In this paper, a mathematical model is derived via Lagrange's Equation for a shear building structure that acts as a foundation of a non-ideal direct current electric motor, controlled by a mass loose inside a circular carving. Non-ideal sources of vibrations of structures are those whose characteristics are coupled to the motion of the structure, not being a function of time only as in the ideal case. Thus, in this case, an additional equation of motion is written, related to the motor rotation, coupled to the equation describing the horizontal motion of the shear building. This kind of problem can lead to the so-called Sommerfeld effect: steady state frequencies of the motor will usually increase as more power (voltage) is given to it in a step-by-step fashion. When a resonance condition with the structure is reached, the better part of this energy is consumed to generate large amplitude vibrations of the foundation without sensible change of the motor frequency as before. If additional increase steps in voltage are made, one may reach a situation where the rotor will jump to higher rotation regimes, no steady states being stable in between. As a device of passive control of both large amplitude vibrations and the Sommerfeld effect, a scheme is proposed using a point mass free to bounce back and forth inside a circular carving in the suspended mass of the structure. Numerical simulations of the model are also presented Copyright © 2007 by ASME.
Resumo:
A decentralized solution method to the AC power flow problem in power systems with interconnected areas is presented. The proposed methodology allows finding the operation point of a particular area without explicit knowledge of network data of adjacent areas, being only necessary to exchange border information related to the interconnection lines between areas. The methodology is based on the decomposition of the first-order optimality conditions of the AC power flow, which is formulated as a nonlinear programming problem. A 9-bus didactic system, the IEEE Three Area RTS-96 and the IEEE 118 bus test systems are used in order to show the operation and effectiveness of the distributed AC power flow.
Resumo:
A bilevel programming approach for the optimal contract pricing of distributed generation (DG) in distribution networks is presented. The outer optimization problem corresponds to the owner of the DG who must decide the contract price that would maximize his profits. The inner optimization problem corresponds to the distribution company (DisCo), which procures the minimization of the payments incurred in attending the expected demand while satisfying network constraints. The meet the expected demand the DisCo can purchase energy either form the transmission network through the substations or form the DG units within its network. The inner optimization problem is substituted by its Karush- Kuhn-Tucker optimality conditions, turning the bilevel programming problem into an equivalent single-level nonlinear programming problem which is solved using commercially available software. © 2010 IEEE.
Resumo:
This paper adjusts decentralized OPF optimization to the AC power flow problem in power systems with interconnected areas operated by diferent transmission system operators (TSO). The proposed methodology allows finding the operation point of a particular area without explicit knowledge of network data of the other interconnected areas, being only necessary to exchange border information related to the tie-lines between areas. The methodology is based on the decomposition of the first-order optimality conditions of the AC power flow, which is formulated as a nonlinear programming problem. To allow better visualization of the concept of independent operation of each TSO, an artificial neural network have been used for computing border information of the interconnected TSOs. A multi-area Power Flow tool can be seen as a basic building block able to address a large number of problems under a multi-TSO competitive market philosophy. The IEEE RTS-96 power system is used in order to show the operation and effectiveness of the decentralized AC Power Flow. ©2010 IEEE.
Resumo:
In this paper a heuristic technique for solving simultaneous short-term transmission network expansion and reactive power planning problem (TEPRPP) via an AC model is presented. A constructive heuristic algorithm (CHA) aimed to obtaining a significant quality solution for such problem is employed. An interior point method (IPM) is applied to solve TEPRPP as a nonlinear programming (NLP) during the solution steps of the algorithm. For each proposed network topology, an indicator is deployed to identify the weak buses for reactive power sources placement. The objective function of NLP includes the costs of new transmission lines, real power losses as well as reactive power sources. By allocating reactive power sources at load buses, the circuit capacity may increase while the cost of new lines can be decreased. The proposed methodology is tested on Garver's system and the obtained results shows its capability and the viability of using AC model for solving such non-convex optimization problem. © 2011 IEEE.
Resumo:
In this paper we present a mixed integer model that integrates lot sizing and lot scheduling decisions for the production planning of a soft drink company. The main contribution of the paper is to present a model that differ from others in the literature for the constraints related to the scheduling decisions. The proposed strategy is compared to other strategies presented in the literature.
