In contrast to children with damage to the left hemisphere, children with damage to the right hemisphere made unsafe decisions and did not compensate for them by increasing walking speed.Conclusion: the differences in unsafe behaviour and in the ability to compensate for it within the group of children with CP might be related to damage to specific regions of the brain that are involved in the processing of spatial or temporal information.
Resumo:
The planning of the transportation sector in Brazil has long been the railroads as the main engineering system of the country. Thus, it was used to carry, in addition to the physical integration of the national territory, the consolidation of its domestic market. However, after entering in the 1980s, the planning of the sector is left out, and an inversion of the matrix of development is observed, with share gains in monoculture economy and on development of new areas where agricultural expansion advanced. This situation culminated in logistics blackouts in the 1990s and the resumption of sector planning in the early twenty-first century. At this time, it establishes a new institutional apparatus that ensures the participation of private capital in the sector, as well as a new principle for resolving bottlenecks concentrated regions (economically dynamic), from targeting investments to areas of primary economies that only in recent decades have been incorporated into the national economy.
Resumo:
The time and the distance traveled during the acceleration and the velocity retaking are parameters used for the comparison and the project of vehicles. In this paper equations for the calculation of those parameters are presented. Several criteria are presented for the shift gears. It is also verified the occurrence or not of total slip during the acceleration of the vehicle. The theoretical models were implemented in a developed computational system. Such system was applied in a Mercedes-Benz do Brazil sample vehicle, in order to facilitate comparisons between the simulate values and the experimental road tests. Copyright © 1997 Society of Automotive Engineers, Inc.
Resumo:
The fuel consumption is an important factor in the vehicle development due the fact that it has a direct effect on its trade aims. Besides that, it is known that the petrol is a scarce fuel. In this paper it is presented a procedure of fuel consumption calculation for a vehicle traveling in driving schedule. In such calculation it has been taken into account the operational conditions (load, pavement, climbing road, among others) and the building characteristics (map engine, transmission, frontal area, tire, among others) of road vehicles. There has also been an application of the theoretical model developed in a sample Mercedes-Benz do Brasil vehicle which has been compared with the values of experimental tests. Copyright © 1997 Society of Automotive Engineers, Inc.
Resumo:
The acquisition and update of Geographic Information System (GIS) data are typically carried out using aerial or satellite imagery. Since new roads are usually linked to georeferenced pre-existing road network, the extraction of pre-existing road segments may provide good hypotheses for the updating process. This paper addresses the problem of extracting georeferenced roads from images and formulating hypotheses for the presence of new road segments. Our approach proceeds in three steps. First, salient points are identified and measured along roads from a map or GIS database by an operator or an automatic tool. These salient points are then projected onto the image-space and errors inherent in this process are calculated. In the second step, the georeferenced roads are extracted from the image using a dynamic programming (DP) algorithm. The projected salient points and corresponding error estimates are used as input for this extraction process. Finally, the road center axes extracted in the previous step are analyzed to identify potential new segments attached to the extracted, pre-existing one. This analysis is performed using a combination of edge-based and correlation-based algorithms. In this paper we present our approach and early implementation results.
Resumo:
This paper presents a semi-automated method for extracting road segments from medium-resolution images based on active testing and edge analysis. The method is based on two sequential and independent stages. Firstly, an active testing method is used to extract an approximated road centreline which is based on a sequential and local exploitation of the image. Secondly, an iterative strategy based on edge analysis and the approximated centreline is used to measure precisely the road centreline. Based on the results obtained using medium-resolution test images, the method seems to be very promising. In general, the method proved to be very accurate whenever the roads are characterized by two well-defined anti-parallel edges and robust even in the presence of larger obstacles such as trees and shadows.
Resumo:
This paper presents a dynamic programming approach for semi-automated road extraction from medium-and high-resolution images. This method is a modified version of a pre-existing dynamic programming method for road extraction from low-resolution images. The basic assumption of this pre-existing method is that roads manifest as lines in low-resolution images (pixel footprint> 2 m) and as such can be modeled and extracted as linear features. On the other hand, roads manifest as ribbon features in medium- and high-resolution images (pixel footprint ≤ 2 m) and, as a result, the focus of road extraction becomes the road centerlines. The original method can not accurately extract road centerlines from medium- and high- resolution images. In view of this, we propose a modification of the merit function of the original approach, which is carried out by a constraint function embedding road edge properties. Experimental results demonstrated the modified algorithm's potential in extracting road centerlines from medium- and high-resolution images.
