12 resultados para Water Distribution Networks Infrastructure Health

em Universidade Federal do Rio Grande do Norte(UFRN)


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This dissertation presents a methodology to the optimization of a predial system of cold water distribution. It s about a study of a case applied to the Tropical Buzios Residential Condominium, located in the Búzio s Beach, Nísia Floresta city, the east coast of the Rio Grande do Norte state, twenty kilometers far from Natal. The design of cold water distribution networks according to Norm NBR 5626 of the ABNT - Brazilian Association of Techniques Norms, does not guarantee that the joined solution is the optimal solution of less cost. It s necessary the use of an optimization methodology, that supplies us, between all the possible solutions, the minimum cost solution. In the optimization process of the predial system of water distribution of the Tropical Búzios Condominium, is used Method Granados, that is an iterative algorithm of optimization, based on the Dynamic Programming, that supplies the minimum cost s network, in function of the piezometric quota of the reservoir. For the application of this Method in ramifies networks, is used a program of computer in C language. This process is divided in two stages: attainment of the previous solution and reduction of the piezometric quota of headboard. In the attainment of the previous solution, the minors possible diameters are used that guarantee the limit of maximum speed and the requirements of minimum pressures. The piezometric quota of headboard is raised to guarantee these requirements. In the second stage of the Granados Method, an iterative process is used and it objective is to reduce the quota of headboard gradually, considering the substitution of stretches of the network pipes for the subsequent diameters, considering a minimum addition of the network cost. The diameter change is made in the optimal stretch that presents the lesser Exchange Gradient. The process is locked up when the headboard quota of desired is reached. The optimized network s material costs are calculated, and is made the analysis of the same ones, through the comparison with the conventional network s costs

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The market-assisted land reform (RAAM) has been constituted as an alternative of agrarian reform funded by the Programa Nacional do Crédito Fundiário (PNCF). It is a policy of acquisition, distribution and use of Earth ideologically disseminated and funded by the World Bank in the context of productive insertion of landless workers. Accordingly, this study seeks to analyze the trajectory of rural settlements financed by this policy, seeking to understand what factors promote or limit the process of rural development of those settlements. To do so, take as a reference case study of the Assentamento da Fazenda Paz, in the municipality of Maxaranguape in the State of Rio Grande do Norte. From the methodological point of view, bibliographical and documentary research were used, in addition to visits to the settlement and semi-structured interviews with the settlers, trade union leaders, consultants and technicians linked to the project. Assuming the reports of respondents, initially constructs the hypothesis that informal and formal institutions present in the Assentamento da Fazenda Paz were unable to effectively coordinate the actions of the agents. The results obtained showed the existence of a very complex undertaking, with a total area of 607 hectares and 80 families settled, endowed with good quality water and irrigation infrastructure, with assets of approximately R$ 5 million reais. Experience experienced by the settlers understood the development of complex systems of production and marketing of fruits and vegetables, with an emphasis on the cultivation of papaya in an area of 45 hectares based on modern irrigation system and extensive use of technology. Collective management of production, marketing, revenue and costs stood out as a major challenge for the settlers and their representative organisations, i.e. the Community Association and the cooperative. From this observation it was possible to identify two moments on the trajectory of the project: the first, between 2007-2011, considered by respondents as successful, in which the integration of public policies and abundant input of revenue from the commercialization of the fruits da Paz, mainly through the sale of papaya and pineapple in national and international markets, allowed an average remuneration of R$ 800.00 reais to R$ 1,000 reais seated/monthIn addition to the production of vegetables and other types of products for sale and consumption; the second, from 2012, characterized as a failure, due to the discontinuity of the cultivation, production and marketing of fruits based on the collective bargaining model deployed. Important factors explain the discontinuity of the project, including the model of agriculture implemented, difficulties related to the management of production, marketing and finance the venture, in addition to the breach of trust between the Board of the cooperative and the associates and the distancing of the governmental organizations more directly responsible for the project. It is therefore concluded that we must to rethink rural development as a multidimensional phenomenon, requiring a broad engagement between State and society under the foundations of a territorial development contract

