144 resultados para Empreendimentos imobiliários


Relevância:

60.00% 60.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Pós-graduação em Geografia - IGCE

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Currently the Brazilian construction market is growing like gangbusters and every day grows its competition. With this Brazilian scenario, the government is supporting the construction companies and offering resources for real estate projects. To acquire resources Caixa Econômica Federal requirements you must meet in planning the work, as the development of budgets, timelines and memorials. This study aimed to planning a work according to the requirements of Caixa Econômica Federal, which was done with the aid of two softwares . First the methods and tools that are used to perform a planning were discussed. Then, based on the theory and observing the requirements of the financing bank budgets, memorials and schedules with the help of software were performed. At the end of the project, it was possible to observe the importance of using theoretical methods and software to facilitate and improve the timelines and budgets made , and thus the planning itself, which every day becomes more common in construction companies, because with the increase of competition and market requirements, is critical to reducing the loss and time, thus maintaining customer satisfaction and company

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Pós-graduação em Ciências Sociais - FFC

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The implantation of environmental management systens (SGA) in companies is the first step to the company conquers the environmental certification and consequently the benefits of a sustainable production of products, services and activities can bring. However, in the way as they are proposals in bibliographies the implantation of the SGAs, does not identify the definition of the operational stages of implementation of the same ones, generating doubts on the real environmental and administrative performance that they can come to generate for the organization. In this direction, the present research brings a proposal of operational systematics for implantation of SGA in companies, detailing each stage of implantation, considering its particularitities. For in such a way, a revision of norm NBR ISO 14001:2004 was made, looking for to identify to the interpretation imperfections gifts in the normative system. Moreover, other methods of SGA implantation had been searched gifts in the bibliography, searching proposals that detailed the operational aspects of the implantation of the system. In the same way, the accomplishment of a period of training supervised in the first semester of 2007 made possible the practical experience of the functioning of a system of environmental management, beyond the contact with professionals of the area and the acquisition of documents that had helped in the development of the research. The result was the attainment of a detailed procedure more, defining the operational systematic of SGA implantation, beyond the generation of a flowchart, describing as to develop each stage. This detailing certainly will facilitate the implantation of a SGA in companies interested in improving its environmental performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Given the large potential impact that the construction industry has on the environment and the need to reduce environmental degradation , environmental certifications are important tools of environmental management. This work deals with the environmental certifications of sustainable buildings LEED and AQUA . This project employed the method of exploratory research to identify the requirements that impose the greatest difficulties in the implementation of LEED and AQUA , surveying the reasons for the choice of certification to be deployed and to analyzing the main benefits perceived by certified organizations. Concepts related to the topic were obtained from the literature, leading to the development of a questionnaire that was applied in organizations that have gone through the above certifications . From the analysis of questionnaires, it was possible to highlight that the main reasons for the adoption of an environmental certificate in the construction industry are linked to economic issues such as greater market recognition and appreciation of the project and what is still needed to invest in environmental awareness industry and the whole society

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Given the intense expansion of the industries in Brazil and the discovery of hydrocarbons in the pre-salt layer of the Santos and Campos Basin, there is a need to expand the distribution of oil and gas network in the country. The present work aims to present the development of susceptibility map by two distinct methods of two events (debris flows and full wave), applied to the establishment of pipelines on Ribeirão da Prata Basin. The research area covers two municipalities: São João da Boa Vista and Águas da Prata, in total 145 km2. In the paper was used the methodology proposed by Zaine (2011) for the physiographic subdivision method, which uses geological maps, geomorphological maps, digital terrain models and aerial photographs, used to extract the main elements of the physical environment, as rivers, lines, ridges, tops forms and valley forms and historical processes. Thus, the basin was divided into 11 physiographic zones, considering the following elements: thickness of soil, rock type, geomorphology, amplitude, ridges orientation, erosion occurences and mass movements. Were subsequently performed location maps of dams, that had as main purpose to localize major dams in the study area along with their area and perimeter of the reservoir, and land use map that subdivided the area in woody vegetation, permanent culture, temporary culture and urban area. Along with the preparation of the auxiliar maps was conducted a field campaign with three days and approximately 2 points per km2, which aimed to better understand the physical environment and check the main peculiarities of the study area. Criteria have been established for susceptibility maps physiographic subdivision and land use, and a survey of criteria weights used in each map for both processes under study. For the preparation of susceptibility maps were adopted two different methods, which treat the weighted average and the multiplicand. The weighted average method it is...