143 resultados para hydroelectric power plants


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Representative Life-Cycle Inventories (LCIs) are essential for Life-Cycle Assessments (LCAs) quality and readiness. Because energy is such an important element of LCAs, appropriate LCIs on energy are crucial, and due to the prevalence of hydropower on Brazilian electricity mix, the frequently used LCIs are not representative of the Brazilian conditions. The present study developed a LCI of the Itaipu Hydropower Plant, the major hydropower plant in the world, responsible for producing 23.8% of Brazil's electricity consumption. Focused on the capital investments to construct and operate the dam, the LCI was designed to serve as a database for the LCAs of Brazilian hydroelectricity production. The life-cycle boundaries encompass the construction and operation of the dam, as well as the life-cycles of the most important material and energy consumptions (cement, steel, copper, diesel oil, lubricant oil), as well as construction site operation, emissions from reservoir flooding, material and workers transportation, and earthworks. As a result, besides the presented inventory, it was possible to determine the following processes, and respective environmental burdens as the most important life-cycle hotspots: reservoir filling (CO(2) and CH(4) emission: land use); steel life-cycle (water and energy consumption; CO, particulates, SO(x) and NO(x) emissions); cement life-cycle (water and energy consumption; CO(2) and particulate emissions); and operation of civil construction machines (diesel consumption; NO(x) emissions). Compared with another hydropower studies, the LCI showed magnitude adequacy, with better results than small hydropower, which reveals a scale economy for material and energy exchanges in the case of ltaipu Power Plant. (C) 2009 Elsevier Ltd. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this work it is proposed to validate an evolutionary tuning algorithm in plants composed by a grid connected inverter. The optimization aims the tuning of the slopes of P-Ω and Q-V curves so that the system is stable, damped and minimum settling time. Simulation and experimental results are presented to prove the feasibility of the proposed approach. However, experimental results demonstrate a compromising effect of grid frequency oscillations in the active power transferring. In addition, it was proposed an additional loop to compensate this effect ensuring a constant active power flow. © 2011 IEEE.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents a power system capacity expansion planning modelconsidering carbon emissions constraints. In addition to the traditionaltechnical and economical issues usually considered in the planning process, two environmental policies that consist on the taxation and the annual limitsof carbon dioxide (CO 2) emissions are considered. Furthermore, the gradualretirement of old inefficient generation plants has been included. The approachguarantees a cleaner electricity production in the expanded power system ata relatively low cost. The proposed model considers the transmission systemand is applied to a 4-region and 11-region power systems over a 20-yearplanning horizon. Results show practical investment decisions in terms of sustainability and costs.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this work, experimental results are reported for a small scale cogeneration plant for power and refrigeration purposes. The plant includes a natural gas microturbine and an ammonia/water absorption chiller fired by steam. The system was tested under different turbine loads, steam pressures and chiller outlet temperatures. An evaluation based on the 1st and 2nd Laws of Thermodynamics was also performed. For the ambient temperature around 24°C and microturbine at full load, the plant is able to provide 19 kW of saturated steam at 5.3 bar (161 °C), corresponding to 9.2 kW of refrigeration at -5 °C (COP = 0.44). From a 2nd law point-of-view, it was found that there is an optimal chiller outlet temperature that maximizes the chiller exergetic efficiency. As expected, the microturbine presented the highest irreversibilities, followed by the absorption chiller and the HRSG. In order to reduce the plant exergy destruction, it is recommended a new design for the HRSG and a new insulation for the exhaust pipe. © 2013 Elsevier Ltd. All rights reserved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In Brazil, The power generation has always depended on the rivers, in other words, there are moments that the power generation can vary, which can cause variations in energy supply and even blackout according to the level of water in the reservoirs of the hydroelectric plants. For this reason, many options has been studied, like our example, which is about a combined cycle power plant in Canas. The use of combined cycle is interesting from the point o view of energy, because its efficiency is between 50 and 60%, and from the point of view of environment, because it can burn natural gas, which is cleaner than coal, it reduces the emission of gases that influence on the greenhouse effect. This work aims to perform a technical analysis of a case study of a power plant proposed to be built in Canas by the AES/AES Tietê Group. For the analysis will be used the commercial software GateCycle 6.0.0 from GE, this software has the power of simulating power generation cycles (nuclear, combined, etc.). The energy department of UNESP has the license, which makes possible the academic use of this tool. Two combined cycles were simulated, one using one pressure level HRSG, and another one closer to the real power plant, which is a combined cycle with a three pressure level HRSG. The results were close to expected, for the combined cycle with one pressure HRSG the power was 513,9 MW and a efficiency of 53,27%, in the case with the three pressure level HRSG the power was 517,1 MW and a efficiency of 53,5%. We conclude that the software requires that the user must have the knowledge about the subjects involved in the use of GateCycle in problems resolutions

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Elétrica - FEB