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Background The chronic cumulative nature of caries makes treatment needs a severe problem in adults. Despite the fact that oral diseases occur in social contexts, there are few studies using multilevel analyses focusing on treatment needs. Thus, considering the importance of context in explaining oral health related inequalities, this study aims to evaluate the social determinants of dental treatment needs in 35–44 year old Brazilian adults, assessing whether inequalities in needs are expressed at individual and contextual levels. Methods The dependent variables were based on the prevalence of normative dental treatment needs in adults: (a) restorative treatment; (b) tooth extraction and (c) prosthetic treatment. The independent variables at first level were household income, formal education level, sex and race. At second level, income, sanitation, infrastructure and house conditions. The city-level variables were the Human Development Index (HDI) and indicators related to health services. Exploratory analysis was performed evaluating the effect of each level through calculating Prevalence Ratios (PR). In addition, a three-level multilevel modelling was constructed for all outcomes to verify the effect of individual characteristics and also the influence of context. Results In relation to the need for restorative treatment, the main factors implicated were related to individual socioeconomic position, however the city-level contextual effect should also be considered. Regarding need for tooth extraction, the contextual effect does not seem to be important and, in relation to the needs for prosthetic treatment, the final model showed effect of individual-level and city-level. Variables related to health services did not show significant effects. Conclusions Dental treatment needs related to primary care (restoration and tooth extraction) and secondary care (prosthesis) were strongly associated with individual socioeconomic position, mainly income and education, in Brazilian adults. In addition to this individual effect, a city-level contextual effect, represented by HDI, was also observed for need for restorations and prosthesis, but not for tooth extractions. These findings have important implications for the health policy especially for financing and planning, since the distribution of oral health resources must consider the inequalities in availability and affordability of dental care for all.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Most algorithms for state estimation based on the classical model are just adequate for use in transmission networks. Few algorithms were developed specifically for distribution systems, probably because of the little amount of data available in real time. Most overhead feeders possess just current and voltage measurements at the middle voltage bus-bar at the substation. In this way, classical algorithms are of difficult implementation, even considering off-line acquired data as pseudo-measurements. However, the necessity of automating the operation of distribution networks, mainly in regard to the selectivity of protection systems, as well to implement possibilities of load transfer maneuvers, is changing the network planning policy. In this way, some equipments incorporating telemetry and command modules have been installed in order to improve operational features, and so increasing the amount of measurement data available in real-time in the System Operation Center (SOC). This encourages the development of a state estimator model, involving real-time information and pseudo-measurements of loads, that are built from typical power factors and utilization factors (demand factors) of distribution transformers. This work reports about the development of a new state estimation method, specific for radial distribution systems. The main algorithm of the method is based on the power summation load flow. The estimation is carried out piecewise, section by section of the feeder, going from the substation to the terminal nodes. For each section, a measurement model is built, resulting in a nonlinear overdetermined equations set, whose solution is achieved by the Gaussian normal equation. The estimated variables of a section are used as pseudo-measurements for the next section. In general, a measurement set for a generic section consists of pseudo-measurements of power flows and nodal voltages obtained from the previous section or measurements in real-time, if they exist -, besides pseudomeasurements of injected powers for the power summations, whose functions are the load flow equations, assuming that the network can be represented by its single-phase equivalent. The great advantage of the algorithm is its simplicity and low computational effort. Moreover, the algorithm is very efficient, in regard to the accuracy of the estimated values. Besides the power summation state estimator, this work shows how other algorithms could be adapted to provide state estimation of middle voltage substations and networks, namely Schweppes method and an algorithm based on current proportionality, that is usually adopted for network planning tasks. Both estimators were implemented not only as alternatives for the proposed method, but also looking for getting results that give support for its validation. Once in most cases no power measurement is performed at beginning of the feeder and this is required for implementing the power summation estimations method, a new algorithm for estimating the network variables at the middle voltage bus-bar was also developed

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The reconfiguration of a distribution network is a change in its topology, aiming to provide specific operation conditions of the network, by changing the status of its switches. It can be performed regardless of any system anomaly. The service restoration is a particular case of reconfiguration and should be performed whenever there is a network failure or whenever one or more sections of a feeder have been taken out of service for maintenance. In such cases, loads that are supplied through lines sections that are downstream of portions removed for maintenance may be supplied by the closing of switches to the others feeders. By classical methods of reconfiguration, several switches may be required beyond those used to perform the restoration service. This includes switching feeders in the same substation or for substations that do not have any direct connection to the faulted feeder. These operations can cause discomfort, losses and dissatisfaction among consumers, as well as a negative reputation for the energy company. The purpose of this thesis is to develop a heuristic for reconfiguration of a distribution network, upon the occurrence of a failure in this network, making the switching only for feeders directly involved in this specific failed segment, considering that the switching applied is related exclusively to the isolation of failed sections and bars, as well as to supply electricity to the islands generated by the condition, with significant reduction in the number of applications of load flows, due to the use of sensitivity parameters for determining voltages and currents estimated on bars and lines of the feeders directly involved with that failed segment. A comparison between this process and classical methods is performed for different test networks from the literature about networks reconfiguration