Resumo:
Non-pressure compensating drip hose is widely used for irrigation of vegetables and orchards. One limitation is that the lateral line length must be short to maintain uniformity due to head loss and slope. Any procedure to increase the length is appropriate because it represents low initial cost of the irrigation system. The hypothesis of this research is that it is possible to increase the lateral line length combining two points: using a larger spacing between emitters at the beginning of the lateral line and a smaller one after a certain distance; and allowing a higher pressure variation along the lateral line under an acceptable value of distribution uniformity. To evaluate this hypothesis, a nonlinear programming model (NLP) was developed. The input data are: diameter, roughness coefficient, pressure variation, emitter operational pressure, relationship between emitter discharge and pressure. The output data are: line length, discharge and length of the each section with different spacing between drippers, total discharge in the lateral line, multiple outlet adjustment coefficient, head losses, localized head loss, pressure variation, number of emitters, spacing between emitters, discharge in each emitter, and discharge per linear meter. The mathematical model developed was compared with the lateral line length obtained with the algebraic solution generated by the Darcy-Weisbach equation. The NLP model showed the best results since it generated the greater gain in the lateral line length, maintaining the uniformity and the flow variation under acceptable standards. It had also the lower flow variation, so its adoption is feasible and recommended.
Resumo:
This paper proposes strategies to reduce the number of variables and the combinatorial search space of the multistage transmission expansion planning problem (TEP). The concept of the binary numeral system (BNS) is used to reduce the number of binary and continuous variables related to the candidate transmission lines and network constraints that are connected with them. The construction phase of greedy randomized adaptive search procedure (GRASP-CP) and additional constraints, obtained from power flow equilibrium in an electric power system are employed for more reduction in search space. The multistage TEP problem is modeled like a mixed binary linear programming problem and solved using a commercial solver with a low computational time. The results of one test system and two real systems are presented in order to show the efficiency of the proposed solution technique. © 1969-2012 IEEE.
Resumo:
Perhaps due to its origins in a production scheduling software called Optimised Production Technology (OPT), plus the idea of focusing on system constraints, many believe that the Theory of Constraints (TOC) has a vocation for optimal solutions. Those who assess TOC according to this perspective indicate that it guarantees an optimal solution only in certain circumstances. In opposition to this view and founded on a numeric example of a production mix problem, this paper shows, by means of TOC assumptions, why the TOC should not be compared to methods intended to seek optimal or the best solutions, but rather sufficiently good solutions, possible in non-deterministic environments. Moreover, we extend the range of relevant literature on product mix decision by introducing a heuristic based on the uniquely identified work that aims at achieving feasible solutions according to the TOC point of view. The heuristic proposed is tested on 100 production mix problems and the results are compared with the responses obtained with the use of Integer Linear Programming. The results show that the heuristic gives good results on average, but performance falls sharply in some situations. © 2013 Copyright Taylor and Francis Group, LLC.
Resumo:
Defining product mix is very important for organisations because it determines how productive resources are allocated among various operations. However, it is often defined subjectively. The methods commonly used for this definition are Integer Linear Programming and heuristics based in Theory of Constraints, which use maximum throughput as a performance measure. Although this measure provides maximum throughput to specific problem, it does not consider aspects of time, as days, utilised to make the throughput. Taking this into account, the aim of this paper is to present a throughput per day approach to define product mix, as well as to propose a constructive heuristic to help in this process. The results show that the proposed heuristic obtained satisfactory approximation when compared to the optimum values obtained by enumeration. © 2013 Copyright Taylor and Francis Group, LLC.
Resumo:
In this paper, a hybrid heuristic methodology that employs fuzzy logic for solving the AC transmission network expansion planning (AC-TEP) problem is presented. An enhanced constructive heuristic algorithm aimed at obtaining a significant quality solution for such complicated problems considering contingency is proposed. In order to indicate the severity of the contingency, 2 performance indices, namely the line flow performance index and voltage performance index, are calculated. An interior point method is applied as a nonlinear programming solver to handle such nonconvex optimization problems, while the objective function includes the costs of the new transmission lines as well as the real power losses. The performance of the proposed method is examined by applying it to the well-known Garver system for different cases. The simulation studies and result analysis demonstrate that the proposed method provides a promising way to find an optimal plan. Obtaining the best quality solution shows the capability and the viability of the proposed algorithm in AC-TEP. © Tübi̇tak..
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)