337 resultados para Power Flow Control, Radial Distribution System, Distributed Generator (DG)


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Elétrica - FEIS

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Elétrica - FEIS

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Elétrica - FEIS

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In an ever more competitive environment, power distribution companies must satisfy two conflicting objectives: minimizing investment costs and the satisfaction of reliability targets. The network reconfiguration of a distribution system is a technique that well adapts to this new deregulated environment for it allows improvement of reliability indices only opening and closing switches, without the onus involved in acquiring new equipment. Due to combinatorial explosion problem characteristic, in the solution are employed metaheuristics methods, which converge to optimal or quasi-optimal solutions, but with a high computational effort. As the main objective of this work is to find the best configuration(s) of the distribution system with the best levels of reliability, the objective function used in the metaheuristics is to minimize the LOLC - Loss Of Load Cost, which is associated with both, number and duration of electric power interruptions. Several metaheuristics techniques are tested, and the tabu search has proven to be most appropriate to solve the proposed problem. To characterize computationally the problem of the switches reconfiguring was developed a vector model (with integers) of the representation of the switches, where each normally open switch is associated with a group of normally closed switches. In this model simplifications have been introduced to reduce computational time and restrictions were made to exclude solutions that do not supply energy to any load point of the system. To check violation of the voltage and loading criteria a study of power flow for the ten best solutions is performed. Also for the ten best solutions a reliability evaluation using Monte Carlo sequential simulation is performed, where it is possible to obtain the probability distributions of the indices and thus calculate the risk of paying penalty due to not meeting the goals. Finally, the methodology is applied in a real Brazilian distribution network, and the results are discussed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper considers the congestion effects on emission and consumers' allocated cost. In order to consider some environmental and operational effects of congestion, an environmental constrained active-reactive optimal power flow (AROPF) considering capability curve is presented. On outage conditions, the total cost of the system will increase. On the other hand in power systems, the operating cost and system emission have conflicted objectives, then it may be concluded that the outage in the system may lead to a total emission decrease. In this paper the famous Aumann-Shapley method is used as a pricing methodology. Two case studies such as 14-bus and US-bus IEEE test systems are conducted. Results demonstrate that, although the line outage in power systems leads to increase the total cost, the amount of emission depending on the place where the outage occurs can be more than, less than or equal to the normal conditions' emission. Also results show that although from power sellers' standpoint the well-known Aumann-Shapley method is a precise pricing method to cover the incurred cost with an acceptable error that can show the real effect of congestion on consumers' cost, from consumers' standpoint it is not a good method for cost allocation, because some consumers will face with an increase in cost and the others will face with a decrease on their cost.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The objective of this work is to study the implantation feasibility of a small hydropower system in a rural area in Guaratinguetá. Due to its location and accessibility, and the costs involved in extending the public distribution line to the property it could turn become viable the construction of an individual electric generation system. As alternatives, a solar photovoltaic system and combustion engine-electric generator systems were considered. However, the existence of a small river inside the property, the construction of a micro hydropower plant was taken into account. The choice of the micro power hydropower plant was determined by the owner and was based on the costs. The topographic and hydrological profiles as well as the geometrical characteristics of the system, including the civil infrastructure needed and the more adequate turbine, were determined. Finally, the cost spreadsheet was set and the results were compared with those calculated for the extension of the available public distribution system

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Elétrica - FEIS

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Elétrica - FEIS

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Elétrica - FEIS

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A new mixed-integer linear programming (MILP) model is proposed to represent the plug-in electric vehicles (PEVs) charging coordination problem in electrical distribution systems. The proposed model defines the optimal charging schedule for each division of the considered period of time that minimizes the total energy costs. Moreover, priority charging criteria is taken into account. The steady-state operation of the electrical distribution system, as well as the PEV batteries charging is mathematically represented; furthermore, constraints related to limits of voltage, current and power generation are included. The proposed mathematical model was applied in an electrical distribution system used in the specialized literature and the results show that the model can be used in the solution of the PEVs charging problem.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The theory presented in this paper was primarily developed to give a physical interpretation for the instantaneous power flow on a three-phase induction machine, without a neutral conductor, on any operational state and may be extended to any three-phase load. It is a vectorial interpretation of the instantaneous reactive power theory presented by Akagi et al. Which, believe the authors, isn't enough developed and its physical meaning not yet completely understood. This vectorial interpretation is based on the instantaneous complex power concept defined by Torrens for single-phase, ac, steady-state circuits, and leads to a better understanding of the power phenomenon, particularly of the distortion power. This concept has been extended by the authors to three-phase systems, through the utilization of the instantaneous space vectors. The results of measurements of instantaneous complex power on a self-excited induction generator's terminals, during an over-load application transient, are presented for illustration. The compensation of reactive power proposed by Akagi is discussed and a new horizon for the theory application is opened.