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This work develops a methodology for defining the maximum active power being injected into predefined nodes in the studied distribution networks, considering the possibility of multiple accesses of generating units. The definition of these maximum values is obtained from an optimization study, in which further losses should not exceed those of the base case, i.e., without the presence of distributed generation. The restrictions on the loading of the branches and voltages of the system are respected. To face the problem it is proposed an algorithm, which is based on the numerical method called particle swarm optimization, applied to the study of AC conventional load flow and optimal load flow for maximizing the penetration of distributed generation. Alternatively, the Newton-Raphson method was incorporated to resolution of the load flow. The computer program is performed with the SCILAB software. The proposed algorithm is tested with the data from the IEEE network with 14 nodes and from another network, this one from the Rio Grande do Norte State, at a high voltage (69 kV), with 25 nodes. The algorithm defines allowed values of nominal active power of distributed generation, in percentage terms relative to the demand of the network, from reference values

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this study is to characterize and evaluate the Macro System of Regional Water Distribution Natal North (RNN) and Southern Regional Natal (RNS), covering 35% and 65% respectively of the Natal-RN City. The terms of the quality and quantity of water (surface and groundwater) were also evaluated in order to adjust the parameters that contribute to proper distribution and control in water reserves. The methodology of the work took place from collecting volumetric data of production capacity and distribution of the two treatment plants for Regional as well as the flow rates of wells. Yet the quantitative capacity of reservation, distribution and consumption of the main reservoirs, population numbers and consumption of members neighborhoods were collected. Data were tabulated and used in computational simulator EPANET to diagnose possible through the water balance, the offers and demands on the water supply system in the neighborhoods of the capital, linking them to specific distribution points. We also evaluated the wells in the levels of nitrate in water consumed. As a result it was found that some neighborhoods in the South Regional Natal, was ranked as critical supply situation: City of Hope, Lagoa Nova and Nova Descoberta, where demand exceeds supply. While in most Northern Regional Natal present deficiency in the supply system as: Lagoa Azul, the Parque dos Coqueiros, igapó, Amarante and Salinas. The rates of nitrate in the city were significant, but manageable with corrective and preventive measures. The averages were 12 mg /l-N in Candelária, 10 mg/l-N in Lagoa Nova, 9 mg/l-N in Satelite, 20 mg/l-N in Gramore and 15 mg/l-N in N. Sra. Apresentação. Therefore proper distribution of water abstracted and implementation of quality control ensures the supply required by the system, associated with preservation of Water Resources of the Metropolitan Region of Natal

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This dissertation try to understand how management actions implemented by Monsenhor Walfredo Gurgel Hospital in the city of Natal promote effectively the benefits of Home Care Services / Programa Melhor em Casa . The research is exploratory and descriptive, qualitative approach. Data were collected through document analysis and the interviews with the managers of the Program in Health Department and Hospital beyond the questionnaires with the home care teams and technical management unit of Hospital Jobs. The information were treatment trough categories that analyzed to implemented actions and program objectives. The results show that: the practices carried out by the host teams produce the humanization of care by seeking to ensure access to health services and solving human form; networks of health care are not yet finalized hindering the referral of patients to other units, the networks allow support from other institutions to minimize the problems encountered, the management unit vacancies allows the reduction of costs, mainly by regulating beds and record of health initiatives in home care assists in the monitoring and evaluation process of the Services Home Care / Programa Melhor em Casa primarily the epidemiological profile and patients individual treatment plan. Concludes that most of the actions implemented by the Hospital contribute to the effectiveness of the goals of Programa Melhor em Casa

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Quadratic Minimum Spanning Tree Problem (QMST) is a version of the Minimum Spanning Tree Problem in which, besides the traditional linear costs, there is a quadratic structure of costs. This quadratic structure models interaction effects between pairs of edges. Linear and quadratic costs are added up to constitute the total cost of the spanning tree, which must be minimized. When these interactions are restricted to adjacent edges, the problem is named Adjacent Only Quadratic Minimum Spanning Tree (AQMST). AQMST and QMST are NP-hard problems that model several problems of transport and distribution networks design. In general, AQMST arises as a more suitable model for real problems. Although, in literature, linear and quadratic costs are added, in real applications, they may be conflicting. In this case, it may be interesting to consider these costs separately. In this sense, Multiobjective Optimization provides a more realistic model for QMST and AQMST. A review of the state-of-the-art, so far, was not able to find papers regarding these problems under a biobjective point of view. Thus, the objective of this Thesis is the development of exact and heuristic algorithms for the Biobjective Adjacent Only Quadratic Spanning Tree Problem (bi-AQST). In order to do so, as theoretical foundation, other NP-hard problems directly related to bi-AQST are discussed: the QMST and AQMST problems. Bracktracking and branch-and-bound exact algorithms are proposed to the target problem of this investigation. The heuristic algorithms developed are: Pareto Local Search, Tabu Search with ejection chain, Transgenetic Algorithm, NSGA-II and a hybridization of the two last-mentioned proposals called NSTA. The proposed algorithms are compared to each other through performance analysis regarding computational experiments with instances adapted from the QMST literature. With regard to exact algorithms, the analysis considers, in particular, the execution time. In case of the heuristic algorithms, besides execution time, the quality of the generated approximation sets is evaluated. Quality indicators are used to assess such information. Appropriate statistical tools are used to measure the performance of exact and heuristic algorithms. Considering the set of instances adopted as well as the criteria of execution time and quality of the generated approximation set, the experiments showed that the Tabu Search with ejection chain approach obtained the best results and the transgenetic algorithm ranked second. The PLS algorithm obtained good quality solutions, but at a very high computational time compared to the other (meta)heuristics, getting the third place. NSTA and NSGA-II algorithms got the last positions

