233 resultados para Métodos para a tomada de decisão
Resumo:
The use of geographic information systems (GIS), combined with advanced analysis technique, enables the standardization and data integration, which are usually from different sources, allowing you to conduct a joint evaluation of the same, providing more efficiency and reliability in the decision-making process to promote the adequacy of land use. This study aimed to analyze the priority areas of the basin agricultural use of the Capivara River, Botucatu, SP, through multicriterial analysis, aiming at conservation of water resources. The results showed that the Geographic Information System Idrisi Selva combined with advanced analysis technique and the weighted linear combination method proved to be an effective tool in the combination of different criteria, allowing the determination of the adequacy of agricultural land use less subjective way. Environmental criteria were shown to be suitable for the combination and multi-criteria analysis, allowing the preparation of the statement of suitability classes for agricultural use and can be useful for regional planning and decision-making by public bodies and environmental agents because the method takes into account the rational use of land and allowing the conservation of hydrics resources.
Aplicação de análise multicriterial para determinação de áreas prioritárias à recomposição florestal
Resumo:
Using the Geographic Information System (GIS) and taking into account its capability to analyze spatial data, a database of updated spatial data from the sub-basin of the Descalvado stream, Botucatu, SP, was developed to provide an evaluation and diagnosis of the area concerning land use and the degradation processes therein. Through GIS, priority areas for forest recovery were defined by Multicriteria Evaluation and using the Ordered Weighted Average method. The latter allows the decision maker to define the area to be recovered, facing limitation of resources, among one of the proposed scenarios, or do it in stages. The study showed that there are accelerated erosion processes in the headwaters of the springs of water bodies; there is also fragmentation of native vegetation, especially in hillside areas, and little presence of native vegetation in riparian areas. The application of the multicriteria analysis using the Ordered Weighted Average was important as it systematized and discriminated scenarios of priority for forest recovery.
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Pós-graduação em Agronegócio e Desenvolvimento - Tupã
Resumo:
Pós-graduação em Enfermagem (mestrado profissional) - FMB
Resumo:
Due to the increasing demand from clients and the search for better performances in the heavy vehicles industry, a progressive evolution in technology in a general way was needed. This paper uses a scientific method to validate, prior to its manufacture, the project of an agricultural wheel for sugar cane harvesters. Monte Carlo Simulation is used in conjunction with Finite Elements Method, in order to simulate the wheel's behavior in a cornering test, identify possible failure regions and get an estimate for its life under fatigue. To this end, test conditions according to EUWA Standards were simulated and obeyed, relevant to fatigue. Simulation results were interesting, according to industry experts involved in the project and manufacture of the product in question, and have provided important elements for the decision making regarding improvements that could be made on the product project before its execution
Resumo:
The building budgeting quickly and accurately is a challenge faced by the companies in the sector. The cost estimation process is performed from the quantity takeoff and this process of quantification, historically, through the analysis of the project, scope of work and project information contained in 2D design, text files and spreadsheets. This method, in many cases, present itself flawed, influencing the making management decisions, once it is closely coupled to time and cost management. In this scenario, this work intends to make a critical analysis of conventional process of quantity takeoff, from the quantification through 2D designs, and with the use of the software Autodesk Revit 2016, which uses the concepts of building information modeling for automated quantity takeoff of 3D model construction. It is noted that the 3D modeling process should be aligned with the goals of budgeting. The use of BIM technology programs provides several benefits compared to traditional quantity takeoff process, representing gains in productivity, transparency and assertiveness
Resumo:
Pós-graduação em Agronomia (Energia na Agricultura) - FCA