89 resultados para Programming languages (Electronic computers) - Semantics
Resumo:
Deterministic Optimal Reactive Power Dispatch problem has been extensively studied, such that the demand power and the availability of shunt reactive power compensators are known and fixed. Give this background, a two-stage stochastic optimization model is first formulated under the presumption that the load demand can be modeled as specified random parameters. A second stochastic chance-constrained model is presented considering uncertainty on the demand and the equivalent availability of shunt reactive power compensators. Simulations on six-bus and 30-bus test systems are used to illustrate the validity and essential features of the proposed models. This simulations shows that the proposed models can prevent to the power system operator about of the deficit of reactive power in the power system and suggest that shunt reactive sourses must be dispatched against the unavailability of any reactive source. © 2012 IEEE.
Resumo:
In this study, a novel approach for the optimal location and contract pricing of distributed generation (DG) is presented. Such an approach is designed for a market environment in which the distribution company (DisCo) can buy energy either from the wholesale energy market or from the DG units within its network. The location and contract pricing of DG is determined by the interaction between the DisCo and the owner of the distributed generators. The DisCo intends to minimise the payments incurred in meeting the expected demand, whereas the owner of the DG intends to maximise the profits obtained from the energy sold to the DisCo. This two-agent relationship is modelled in a bilevel scheme. The upper-level optimisation is for determining the allocation and contract prices of the DG units, whereas the lower-level optimisation is for modelling the reaction of the DisCo. The bilevel programming problem is turned into an equivalent single-level mixed-integer linear optimisation problem using duality properties, which is then solved using commercially available software. Results show the robustness and efficiency of the proposed model compared with other existing models. As regards to contract pricing, the proposed approach allowed to find better solutions than those reported in previous works. © The Institution of Engineering and Technology 2013.
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Quando a área a ser irrigada apresenta um elevado gradiente de declive na direção das linhas de derivação, uma opção de dimensionamento é o uso de tubulações com vários diâmetros para economizar no custo e também para manter a variação de pressão dentro dos limites desejados. O objetivo deste trabalho foi desenvolver um modelo de programação linear para dimensionar sistemas de irrigação por microaspersão com linhas de derivação com mais de um diâmetro e operando em declive, visando a minimização do custo anualizado da rede hidráulica e do custo anual com energia elétrica, além de assegurar que a máxima variação de carga hidráulica na linha será respeitada. Os dados de entrada são: configuração da rede hidráulica do sistema de irrigação, custo de todos os componentes da rede hidráulica e custo da energia. Os dados de saída são: custo anual total, diâmetro da tubulação em cada linha do sistema, carga hidráulica em cada ponto de derivação e altura manométrica total. Para ilustrar a potencialidade do modelo desenvolvido, ele foi aplicado em um pomar de citros no Estado de São Paulo, Brasil. O modelo demonstrou ser eficiente no dimensionamento do sistema de irrigação quanto à obtenção da uniformidade de emissão desejada. O custo anual com bombeamento deve ser considerado no dimensionamento de sistemas de irrigação por microaspersão porque ele gera menores valores de custo anual total quando comparado com a mesma alternativa que não considera aquele custo.
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
The aim of this study was to develop a laboratory method for time response evaluation on electronically controlled spray equipment using Programmable Logic Controllers (PLCs). For that purpose, a PLC controlled digital drive inverter was set up to drive an asynchronous electric motor linked to a centrifugal pump on a experimental sprayer equipped with electronic flow control. The PLC was operated via RS232 serial communication from a PC computer. A user program was written to control de motor by adjusting the following system variables, all related to the motor speed: time stopped; ramp up and ramp down times, time running at a given constant speed and ramp down time to stop the motor. This set up was used in conjunction with a data acquisition system to perform laboratory tests with an electronically controlled sprayer. Time response for pressure stabilization was measured while changing the pump speed by +/-20%. The results showed that for a 0.2 s ramp time increasing the motor speed, as an example, an AgLogix Flow Control system (Midwest Technologies Inc.) took 22 s in average to readjust the pressure. When decreasing the motor speed, this time response was down to 8 s. General results also showed that this kind of methodology could make easier the definition of standards for tests on electronically controlled application equipment.
Resumo:
This paper describes the development and solution of binary integer formulations for production scheduling problems in market-driven foundries. This industrial sector is comprised of small and mid-sized companies with little or no automation, working with diversified production, involving several different metal alloy specifications in small tailor-made product lots. The characteristics and constraints involved in a typical production environment at these industries challenge the formulation of mathematical programming models that can be computationally solved when considering real applications. However, despite the interest on the part of these industries in counting on effective methods for production scheduling, there are few studies available on the subject. The computational tests prove the robustness and feasibility of proposed models in situations analogous to those found in production scheduling at the analyzed industrial sector. (C) 2010 Elsevier Ltd. All rights reserved.
Resumo:
In this paper it is proposed a novel hybrid three-phase rectifier capable to achieve high input power factor (PF), and low total harmonic distortion in the input currents (THDI). The proposed hybrid high power rectifier is composed by a standard three-phase 6-pulses diode rectifier (Graetz bridge) with a parallel connection of single-phase Boost rectifiers in each three-phase rectifier leg. Such topology results in a structure capable of programming the input current waveform and providing conditions for obtaining high input power factor and low harmonic current distortion. In order to validate the proposed hybrid rectifier, this paper describes its principles of operation, with detailed experimental results and discussions on power rating of the required Boost converters as related to the desired total harmonic current distortion. It is demonstrated that only a fraction of the output power is processed through the Boost converters, making the proposed solution economically viable for very high power installations, with fast pay back of the investment. Moreover, retrofitting to existing installations is also feasible since the parallel path can be easily controlled by integration with the existing de-link. A prototype rated at 6 kW has been implemented in laboratory and fully demonstrated its operation, performance and feasibility to high power applications. © 2005 IEEE.
Resumo:
Pós-graduação em Estudos Linguísticos - IBILCE
Resumo:
Pós-graduação em Engenharia Elétrica - FEIS
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)