5 resultados para photovoltaic (PV) power systems

em Universidade Federal do Rio Grande do Norte(UFRN)


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study presents a description of the development model of a representation of simplified grid applied in hybrid load flow for calculation of the voltage variations in a steady-state caused by the wind farm on power system. Also, it proposes an optimal load-flow able to control power factor on connection bar and to minimize the loss. The analysis process on system, led by the wind producer, it has as base given technician supplied by the grid. So, the propose model to the simplification of the grid that allows the necessity of some knowledge only about the data referring the internal network, that is, the part of the network that interests in the analysis. In this way, it is intended to supply forms for the auxiliary in the systematization of the relations between the sector agents. The model for simplified network proposed identifies the internal network, external network and the buses of boulders from a study of vulnerability of the network, attributing them floating liquid powers attributing slack models. It was opted to apply the presented model in Newton-Raphson and a hybrid load flow, composed by The Gauss-Seidel method Zbarra and Summation Power. Finally, presents the results obtained to a developed computational environment of SCILAB and FORTRAN, with their respective analysis and conclusion, comparing them with the ANAREDE

Relevância:

100.00% 100.00%

Publicador:

Resumo:

At present, the electricity generation through wind energy has an importance growing in the world, with the existence of very large plans for future wind power installation worldwide. Thus, the increasing the electricity generation through wind power requires, more and more, analysis of studies of interaction between wind parks and electric power systems. This paper has as purposes to implement equivalent models for synchronous wind generators to represent a wind park in ATP program and to check behavior of the models through simulations. Simulations with applications of faults were achieved to evaluate the behavior of voltages of system for each equivalent model, through comparisons between the results of models proposed, to verify if the differences obtained allows the adoption of the simplest model

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This work presents a description of models development at DigSILENT PowerFactoryT M program for the transient stability study in power systems with wind turbine. The main goal is to make available means to use a dynamic simulation program in power systems, widely published, and utilize it as a tool that helps in programs results evaluations used for this intent. The process of simulations and analyses results starts after the models setting description phase. The results obtained by the DigSILENT PowerFactoryT M and ATP, program chosen to the validation also international recognized, are compared during this phase. The main tools and guide lines of PowerFactoryT M program use are presented here, directing these elements to the solution of the approached problem. For the simulation it is used a real system which it will be connected a wind farm. Two different technologies of wind turbines were implemented: doublyfed induction generator with frequency converter, connecting the rotor to the stator and to the grid, and synchronous wind generator with frequency converter, interconnecting the generator to the grid. Besides presenting the basic conceptions of dynamic simulation, it is described the implemented control strategies and models of turbine and converters. The stability of the wind turbine interconnected to grid is analyzed in many operational conditions, resultant of diverse kinds of disturbances

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This work aims to predict the total maximum demand of a transformer that will be used in power systems to attend a Multiple Unit Consumption (MUC) in design. In 1987, COSERN noted that calculation of maximum total demand for a building should be different from that which defines the scaling of the input protection extension in order to not overestimate the power of the transformer. Since then there have been many changes, both in consumption habits of the population, as in electrical appliances, so that this work will endeavor to improve the estimation of peak demand. For the survey, data were collected for identification and electrical projects in different MUCs located in Natal. In some of them, measurements were made of demand for 7 consecutive days and adjusted for an integration interval of 30 minutes. The estimation of the maximum demand was made through mathematical models that calculate the desired response from a set of information previously known of MUCs. The models tested were simple linear regressions, multiple linear regressions and artificial neural networks. The various calculated results over the study were compared, and ultimately, the best answer found was put into comparison with the previously proposed model

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This work develops a methodology for defining the maximum active power being injected into predefined nodes in the studied distribution networks, considering the possibility of multiple accesses of generating units. The definition of these maximum values is obtained from an optimization study, in which further losses should not exceed those of the base case, i.e., without the presence of distributed generation. The restrictions on the loading of the branches and voltages of the system are respected. To face the problem it is proposed an algorithm, which is based on the numerical method called particle swarm optimization, applied to the study of AC conventional load flow and optimal load flow for maximizing the penetration of distributed generation. Alternatively, the Newton-Raphson method was incorporated to resolution of the load flow. The computer program is performed with the SCILAB software. The proposed algorithm is tested with the data from the IEEE network with 14 nodes and from another network, this one from the Rio Grande do Norte State, at a high voltage (69 kV), with 25 nodes. The algorithm defines allowed values of nominal active power of distributed generation, in percentage terms relative to the demand of the network, from reference values