39 resultados para Geotechnical charts


Relevância:

60.00% 60.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The general assumption under which the (X) over bar chart is designed is that the process mean has a constant in-control value. However, there are situations in which the process mean wanders. When it wanders according to a first-order autoregressive (AR (1)) model, a complex approach involving Markov chains and integral equation methods is used to evaluate the properties of the (X) over bar chart. In this paper, we propose the use of a pure Markov chain approach to study the performance of the (X) over bar chart. The performance of the chat (X) over bar with variable parameters and the (X) over bar with double sampling are compared. (C) 2011 Elsevier B.V. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this article, we propose new control charts for monitoring the mean vector and the covariance matrix of bivariate processes. The traditional tools used for this purpose are the T (2) and the |S| charts. However, these charts have two drawbacks: (1) the T (2) and the |S| statistics are not easy to compute, and (2) after a signal, they do not distinguish the variable affected by the assignable cause. As an alternative to (1), we propose the MVMAX chart, which only requires the computation of sample means and sample variances. As an alternative to (2), we propose the joint use of two charts based on the non-central chi-square statistic (NCS statistic), named as the NCS charts. Once the NCS charts signal, the user can immediately identify the out-of-control variable. In general, the synthetic MVMAX chart is faster than the NCS charts and the joint T (2) and |S| charts in signaling processes disturbances.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this article, we consider the T(2) chart with double sampling to control bivariate processes (BDS chart). During the first stage of the sampling, n(1) items of the sample are inspected and two quality characteristics (x; y) are measured. If the Hotelling statistic T(1)(2) for the mean vector of (x; y) is less than w, the sampling is interrupted. If the Hotelling statistic T(1)(2) is greater than CL(1), where CL(1) > w, the control chart signals an out-of-control condition. If w < T(1)(2) <= CL(1), the sampling goes on to the second stage, where the remaining n(2) items of the sample are inspected and T(2)(2) for the mean vector of the whole sample is computed. During the second stage of the sampling, the control chart signals an out-of-control condition when the statistic T(2)(2) is larger than CL(2). A comparative study shows that the BDS chart detects process disturbances faster than the standard bivariate T(2) chart and the adaptive bivariate T(2) charts with variable sample size and/or variable sampling interval.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We propose a new statistic to control the covariance matrix of bivariate processes. This new statistic is based on the sample variances of the two quality characteristics, in short VMAX statistic. The points plotted on the chart correspond to the maximum of the values of these two variances. The reasons to consider the VMAX statistic instead of the generalized variance vertical bar S vertical bar is its faster detection of process changes and its better diagnostic feature; that is, with the VMAX statistic it is easier to identify the out-of-control variable. We study the double sampling (DS) and the exponentially weighted moving average (EWMA) charts based on the VMAX statistic. (C) 2008 Elsevier B.V. All rights reserved.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper, three single-control charts are proposed to monitor individual observations of a bivariate Poisson process. The specified false-alarm risk, their control limits, and ARLs were determined to compare their performances for different types and sizes of shifts. In most of the cases, the single charts presented better performance rather than two separate control charts ( one for each quality characteristic). A numerical example illustrates the proposed control charts.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Recent studies have shown that the (X) over bar chart with variable sampling intervals (VSI) and/or with variable sample sizes (VSS) detects process shifts faster than the traditional (X) over bar chart. This article extends these studies for processes that are monitored by both the (X) over bar and R charts. A Markov chain model is used to determine the properties of the joint (X) over bar and R charts with variable sample sizes and sampling intervals (VSSI). The VSSI scheme improves the joint (X) over bar and R control chart performance in terms of the speed with which shifts in the process mean and/or variance are detected.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Varying the parameters of the (X) over bar chart has been explored extensively in recent years. In this paper, we extend the study of the (X) over bar chart with variable parameters to include variable action limits. The action limits establish whether the control should be relaxed or not. When the (X) over bar falls near the target, the control is relaxed so that there will be more time before the next sample and/or the next sample will be smaller than usual. When the (X) over bar falls far from the target but not in the action region, the control is tightened so that there is less time before the next sample and/or the next sample will be larger than usual. The goal is to draw the action limits wider than usual when the control is relaxed and narrower than usual when the control is tightened. This new feature then makes the (X) over bar chart more powerful than the CUSUM scheme in detecting shifts in the process mean.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A standard X chart for controlling a process takes regular individual observations, for instance every half hour. This article proposes a modification of the X chart that allows one to take supplementary samples. The supplementary sample is taken (and the (X) over bar and R values computed) when the current value of X falls outside the control limits. With the supplementary sample, the signal of out-of-control is given by an (X) over bar value outside the (X) over bar chart's control limits or an R value outside the R chart's control limit. The proposed chart is designed to hold the supplementary sample frequency, during the in-control period, as low as 5% or less. In this context, the practitioner might prefer to verify an out-of-control condition by simply comparing the (X) over bar and R values with the control limits. In other words, without plotting the (X) over bar and R points. The X chart with supplementary samples has two major advantages when compared with the standard (X) over bar and A charts: (a) the user will be plotting X values instead of (X) over bar and R values; (b) the shifts in the process mean and/or changes in the process variance are detected faster.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper deals with the joint economic design of (x) over bar and R charts when the occurrence times of assignable causes follow Weibull distributions with increasing failure rates. The variable quality characteristic is assumed to be normally distributed and the process is subject to two independent assignable causes (such as tool wear-out, overheating, or vibration). One cause changes the process mean and the other changes the process variance. However, the occurrence of one kind of assignable cause does not preclude the occurrence of the other. A cost model is developed and a non-uniform sampling interval scheme is adopted. A two-step search procedure is employed to determine the optimum design parameters. Finally, a sensitivity analysis of the model is conducted, and the cost savings associated with the use of non-uniform sampling intervals instead of constant sampling intervals are evaluated.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

When joint (X) over bar and R charts are in use, samples of fixed size are regularly taken from the process, and their means and ranges are plotted on the (X) over bar and R charts, respectively. In this article, joint (X) over bar and R charts have been used for monitoring continuous production processes. The sampling is performed, in two stages. During the first stage, one item of the sample is inspected and, depending on the result, the sampling is interrupted if the process is found to be in control; otherwise, it goes on to the second stage, where the remaining sample items are inspected. The two-stage sampling procedure speeds up the detection of process disturbances. The proposed joint (X) over bar and R charts are easier to administer and are more efficient than the joint (X) over bar and R charts with variable sample size where the quality characteristic of interest can be evaluated either by attribute or variable. Copyright (C) 2004 John Wiley Sons, Ltd.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

When the (X) over bar chart is in use, samples are regularly taken from the process, and their means are plotted on the chart. In some cases, it is too expensive to obtain the X values, but not the values of a correlated variable Y. This paper presents a model for the economic design of a two-stage control chart, that is. a control chart based on both performance (X) and surrogate (Y) variables. The process is monitored by the surrogate variable until it signals an out-of-control behavior, and then a switch is made to the (X) over bar chart. The (X) over bar chart is built with central, warning. and action regions. If an X sample mean falls in the central region, the process surveillance returns to the (Y) over bar chart. Otherwise. The process remains under the (X) over bar chart's surveillance until an (X) over bar sample mean falls outside the control limits. The search for an assignable cause is undertaken when the performance variable signals an out-of-control behavior. In this way, the two variables, are used in an alternating fashion. The assumption of an exponential distribution to describe the length of time the process remains in control allows the application of the Markov chain approach for developing the cost function. A study is performed to examine the economic advantages of using performance and surrogate variables. (C) 2003 Elsevier B.V. All rights reserved.