171 resultados para Nelson Rodrigues.
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
Nelson Mandela has been an example of fighting and going over the adversities since his prison in 1962 until his election to be the president of South Africa in 1994. His effort against the apartheid in South Africa might be compared to a classical hero according to the anthropological view of Eliade (1972), Campbell (1991; 2007) and Propp’s structuralist perspective (1984). His journey toward heroism and his strategies to get the adhesion of the white minority (Afrikaners) to his purposes of joining the races in South Africa will be analyzed in this article with the theoretical support of the Greimasian semiotics, Propp’s studies (1984) and anthropology. The movie Invictus will be the object of analysis as it shows the moment of Mandela’s social-political fight as the president, with the support of the local rugby team in order to have the racial integration in the country and the political support of the white minority.
Resumo:
Pós-graduação em História - FCHS
Resumo:
Pós-graduação em Ciência Animal - FMVA
Resumo:
In all segments, the companies are looking for the highest productivity with the lowest possible cost, and in the construction industry, the thinking is the same. Over time, techniques that generate more productivity supplanted previous techniques; an example is the CAD technology that replaced free drawings in projects execution. However, the Computer Aided Design (CAD) technology does not deal with certain factors that permeate the entire project. It is required the use of other techniques to supply this need in traditional projects. For example, a software for schedule management, another for assets management and a person who makes calculations for estimates and budgets. The BIM (Building Information Modeling) technology aims to integrate all this information, facilitating the communication among members of a work team and reducing the time required to carry out the project. This work is a applied research, a descriptive research, carried out through modeling and simulation, processes inherent in the use of BIM, a survey was also used only to contextualization. BIM was used for a soccer stadium roof project, in order to verify the feasibility of such use through the analysis of: BIM tools, difficulties encountered and implications of BIM use, and comparison of traditional methods and the use of BIM. To aid the contextualization, a survey was conducted to verify the use of BIM in medium and small companies