195 resultados para Gerenciamento integrado
Resumo:
Laboratory of Chemical Waste Management programs are being implemented in various universities of the country and the world, in recognition of the urgent need to change the reality of disregard for the environment, together with objective responsibility of the generator, and especially the awareness of sustainability. Analysis and research laboratories involve a range of waste in developing their studies with intrinsic characteristics related to their form of generation. The amount of waste generated in this segment is negligible compared to industrial activities, but the environmental issue is that these residues do not have a standard technique for treatment due to the potential variation of its composition. This research project, aiming their suitability and continuous improvement, aims to diagnose and analyze the current situation of the management and disposal of chemical waste generated by the laboratories IGCE UNESP, Campus Rio Claro / SP. Universities, through their research, teaching and extension, end up generating potentially hazardous chemicals that may contaminate the environment when they are disposed of improperly, with no concern for the environment and / or public health. Aiming to assist in improvements with respect to this issue, the purpose of this study is to understand the management and disposal of chemical waste from the IGCE, laboratories UNESP - Rio Claro / SP, in order to discuss the situation of such waste, and present proposals to reduce generation of the same and minimizing the environmental impact, thereby increasing the local hygiene through proper disposal. The research instrument used interviews, questionnaires, review of recent literature and observations were made in order to develop proposals for the management and disposal of waste. These proposals based on prevention and corrective control, where the preventive approach aims at lifting techniques and actions to reduce the generating sources and...
Resumo:
Health Care Waste (HCW) represents 1%, and it has presently gained a lot of importance. Adequate management is one of the great challenges to be faced by health care centers. It has gained distinction and been widely discussed by members of the sectors involved with sanitation, public health and environmental issues due to waste physical, chemical biological characteristics, which pose potential risk to the environment and public health. The present study aims at evaluating HCW internal management by following all its phases, determining indicators, classifying and quantifying, establishing production rates (kg /patient/day) for the sector and designing materials to disseminate appropriate HCW disposal in the Emergency Room of the UNESP University Hospital in the city of Botucatu according to the guidelines presently in force. : From June to October 2011, the waste flow was observed from its production to final disposal. Four weight measurements were performed on four consecutive days in the month of August by using a properly calibrated (in grams) digital scale at the times scheduled for collection of the produced waste. Hence, the daily and monthly amounts were estimated according to their classification. All the waste packaged in the bags in garbage cans in the Emergency Room for a 24-hour period was considered to be a sample. Separation was not adequately performed in that sector, and waste from Group A was mixed with that from Group D. The amount of infectious waste produced in the sector corresponded to 87.80 %, common waste to 10.93 % and recyclable waste to 1.27%. The mean daily HCW production was of 123.300 kg/day, and the total monthly production was of 3,822 kg/month, which was distributed as follows: Group A 3,355,750 kg/month; Group D 417,570 kg/month and recyclables 48,670 kg/month. The production rate corresponded to 0.47 kg/patient/day, thus showing... (Complete abstract click electronic access below)
Resumo:
There are many approaches and techniques about Administration and Management of Projects in order to provide greater agility, efficiency and transparency during the development process of new products. Simultaneously, a pursuit for a management approach more flexible in its planning and strategic changes during the development campaign, such as, comprehend the project's unpredictability level and deal it by monitoring and estimates tools. These features tend to accentuate itself in manufacturers of complex products, as aircraft and other aerospace technologies. By these conditions thus research aims to describe a case when the Agile Management Processing of Project Development Scrum was used in the Test area of an aircraft manufacturer. Focused on the Scrum implementation over the area, its adaptation, evolution and achievements the research proposes to analyze the improvements, indicate the obstacles and discuss solutions, contributing then to the theoretical basis of the considered theme and futures updates applicable to the area. The research is classified as qualitative; furthermore the information and data analyzed were obtained by interviews with professionals and observations of the processes from the major aircraft manufacturer
Resumo:
Collaborative Systems are designed to support individuals in order to solve a problem together, or cooperatively (or collaboratively). Such systems have the advantage of not requiring the presence in the same location of the participants. The basis of any Collaborative System is communication, where users interact with each other in order to exchange information. Communication among individuals is accomplished through collaborative tools such as chat, email, document repository, etc.. Using these tools, companies can reduce operational costs, saving on travel and accommodation of its employees to attend meetings. The project members only need a computer with internet access to use collaborative tools. Project management is essential to the quality of the nal product. To perform a proper management, methodologies must be applied using methods, tools and procedures. There are some phases that are considered generic for all software process models, they are: de nition, development, maintenance and activity to support the software process. In this paper is described a platform for project management using the concepts and features of Collaborative Systems. The goal of this platform is to unify various collaborative tools (such as chat and document repository) in a project management system. Using the system, it becomes possible to manage projects, and the ability to maintain an active constant communication between members of each project
Resumo:
This paper aims to discuss the system of inventory management in a public university. The present paper shows the definitions, classification of materials and the advantages and disadvantages of storage, besides exposing the public procurement bidding system since the acquisition until receipt of materials to be stored. This paper presents a survey of the items stored in the warehouse and use of control tools such as ABC curve to demand flow prized for verification of critical items and idle items. Displays also a calculation for the minimum value of stock and replacement of an item in inventory and an analysis of the conditions of the warehouse layout. As a result, knowledge is acquired and a revised system of inventory management of the institution was proposed
Resumo:
This action-research work presents tools which are related to production monitoring: Follow-up of Products Release from Quality Department and Follow-up of Production Volumes. Both tools allows controlling release delays of finished goods based on the quality specifications, and the accurate analysis of production volumes variations compared to pre-established plans. They have direct impact into enterprises inventory levels that are part of Toiletries, Perfumery and Cosmetics market segment. By applying these tools, it´s possible to identify opportunities for process optimization that brings benefits for the final customer. The results seen by the tools application are presented by the analysis of delayed stock for release quantities evolution and testimonies from professionals of Supply Chain
Resumo:
The current problematic of the construction and demolition (C&D) waste faced for the Brazilian cities, is one of the main degradation factors of the environment, over all about the promise of the urban ambient quality. This scenery must mainly to the unsustainable management adopted by the great majority of the Brazilian cities. Therefore, this work aims at to offer subsidies for medium cities, having as study object the city of Rio Claro-SP, (Brazil), in the elaboration of plans and integrated programs of sustainable management of the construction and demolition waste, in accordance with CONAMA Resolution nº 307/2002, that’s set up a sustainable management system of C&D waste. In this direction, the diagnosis of the management was elaborated for the city of Rio Claro, (generation, collects, transport and disposal) and the public administration of the construction and demolition waste, as well as of the study of the related aspects with C&D waste recycling plant. Later, was suggested a plan of improvements for the public manager of C&D waste: areas of temporary disposal to facility the appropriating destination, appropriated areas of final disposal, incentives to the recycling of C&D waste, new legislations, education and orientation programs and adequacy the agents of C&D waste management (generating, transporting, addressee and public manager), directing for an environmental, economic and social sustainability.
Resumo:
Objectives: conduct a systematic review of national and international literature, to classify the types of production, comparing the two literatures and synthesize knowledge in the area. Method: Systematic Review of Literature, in the databases LILACS, CINAHL and MEDLINE for selection of articles in their entirety, the data extracted from the articles selected were: the study of bibliographic information (title, author, journal, place of study and year of publication), and general information (multidisciplinary production or specific area, language, type of study, type of population and contributions of the study). The categories established for classification of publications were: raising the cost of procedures/ interventions, economic evaluation of specific intervention, inclusion of nursing in the economic context, using cost as an important variable in the study. Results: The study included 39 publications, with 31% of national production and the remaining 69%, internationally. Most publications were classified according to category of economic evaluation of specific intervention, followed by the category of raising the cost of procedure / intervention, which fits the majority of national production. Human resources is shaped as an important variable for obtaining cost studies that proposed to make this calculation. Conclusion: The production of literature in nursing cost management is relevant in number of publications within the proposed period and is directed to different areas within this theme. There are significant differences in national and international literature: these last use more accurate methods, have more content theorized, use more the economic evaluation tools and related more costs with a amplified context. The production of such knowledge should continue as far as possible and putting that knowledge relating the current reality, in order to amplify the field of nursing and add value
