20 resultados para lean implementation time
Resumo:
This work evaluates the implementation of Lean Six Sigma into the Steam Turbine’s Blades Manufacturing Process, aiming to improve productivity, quality and operational efficiency. Therefore, several tools have been applied, such as VSM, Spaghetti Diagram, Ishikawa, Pareto, DMAIC, Benchmarking and Control Charts, seeking to propose process improvements, as well as Quality Indicators creation. It was obtained a significant waste reduction throughout the process, achieving a lead time reduction of 42% and 83,41% in transport. Also, were introduced the Lean Thinking concepts, such as pull production and Continuous material flow. At the same time, it was possible to calculate the process capability and the sigma level, evaluating and proposing some improvements
Resumo:
The objective of this study is to analyze the adoption of lean thinking practices at Brazilian auto part companies. For such, a survey was conducted at 75 sector companies. The results reveal that among all practices, the “systematic search for continuous improvement" obtained the highest implementation average. In terms of correlation, interdependence was observed among all Lean Manufacturing variables, most especially between LM5 (Kanban) and LM6 (Just-in-Time). This correlation can be explained by the importance of Kanban systems when implementing Just-inTime.
Resumo:
Condition monitoring is used to increase machinery availability and machinery performance, reducing consequential damage, increasing machine life, reducing spare parts inventories, and reducing breakdown maintenance. An efficient real time vibration measurement and analysis instruments is capable of providing warning and predicting faults at early stages. In this paper, a new methodology for the implementation of vibration measurement and analysis instruments in real time based on circuit architecture mapped from a MATLAB/Simulink model is presented. In this study, signal processing applications such as FIR filters and fast Fourier transform are treated as systems, which are implemented in hardware using a system generator toolbox, which translates a Simulink model in a hardware description language - HDL for FPGA implementations.
Resumo:
This work aims to demonstrate an application of telemetry for monitoring process variables. The authors developed the prototype of a dedicated device capable of multiplexing, encoding and transmitting real-time data signals via amplitude-shift keying modulation to remotely located device(s). The prototype development is described in details, enabling the reproduction of the proposed telemetry system for a three-phase motor as well as for other devices. Furthermore, the proposed device has an easy implementation by using of accessible components and low cost, also presenting a tutorial and educational purpose. © 2011 IEEE.
Resumo:
This paper presents a control method for a class of continuous-time switched systems, using state feedback variable structure controllers. The method is applied to the control of a two-cell dc-dc buck converter and a control circuit design using the software PSpice is proposed. The design is based on Lyapunov-Metzler-SPR systems and the performance of the resulting control system is superior to that afforded by a recently-proposed alternative sliding-mode control technique. The dc-dc power converters are very used in industrial applications, for instance, in power systems of hybrid electric vehicles and aircrafts. Good results were obtained and the proposed design is also inexpensive because it uses electric components that can be easily found for the hardware implementation. Future researches on the subject include the hardware validation of the dc-dc converter controller and the robust control design of switched systems, with structural failures. © 2011 IEEE.
Resumo:
This paper presents a control method for a class of continuous-time switched systems, using state feedback variable structure controllers. The method is applied to the control of a non-trivial dc-dc power converter and a simple and inexpensive control circuit design, that was simulated using the software PSpice, is proposed. The design is based on Lyapunov-Metzler-SPR systems and the performance of the resulting control system is superior to that afforded by a recently proposed alternative sliding-mode control technique. © 2011 IFAC.
Resumo:
The real-time monitoring of events in an industrial plant is vital, to monitor the actual conditions of operation of the machinery responsible for the manufacturing process. A predictive maintenance program includes condition monitoring of the rotating machinery, to anticipate possible conditions of failure. To increase the operational reliability it is thus necessary an efficient tool to analyze and monitor the equipments, in real-time, and enabling the detection of e.g. incipient faults in bearings. To fulfill these requirements some innovations have become frequent, namely the inclusion of vibration sensors or stator current sensors. These innovations enable the development of new design methodologies that take into account the ease of future modifications, upgrades, and replacement of the monitored machine, as well as expansion of the monitoring system. This paper presents the development, implementation and testing of an instrument for vibration monitoring, as a possible solution to embed in industrial environment. The digital control system is based on an FPGA, and its configuration with an open hardware design tool is described. Special focus is given to the area of fault detection in rolling bearings. © 2012 IEEE.
Resumo:
The growing demand for electrical power and the limited capital invested to provide this power is forcing countries like Brazil to search for new alternatives for electrical power generation. The purpose of this paper is to present a technical and economic study on a 15 kW solar plant installed in an isolated community, highlighting the importance of the need for financial subsidy from the government. It evaluates the importance of parameters such as the annual interest rate, specific investment, the marginal cost of expanding the electrical power supply and the government subsidy on amortization time of capital invested. © 2012 Elsevier Ltd All rights reserved.
