170 resultados para Robôs – projeto e construção


Relevância:

30.00% 30.00%

Publicador:

Resumo:

This work aims to understand the multimedia Learning Objects (LO's) developed within the CONDIGITAL project, subsidized by the federal government. The CONDIGITAL aimed to encourage the production and the use of media in teaching in high school classrooms. This work presents a reflection on the contribution of media to the construction of significant learning of student users. The research was conducted through a literature study. Therefore, it was considered the work of some researchers related to the study of the potential of these technologies in education, such as Valente (1995), Tauroco (2007) and Mussoi (2010). These readings made possible to discern some common evaluation criteria that may be used as parameters to analyze the quality of these media as educational tools. The theme of exploration is guided by a research on the motivation of the mentioned project and on its amplitude and its results, which is directed later to the LO's developed by UNICAMP team, particularly in the Mathematics productions developed by the M³ project, some of the which are presented and evaluated in this monograph

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In all segments, the companies are looking for the highest productivity with the lowest possible cost, and in the construction industry, the thinking is the same. Over time, techniques that generate more productivity supplanted previous techniques; an example is the CAD technology that replaced free drawings in projects execution. However, the Computer Aided Design (CAD) technology does not deal with certain factors that permeate the entire project. It is required the use of other techniques to supply this need in traditional projects. For example, a software for schedule management, another for assets management and a person who makes calculations for estimates and budgets. The BIM (Building Information Modeling) technology aims to integrate all this information, facilitating the communication among members of a work team and reducing the time required to carry out the project. This work is a applied research, a descriptive research, carried out through modeling and simulation, processes inherent in the use of BIM, a survey was also used only to contextualization. BIM was used for a soccer stadium roof project, in order to verify the feasibility of such use through the analysis of: BIM tools, difficulties encountered and implications of BIM use, and comparison of traditional methods and the use of BIM. To aid the contextualization, a survey was conducted to verify the use of BIM in medium and small companies

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research is part of the field of teacher training, especially developed the topic of continuing education. There is, according to the literature, the importance of this training for teachers as a sort of continuum, trajectory in which the teacher will (re) building their knowledge throughout their lives, in order to provide knowledge and values that add to your practice teaching. However, often the training activities are designed for knowledge transmitter model forming agent for the teacher, disregarding the different contexts of school communities, this strategy which hardly reaches the real needs of teachers in their daily lives. It is evident, too, the need to provide, in training moments, spaces to engage in dialogue and reflect on the teachers profession today, (re) building thus their teacher identity. In this context, the objective of this research is to examine whether the continued formation is configured as a collective construction and as a space for reflection on what it means to be a teacher. The research is characterized by a qualitative approach, and to collect data, we used the semi-structured interview technique. Participants were five teachers in the areas of Physical Education, History, English, Portuguese and Mathematics, a state school Treble city education (SP). The results show the importance of continuing education for teachers, which provides reflections, discussions, acquisition of knowledge and skills that contribute to its performance, motivating and developing strategies to enable them to face the challenges of everyday life and reflect collectively on what it means to be a teacher. It was concluded that continuing education for this group of teachers is configured as a space for collective construction, which together with other teachers rethink, reflect and continuously reconstruct their practices and objectives, and enables reflection on the teaching profession constantly. It will be essential, therefore...

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The building budgeting quickly and accurately is a challenge faced by the companies in the sector. The cost estimation process is performed from the quantity takeoff and this process of quantification, historically, through the analysis of the project, scope of work and project information contained in 2D design, text files and spreadsheets. This method, in many cases, present itself flawed, influencing the making management decisions, once it is closely coupled to time and cost management. In this scenario, this work intends to make a critical analysis of conventional process of quantity takeoff, from the quantification through 2D designs, and with the use of the software Autodesk Revit 2016, which uses the concepts of building information modeling for automated quantity takeoff of 3D model construction. It is noted that the 3D modeling process should be aligned with the goals of budgeting. The use of BIM technology programs provides several benefits compared to traditional quantity takeoff process, representing gains in productivity, transparency and assertiveness

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This work deals in a general way, the history and advantages of steel buildings, as well as its increasing usage in Brazil in the last century. This work also generally describes some types and its uses of metal frame. It also demonstrates the use of the NBR 8800: 2008 standard and its calculation methods through the scale out materials regulated in Brazil for an industrial warehouse project small and simple portico metal frame. Given that the construction requirements include a locational influence following the normative indications of the NBR 6123, for the winding scale out, since this effect combined with the permanent loads must be seriously evaluated due to the shape type effort about acting simultaneous axial force and bending moments obeying the limitations applied to the structure according to NBR 8800. As it has been explained the calculations that ensures mechanical stability and suggesting an analysis of the efficiency of the used materials