Resumo:
The civil construction is an industrial sector of great economic importance and that it comes exponentially growing in the country. However, this activity is deficient in its management processes, and in this context that the management of construction as a way of organizing and controlling all the technical and construction of an enterprise. The literature shows that the manager has a key role throughout the process of planning, execution and analysis of the results of the work being of prime importance that all steps have its due attention in order to avoid any technical problems or lack information. The management’s main objective is the transparency of technical and financial information to investors and their assessments of physical and financial performances of the work intervened positively in quality, deadlines and costs. In this sense, this paper aims to present consideration about the proper management of a residential development in vertical construction
Resumo:
Pós-graduação em Ciência da Computação - IBILCE
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
Introdução: O adequado gerenciamento dos resíduos sólidos domiciliares (RSD) tem se estabelecido nas últimas décadas como um importante instrumento na diminuição do lixo doméstico destinados aos aterros. A compostagem doméstica e a produção de sabão a partir de óleo usado são alternativas para a reciclagem dos RSD que, ao contrário dos lixos recicláveis, não são explorados comercialmente. Assim, o ensino dessas técnicas para a comunidade pode ser uma ferramenta útil na educação ambiental, disseminando práticas que evitam a destinação final de resíduos sólidos em aterros e desenvolvendo valores para a sustentabilidade. Objetivos: Ensinar formas de reciclagem dos RSD através de técnicas de compostagem e produção de sabão a partir de óleo usado, servindo também como instrumento para promover a educação ambiental, e conscientizar a comunidade sobre a importância de um adequado gerenciamento de resíduos. Métodos: As atividades de ensino consistiram em duas partes, unindo teoria e prática, por meio da apresentação de painéis explicativos sobre compostagem, produção de sabão, e sobre as vantagens decorrentes desses processos seguida da realização das técnicas apresentadas, com a produção de sabão em barra e líquido com óleo usado, e pela montagem de pequenas composteiras em garrafões PET de 5 litros de água mineral reaproveitados. Resultados: As atividades foram realizadas em eventos abertos a sociedade de São José do Rio Preto, tais como a Semana da Tecnologia, em outubro de 2010 e a Semana do Meio Ambiente, em junho de 2011, ambas desenvolvidas no SESC (Serviço Social do Comércio) da cidade. O público foi variado, incluindo desde aposentados e donas de casa até estudantes e profissionais de diversos setores. O interesse em anotar as metodologias explicadas culminou na idéia de produzir um material impresso que contivesse as receitas de sabão (líquido e em barra), os procedimentos e dicas de como realizar a compostagem. A convite de uma escola pública, houve também a apresentação das atividades para pais de alunos e funcionários interessados em aprender as práticas para o adequado gerenciamento dos RSD, levando à discussão das possibilidades de implantação de um projeto de compostagem na própria escola.
Resumo:
Neste trabalho, propomos um modelo integrado de dimensionamento de lotes e programação da produção monomáquina para uma fábrica de refrigerantes de pequeno porte. As decisões de dimensionamento foram baseadas em um modelo encontrado na literatura e as decisões de sequenciamento foram modeladas utilizando restrições do problema do caixeiro viajante assimétrico. Para a validação do modelo proposto foram feitos testes computacionais com exemplares gerados aleatoriamente, e também exemplares baseados em dados reais obtidos da literatura. Os exemplares foram resolvidos pelo método Branch-and-Cut incluído no pacote computacional CPLEX 10.0. Os resultados mostram que o modelo proposto representa o planejamento da produção em fábricas de bebidas monomáquinas e que, em algumas situações, produz resultados melhores que o modelo da literatura.
Resumo:
O presente trabalho apresenta em sua essência informações sobre o processo de unificação das Bolsas de Valores do Chile (BVS), Peru (BVL) e Colômbia (BVC) - que deu origem ao Mercado Integrado Latino-Americano (MILA) - com o objetivo de compreender o funcionamento desse sistema inovador, e possibilitar o acompanhamento dos efeitos futuros que dele ocorram
Resumo:
This paper presents a study of practices in project management of a college team that participates in Baja SAE competitions. The use of management techniques can deliver benefits to the project in terms of meeting customer needs, use of time and resources and minimization of risks, for example. Should be sought methods and techniques in agreement with the project context and the team that leads it. This paper analyzes a specific case of baja vehicle project management, obtaining data by means of literature research, archival research and interviews with students on the team (structured and unstructured). The study allowed to relate the practices used by the team and to identify possible areas for improvement, based on the literature on project management. There was thus obtained a set of recommendations for the current team, in future initiatives, and to other teams responsible for carrying out similar projects