190 resultados para Hydroelectric Exploitation’s


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Elétrica - FEIS

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Pós-graduação em Agronomia - FEIS

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Pós-graduação em Engenharia Mecânica - FEG

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In northwestern Sao Paulo State, it was established, in 1965, the hydroelectric station of Ilha Solteira (CESP) that produced extensive degraded areas, from where it was removed the soil superficial layers. For the re-establishment of the vegetation, in areas like these, it is necessary the addition of chemical inputs and organic material. Associating the presence in the area of macrophytes, to the need of recovery of degraded areas and the availability of seeds from native species of Cerrado, it was intended the development of this work, with the objective of evaluating the addition effects of organic residue and phosphorus on the material of degraded soil and on the initial growth of Dipteryx alata, arboreal species of 'cerrado'. The soil material was collected in area of degraded soil by the construction of Ilha Solteira hydroelectric station. The experiment was conducted in two environmental conditions, greenhouse and plenty of sun. The treatments consisted of four phosphorus doses (0, 100, 200 and 300 mg dm(-3) of P2O5), with or without macrophytes addition, with 16 treatments and 10 repetitions each one. The used macrophytes, collected at Jupia hydroelectric station, in Mato Grosso do Sul state, were dried, sliced, incorporated to the soil material and incubated during 60 days. The seeds of Dipteryx alata, collected around of the area, were sowed in washed sand and after 60 days introduced in the treatments. The plants were appraised monthly for height, stem diameter and leaves chlorophyll. After 210 days, the plants were collected and evaluated for fresh and dry weight of aerial part and radicular system and the soil material was evaluated for fertility and microbial activity by the carbon of liberated CO2. The organic residue, incorporated to the material of soil degraded, positively affects the soil fertility and the soil microbial activity. The applied phosphorus doses influenced the behavior of Ca, SB, H+Al and CTC, when applied in the absence of organic residue, it promoted significant and linear increments for values of potential acidity, and indicated the organic residue importance. The initial growth of the Dipteryx alata was favored by the protected cultivation, for the incorporation of organic residue and for the phosphorus addition to the soil. At the end although the material of degraded soil comes as good perspective for disposal of this residue, studies about the field conditions are necessary.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Companhia Energetica de Sao Paulo - CESP owns six hydroelectric dams in the state of São Paulo. The dams, both in its construction and in operation, cause some environmental impacts, most of them negatives, for example, the flooding in regions before not flooded, deviation of the river’s course, among others, bringing harm to flora and fauna of these environments. As a way to compensating these damages, the CESP has acquired a region that was influenced by Sérgio Motta Hydroelectric Plant Engineer, or Porto Primavera, and turned it into Reserva Particular do Patrimônio Natural Foz do Rio Aguapeí. By law it fits in a Conservation Unit, and thus should be contemplate for a management plan, ie, a multidisciplinary technical document which allows, simply, the practice of actions within and around in a sustainably way. This work aimed at developing a land cover map of the reserve for this plan can be made and executed more efficiently. Initially, the project included field visits and meetings with members of the CESP to be specified classes contained on the map. Later, we ran different types of classifications of multispectral images (TM / Landsat 5)... (Complete abstract click electronic access below)

Relevância:

10.00% 10.00%

Publicador:

Resumo:

With growing electricty demand, the importance of generation through hydropower, a renewable energy source, it’s of great importance. This demand derives from the country’s growth, as well as events that will occur in the coming years. The commission has a crucial role before the entry into operation of hydroelectric plant, sice, ensures a good operation of hydraulic and electrical systems, as well as the safety of the installation. This paper is a case study, commissioning in a PCH in especially the most important tests, such as range operation, índex tes and load rejection. In these trials we can get a Idea of the actual behavior of the unit, as well as future operation maneuvers, and evidence of real efficiency

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Brazil economic growth has to predict the need for implementation of new energy sources to ensure the continuity of the economic growth and improvement of life of the brazilian population. Until this moment, this assistance included the construction of large hydroelectric plants, mainly in the amazon region, where the environmental impact is difficult or, as in the case of the Belo Monte made this impossible so far, the implementation of these projects. In this work is conducted a study that demonstrates an example of application of wind energy, through an assessment of wind resources in the brazilian Northeast for the implementation of a wind farm