4 resultados para security risk analysis

em Universidade Federal do Rio Grande do Norte(UFRN)


Relevância:

80.00% 80.00%

Publicador:

Resumo:

A proposal for a global analysis of sustainability in projects related in oil facilities is presented. By considering economic, environmental and social aspects in the early stages of design, the suggested method is more comprehensive and can be used to complement the analysis commonly applied in the petroleum industry, such as: Study of Technical and Economic Feasibility; Environmental Impact Assessment and Risk Analysis. Several authors, associations, certification bodies and oil companies suggest different approaches to study sustainability in some specific activities (or industries). In this study, a checklist of significant sustainability aspects for the oil industry (surface facilities) was assembled. In addition, a matrix was developed to assess the sustainability items relevant to these projects. In this work, the checklist interacts with the matrix to perform a "Preliminary Analysis of Sustainability of the Enterprise" (APSE). This method allows the identification of aspects that contribute significantly to global sustainability. From this analysis, which includes economic, social and environmental aspects, is built a report that is used to analyze qualitatively and quantitatively the impact of the sustainability aspects of the project. In this analysis are identified items that strongly influence the economic, social or environmental aspects and evaluated alternatives that can increase the overall sustainability of the project. Finally, the alternatives that can be used to indicate the most sustainable option are identified. This method was applied in a project (design) of a small offshore platform. This case study shows how the APSE can contribute to the identification of sustainability initiatives for the enterprise. The results showed that relevant aspects can contribute decisively to global sustainability. Finally, it was observed that the proposed method can contribute to increased rates of sustainability, even after application of analysis commonly used in these projects

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Activities that have fuel subterranean storage system are considered potentially polluting fuels by CONAMA Resolution 273, due to the possibility of leak, outpouring and overflow of fuel into the ground. Being even more worrying when contaminate groundwater for public supply, as the case of Natal City. For this reason, the Public Ministry/RN, in partnership with UFRN, developed the project environmental suitability of Gas stations in Natal, of which 36% showed evidence of contamination. This paper describes the four stages of the management of contaminated areas: preliminary assessment of environmental liabilities, detailed confirmatory investigation of the contamination, risk analysis to human health (RBCA), as well as the remediation plan of degraded areas. Therefore it is presented a case study. For the area investigated has been proposed a mathematical method to estimate the volume of LNAPL by a free CAD software (ScketchUp) and compare it with the partition method for grid area. Were also performed 3D graphics designs of feathers contamination. Research results showed that passive benzene contamination in groundwater was 2791.77 μg/L, when the maximum allowed by CONAMA Resolution 420 is 5 μg/L which is the potability standards. The individual and cumulative risks were calculated from 4.4 x10-3, both above the limits of 1.0 x10-5 or by RBCA 1.0 x10-6 by the Public Ministry/RN. Corrective action points that remediation of dissolved phase benzene is expected to reach a concentration of 25 μg/L, based on carcinogenic risk for ingestion of groundwater by residents residential, diverging legislation. According to the proposed model, the volume of LNAPL using the ScketchUp was 17.59 m3, while by the grid partitioning method was 14.02 m3. Because of the low recovery, the expected removal of LNAPL is 11 years, if the multiphase extraction system installed in the enterprise is not optimized

Relevância:

80.00% 80.00%

Publicador:

Resumo:

A proposal for a global analysis of sustainability in projects related in oil facilities is presented. By considering economic, environmental and social aspects in the early stages of design, the suggested method is more comprehensive and can be used to complement the analysis commonly applied in the petroleum industry, such as: Study of Technical and Economic Feasibility; Environmental Impact Assessment and Risk Analysis. Several authors, associations, certification bodies and oil companies suggest different approaches to study sustainability in some specific activities (or industries). In this study, a checklist of significant sustainability aspects for the oil industry (surface facilities) was assembled. In addition, a matrix was developed to assess the sustainability items relevant to these projects. In this work, the checklist interacts with the matrix to perform a "Preliminary Analysis of Sustainability of the Enterprise" (APSE). This method allows the identification of aspects that contribute significantly to global sustainability. From this analysis, which includes economic, social and environmental aspects, is built a report that is used to analyze qualitatively and quantitatively the impact of the sustainability aspects of the project. In this analysis are identified items that strongly influence the economic, social or environmental aspects and evaluated alternatives that can increase the overall sustainability of the project. Finally, the alternatives that can be used to indicate the most sustainable option are identified. This method was applied in a project (design) of a small offshore platform. This case study shows how the APSE can contribute to the identification of sustainability initiatives for the enterprise. The results showed that relevant aspects can contribute decisively to global sustainability. Finally, it was observed that the proposed method can contribute to increased rates of sustainability, even after application of analysis commonly used in these projects

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Activities that have fuel subterranean storage system are considered potentially polluting fuels by CONAMA Resolution 273, due to the possibility of leak, outpouring and overflow of fuel into the ground. Being even more worrying when contaminate groundwater for public supply, as the case of Natal City. For this reason, the Public Ministry/RN, in partnership with UFRN, developed the project environmental suitability of Gas stations in Natal, of which 36% showed evidence of contamination. This paper describes the four stages of the management of contaminated areas: preliminary assessment of environmental liabilities, detailed confirmatory investigation of the contamination, risk analysis to human health (RBCA), as well as the remediation plan of degraded areas. Therefore it is presented a case study. For the area investigated has been proposed a mathematical method to estimate the volume of LNAPL by a free CAD software (ScketchUp) and compare it with the partition method for grid area. Were also performed 3D graphics designs of feathers contamination. Research results showed that passive benzene contamination in groundwater was 2791.77 μg/L, when the maximum allowed by CONAMA Resolution 420 is 5 μg/L which is the potability standards. The individual and cumulative risks were calculated from 4.4 x10-3, both above the limits of 1.0 x10-5 or by RBCA 1.0 x10-6 by the Public Ministry/RN. Corrective action points that remediation of dissolved phase benzene is expected to reach a concentration of 25 μg/L, based on carcinogenic risk for ingestion of groundwater by residents residential, diverging legislation. According to the proposed model, the volume of LNAPL using the ScketchUp was 17.59 m3, while by the grid partitioning method was 14.02 m3. Because of the low recovery, the expected removal of LNAPL is 11 years, if the multiphase extraction system installed in the enterprise is not optimized