2 resultados para real-scale modelling
em Universidade Federal do Rio Grande do Norte(UFRN)
Resumo:
This work intends to develop an approach based through scientific criteria in the operational diagnosis of ponds of stabilization, starting from analyses accomplished in loco and in laboratory of 78 systems of sewer treatment through ponds of stabilization in the State of Rio Grande do Norte. The objectives of the research are: to map, to evaluate and to diagnose the operational acting of the ponds of stabilization of the state of Rio Grande do Norte, through visits in loco and analyses laboratory; to build a SIG, through the map rain, locate the points of releases of sewages of the systems of existent ponds in Rio Grande do Norte, as well as operational data and his/her respective efficiency diagnosis in the removal of BOD and Coliforms Termotolerantes; to evaluate, in real scale, three systems of ponds of stabilization of RN in the operational efficiency for the parameters BOD5, COD, pH, Temperature, OD and Coliforms Termotolerantes. Of 78 ETEs of appraised RN just, 9% or 7 had maximum concepts in what concerns the removal of BOD and Coliforms Termotolerantes and 41% or 32, they had the worst concepts in term of operational efficiency. The flowing concentrations ETEs of RN of BOD and Coliforms were of 410mg/L and 2,50x107UFC/100ml, the predominant configuration is of the type F1+M1+M2, the relationship BOD/COD revealed for the sewer tributary characteristic biodegradable high. For the study of case of 3 ETEs, the best operational efficiencies in decreasing order were: Cidade (Municipal district), it Roça (State) and São Miguel (SAAE). The removals of final BOD were 51,6mg/L; 108,27mg/L and 62,6mg/L, tends efficiency of 82%; 74% and 81%. In term of coliforms removal in the final effluentes were 1,90x103UFC/100ml; 1,50x104UFC/100ml and 3,10x104UFC/100ml, tends efficiencies of 99,99%; 99,95% and 99,90%. In what it concerns the practice of agricultural reúso of cultures consumed raw, none of 3 ETEs assisted the parameters of the Resolution CONAMA 357/05, for other reúso practices, all assisted the categories B and C of OMS. For release in body receiving ETE Cidade just, they assist the demands of the resolution of CONAMA 357/05, by study of purification solemnity of the receiving body. The maintenance lack and operation; exclusive operator in ETEs and operation knowledge was the contributory factors for the operational fall in appraised ETEs of RN
Resumo:
In the state of Rio Grande do Norte (RN), Brazil, there are about 80 sewage treatment systems being the predominant technology waste stabilization ponds. The Baldo s WWTP , due to its location and low availability of area, was designed as a hybrid conventional system (UASB reactor followed by activated sludge with biodiscs) at a tertiary level, being the most advanced WWTP in the State and also with the larger treatment capacity (1620 m3/h) .The paper presents the results of its performance based on samples collections from May to December 2012. Composite samples of the effluent of the grit chamber, UASB reactors, anoxic chambers, aeration tanks and treated effluent were collected weekly, every 4 hours for 24 hours. The results showed that the WWTP effluent presented adequate ranges of temperatures, pH and DO, however removal efficiencies of BOD and TSS were below the predicted by design. The UASB reactors also showed removals of BOD and TSS less than expected, due to the accumulation of sludge in the reactors, which eventually, was washed out in the effluent. The nitrification process was not satisfactory mainly due to problems in the oxygen distribution in the aeration tanks. The removal of ammonia and TKN were high, probably by the assimilation process