23 resultados para Dual-process Model


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

40.00% 40.00%

Publicador:

Resumo:

An economic model including the labor resource and the process stage configuration is proposed to design g charts allowing for all the design parameters to be varied in an adaptive way. A random shift size is considered during the economic design selection. The results obtained for a benchmark of 64 process stage scenarios show that the activities configuration and some process operating parameters influence the selection of the best control chart strategy: to model the random shift size, its exact distribution can be approximately fitted by a discrete distribution obtained from a relatively small sample of historical data. However, an accurate estimation of the inspection costs associated to the SPC activities is far from being achieved. An illustrative example shows the implementation of the proposed economic model in a real industrial case. (C) 2011 Elsevier B.V. All rights reserved.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The Predispatch model (PD) calculates a short-term generation policy for power systems. In this work a PD model is proposed that improves two modeling aspects generally neglected in the literature: voltage/reactive power constraints and ramp rate constraints for generating units. Reactive power constraints turn the PD into a non-linear problem and the ramp rate constraints couple the problem dynamically in time domain. The solution of the PD is turned into a harder task when such constraints are introduced. The dual decomposition/ lagrangian relaxation technique is used in the solution approach for handing dynamic constraints. As a result the PD is decomposed into a series of independent Optimal Power Flow (FPO) sub problems, in which the reactive power is represented in detail. The solution of the independent FPO is coordinated by means of Lagrange multipliers, so that dynamic constraints are iteratively satisfied. Comparisons between dispatch policies calculated with and without the representation of ramp rate constraints are performed, using the IEEE 30 bus test system. The results point-out the importance of representing such constraints in the generation dispatch policy. © 2004 IEEE.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper presents a proposal of a model to measure the efficiency of outsourced companies in the aeronautical industry applying the methods DEA and AHP. It also proposes an evaluation in the relation between the variables of the process and the value obtained for the effiiency. The criteria of Quality, Time and Cost were considered the outputs of the process, and those criteria were quantified by AHP for DEA matrix.The number of technical documents received by those outsorced companies were considered the input of the process. The other purpose is to separate the companies in groups considered able to receive an investment to improve their process. Copyright © 2008 SAE International.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In this paper we present a mixed integer model that integrates lot sizing and lot scheduling decisions for the production planning of a soft drink company. The main contribution of the paper is to present a model that differ from others in the literature for the constraints related to the scheduling decisions. The proposed strategy is compared to other strategies presented in the literature.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Following the study of the Topologically Massive Theories under the Hamilton-Jacobi, we now analyze the constraint structure of the Self-Dual model as well as its correspondence with the Topologically Massive Electrodynamics. © 2013 American Institute of Physics.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The development of self-adaptive software (SaS) has specific characteristics compared to traditional one, since it allows that changes to be incorporated at runtime. Automated processes have been used as a feasible solution to conduct the software adaptation at runtime. In parallel, reference model has been used to aggregate knowledge and architectural artifacts, since capture the systems essence of specific domains. However, there is currently no reference model based on reflection for the development of SaS. Thus, the main contribution of this paper is to present a reference model based on reflection for development of SaS that have a need to adapt at runtime. To present the applicability of this model, a case study was conducted and good perspective to efficiently contribute to the area of SaS has been obtained.