Resumo:
This article presents an automatic methodology for extraction of road seeds from high-resolution aerial images. The method is based on a set of four road objects and another set of connection rules among road objects. Each road object is a local representation of an approximately straight road fragment and its construction is based on a combination of polygons describing all relevant image edges, according to some rules embodying road knowledge. Each one of the road seeds is composed by a sequence of connected road objects, in which each sequence of this type can be geometrically structured as a chain of contiguous quadrilaterals. Experiments carried out with high-resolution aerial images showed that the proposed methodology is very promising in extracting road seeds. This article presents the fundamentals of the method and the experimental results, as well.
Resumo:
This paper presents an automatic methodology for road network extraction from medium-and high-resolution aerial images. It is based on two steps. In the first step, the road seeds (i.e., road segments) are extracted using a set of four road objects and another set of connection rules among road objects. Each road object is a local representation of an approximately straight road fragment and its construction is based on a combination of polygons describing all relevant image edges, according to some rules embodying road knowledge. Each road seed is composed by a sequence of connected road objects in which each sequence of this type can be geometrically structured as a chain of contiguous quadrilaterals. In the second step, two strategies for road completion are applied in order to generate the complete road network. The first strategy is based on two basic perceptual grouping rules, i.e., proximity and collinearity rules, which allow the sequential reconstruction of gaps between every pair of disconnected road segments. This strategy does not allow the reconstruction of road crossings, but it allows the extraction of road centerlines from the contiguous quadrilaterals representing connected road segments. The second strategy for road completion aims at reconstructing road crossings. Firstly, the road centerlines are used to find reference points for road crossings, which are their approximate positions. Then these points are used to extract polygons representing the contours of road crossings. This paper presents the proposed methodology and experimental results. © Pleiades Publishing, Inc. 2006.
Resumo:
The formation of sulfated zirconia films from a sol-gel derived aqueous suspension is subjected to double-optical monitoring during batch dip coating. Interpretation of interferometric patterns, previously obscured by a variable refractive index, is now made possible by addition of its direct measurement by a polarimetric technique in real time. Significant sensitivity of the resulting physical thickness and refractive index curves (uncertainties of ±7 nm and ±0.005, respectively) to temporal film evolution is shown under different withdrawal speeds. As a first contribution to quantitative understanding of temporal film formation with varying nanostructure during dip coating, detailed analysis is directed to the stage of the process dominated by mass drainage, whose simple modeling with temporal t-1/2 dependence is verified experimentally. © 2006 Elsevier B.V. All rights reserved.
Resumo:
The objective of this study was to evaluate the toxicity of water which flows toward the beaches of Santos, SP, Brazil. Water samples were collected from eight urban drainage channels and a small creek, in March, April and August 2005. For each sample, some physical-chemical parameters were analyzed: pH, dissolved oxygen, temperature, salinity, presence of free chlorine and total ammonia contents. Acute toxicity tests (48h) with Daphnia similis were also performed with the samples. The level of ammonia was relatively high in the majority of the samples (≥ 1.5 mg/L), and free chlorine was measurable in most of them. Acute toxicity was observed in four water samples (stations 3, 4, 5 and 7), at least in one occasion. The toxicity was positively correlated with the ammonia concentrations and salinity. Because acute toxicity was detected, actions aiming to control the pollution sources and improve the water quality are recommended.
Resumo:
The agricultural unpaved roads are important road structures for the economic and social agricultural development of the Nation, and the erosion provoked by rain water in the road bed and sides are closely related to bad draining, one of the main factors for their degradation. In order to make the draining system adequate, it is necessary to know about erodibility, infiltration capacity of water in the ground and adoption of mechanical slope abatement with grid elevation and water interception. This study presents drainage model through the construction of terraces with gradient transversally associated to the capitation basin in abruptic red dystrophic argisol soils, medium sandy texture, based on slops abatement techniques, elevating the road bed and deviating flow. The grain sized fractions of this ground (sand, silt, clay) and the aggregate stability indicated that this ground, under anthropic action, presents erosive processes resulting in superficial draining with ground hauling, sanding sources and courses of water situation below roads, providing great environmental impacts in the hydric bodies. The reduction of erosion problems in these unpaved roads is in the adoption of measures that intercept waters from the draining of their stream bed itself, as well as pluvial waters comings from adjacent areas of contribution, that are collected and conducted to inlaid terraces and capitation basis.