Resumo:
Structural damage identification is basically a nonlinear phenomenon; however, nonlinear procedures are not used currently in practical applications due to the complexity and difficulty for implementation of such techniques. Therefore, the development of techniques that consider the nonlinear behavior of structures for damage detection is a research of major importance since nonlinear dynamical effects can be erroneously treated as damage in the structure by classical metrics. This paper proposes the discrete-time Volterra series for modeling the nonlinear convolution between the input and output signals in a benchmark nonlinear system. The prediction error of the model in an unknown structural condition is compared with the values of the reference structure in healthy condition for evaluating the method of damage detection. Since the Volterra series separate the response of the system in linear and nonlinear contributions, these indexes are used to show the importance of considering the nonlinear behavior of the structure. The paper concludes pointing out the main advantages and drawbacks of this damage detection methodology. © (2013) Trans Tech Publications.
Resumo:
There is a growing search for continuous improvement within the companies which creates an obligation of reducing and when it is possible eliminating waste. Production Planning and Control Department (PCP) is not out of this question, making necessary the application of methods and creation of tools that eliminate steps which do not add value to the planning process. This paper aims to develop a tool which concentrates in just one place all the necessary information to make the packaging material requirement planning (MRP) in a agribusiness company. Besides, it also aims, in a more visual way and using devices that prevent mistakes (Poka-Yoke), to reduce the number of reviews and mistakes made by analysts. As a result, an Excel spreadsheet was developed. This spreadsheet shows what happens with the status of planning and receiving of packaging, giving some advices when some critical situation happens. The use of Lean Manufacturing Method and the action research method helped to well define the problem and to reduce the number of steps, spreadsheets and time of process in 80%, 60% and 75%, respectively
Resumo:
This study aims to assess the implementation of Lean Six Sigma in the preparation of plates and hot lamination process for a company of aluminum rolled products, to improve the quality, productivity and process efficiency. As a basis for achieving these goals, the DMAIC methodology and various quality tools such as Cause Effect Diagram, Process Flow, SIPOC, Pareto, FMEA and Control Chart were used, trying to propose improvements to processes and increase their efficiency. The results were significant and were the basis for the continuation of a continuous improvement project throughout the factory
Resumo:
With the advent of a global economy, Lean Six Sigma meets the demand of new production process that creates products within the customer’s specification without any wastage. The objectives of this work is to use the concepts Lean Manufacturing and Six Sigma parallel to minimize costs, increase the customer base, reduce the delivery time which implies an increase in the turnover of products on the shelves in a packaging company. We used the DMAIC method to continue working. The method DMAIC indicated the main failure modes that were fixed in the step improve. At this stage the tools of Lean Manufacturing gain tremendous value by optimizing processes with defects. The conclusion involves an increase in monthly billing, a corporate restructuring and, finally, a renewal in how to conduct the work of management
Resumo:
The constant search for improvement and survival of the companies makes essential the utilization of cost reduction strategies and resources optimization. This study had as its objective the utilization of Lean Manufacturing tools for the repair process lead time reduction, in a car audio manufacturer. Performing an action research, the major problems were studied, such as the potential causes and the possible improvement activities, using the DMAIC methodology. An action plan was developed for all involved processes and, as a result, the objective was reached by making a direct impact on the customers’ satisfaction and adding a competitive differential for the company
Resumo:
Due to globalization, is increasingly common for companies to make their products more competitive. With this background, the industries seek more efficient ways to produce. This paper aims to examine the tools of Lean Manufacturing applied in an industry luminaries ,addressing the positive aspects. Were applied tools like value stream mapping, Kanban, setup reduction and 5S program. With the application of these tools obtained improvements in processes, reducing lead time from factory and reducing the cost of the luminaries
Resumo:
The cosmetic industry has presenting growth in Brazil and one way to support this demand is improving production and reducing waste. Wastes can be related to setup time, which is spent to support demand of product´s mix and volume. One of the methodologies used to reduce setup time is SMED (Single Minute Exchange of Die). This paper aims to describe and analyze the setup process in a production line in a cosmetic industrial branch, before and after the application of SMED methodology, highlighting good practices and difficulties in order to help other companies develop fast setup. The research method used was the case study. From the analysis of the implementation of the methodology on the company which is object from the case study was possible to summarize good practices, such as: the use of pillar E&T to store information about the training on the SMED methodology; creation of a multifunctional teamwork and involving different areas; creation of a “From-To” matrix. Difficulties were identified, such as: high and constant turnover of people who work on the shop floor; lack of discipline in filling the forms and by doing the setup activities that were standardized; lack of financial resources; lack of people´s availability in orer to conduct necessary meetings and trainings. Recommendations for other companies have also been proposed, such as: training of the team involved, before starting the project and a refresher training; standardization of training, forms and documentation of all steps of the project; create a multifunctional team; training after an employee, who is responsible for the setup, leaves the company