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This work consists on the study of two important problems arising from the operations of petroleum and natural gas industries. The first problem the pipe dimensioning problem on constrained gas distribution networks consists in finding the least cost combination of diameters from a discrete set of commercially available ones for the pipes of a given gas network, such that it respects minimum pressure requirements at each demand node and upstream pipe conditions. On its turn, the second problem the piston pump unit routing problem comes from the need of defining the piston pump unit routes for visiting a number of non-emergent wells in on-shore fields, i.e., wells which don t have enough pressure to make the oil emerge to surface. The periodic version of this problem takes into account the wells re-filling equation to provide a more accurate planning in the long term. Besides the mathematical formulation of both problems, an exact algorithm and a taboo search were developed for the solution of the first problem and a theoretical limit and a ProtoGene transgenetic algorithm were developed for the solution of the second problem. The main concepts of the metaheuristics are presented along with the details of their application to the cited problems. The obtained results for both applications are promising when compared to theoretical limits and alternate solutions, either relative to the quality of the solutions or to associated running time

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The objective of the current piece of research is to reflect upon the diverse changes that have occurred in the social and spatial dynamics of the Macaíba fair in the period between 1960 and 2006. During the second half of the 19th century, Macaíba had in the commerce one of this principle economic base a contribution for which the city became one of the main commercial warehouses of the East coast of the Rio Grande do Norte region. This helped lead to the growth of Macaíba s fair, which proved to be one of the most important existing in the state until the 1970 s. In the last two decades of the 20th century, certain elements represented challenges to the fair at Macaíba. These challenges stimulated substantial changes in the fair s dynamics which include the growth and expansion of the commercial and service sector, primarily though supermarkets; consolidation among the commercial and distribution networks, represented by the Central Office of Supply of the Rio Grande do Norte S/A (Ceasa/RN), by the wholesale and refrigeration companies; and the modernization of transportation methods, which permitted an expanded reach for these networks. Even with all these changes, the fair continues to be one of the strongest aspects of the city being the center of resistance against the surge of new forms of commerce and consumption in the city (notable the supermarkets) and the diffusion of other aspects of globalization. The fair has economic importance, as it offers a popular marketplace for the commercialization of very different products and a means for supplying goods to the residents of the city and the rural communities of Macaíba and the surrounding municipalities; and socio-cultural importance in that the fair is a place where popular tradition is expressed, a place where a great number of parallel activities occur, a place for meeting again and again, of conversations, of manifestations of culture and art, and of socialization in all of its dimensions

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Nowadays we can observe in Natal city, the development of the structure and the health s private service. However, the spatial distribution of these services will be marked by an uneven distribution on the places, what will be in according with the conditions offered by the same in each historical period. Accordingly, the objective of this job is analyze the use of the territory by the health s private service and the dynamics that promotes in Natal city in the technical scientific information period. Thus, seeking to search this goal, realized literature, documentary, empirical, considering the process of development and the spatial distribution of the health s private service in the city. From a topology we can observe that prevails in the city a service s concentration at all levels of complexity in only a few neighborhoods, being Tirol and Petrópolis, which are neighborhoods that have high densities of engineer system, bigger fluidity, and the best level salaries of the city, which present a greater number of these establishments. However, equal this concentration has occurred a dispersion of these services to other neighborhoods, as for example Lagoa Nova which is presenting the same attractiveness in the view of attributes territorial, begins to protect services presenting the same profile like the firsts. However, the city has a significant demand to this kind of service found in these neighborhoods, some events provided the emergency of another type of market of health s private service, that are those created to attend guests with a lower purchasing power, which will have their establishments in the same way selectively distributed in some areas of the city, which will not be the same pursued by the other, showing how selective is the installation of an enterprise guide by the logic of capitalism reproduction. So, the imperative of spatial selectivity presented by the health s private sector exposes an use of the differential territory for these services