6 resultados para Substations
em Universidade Federal do Rio Grande do Norte(UFRN)
Resumo:
Most algorithms for state estimation based on the classical model are just adequate for use in transmission networks. Few algorithms were developed specifically for distribution systems, probably because of the little amount of data available in real time. Most overhead feeders possess just current and voltage measurements at the middle voltage bus-bar at the substation. In this way, classical algorithms are of difficult implementation, even considering off-line acquired data as pseudo-measurements. However, the necessity of automating the operation of distribution networks, mainly in regard to the selectivity of protection systems, as well to implement possibilities of load transfer maneuvers, is changing the network planning policy. In this way, some equipments incorporating telemetry and command modules have been installed in order to improve operational features, and so increasing the amount of measurement data available in real-time in the System Operation Center (SOC). This encourages the development of a state estimator model, involving real-time information and pseudo-measurements of loads, that are built from typical power factors and utilization factors (demand factors) of distribution transformers. This work reports about the development of a new state estimation method, specific for radial distribution systems. The main algorithm of the method is based on the power summation load flow. The estimation is carried out piecewise, section by section of the feeder, going from the substation to the terminal nodes. For each section, a measurement model is built, resulting in a nonlinear overdetermined equations set, whose solution is achieved by the Gaussian normal equation. The estimated variables of a section are used as pseudo-measurements for the next section. In general, a measurement set for a generic section consists of pseudo-measurements of power flows and nodal voltages obtained from the previous section or measurements in real-time, if they exist -, besides pseudomeasurements of injected powers for the power summations, whose functions are the load flow equations, assuming that the network can be represented by its single-phase equivalent. The great advantage of the algorithm is its simplicity and low computational effort. Moreover, the algorithm is very efficient, in regard to the accuracy of the estimated values. Besides the power summation state estimator, this work shows how other algorithms could be adapted to provide state estimation of middle voltage substations and networks, namely Schweppes method and an algorithm based on current proportionality, that is usually adopted for network planning tasks. Both estimators were implemented not only as alternatives for the proposed method, but also looking for getting results that give support for its validation. Once in most cases no power measurement is performed at beginning of the feeder and this is required for implementing the power summation estimations method, a new algorithm for estimating the network variables at the middle voltage bus-bar was also developed
Resumo:
The reconfiguration of a distribution network is a change in its topology, aiming to provide specific operation conditions of the network, by changing the status of its switches. It can be performed regardless of any system anomaly. The service restoration is a particular case of reconfiguration and should be performed whenever there is a network failure or whenever one or more sections of a feeder have been taken out of service for maintenance. In such cases, loads that are supplied through lines sections that are downstream of portions removed for maintenance may be supplied by the closing of switches to the others feeders. By classical methods of reconfiguration, several switches may be required beyond those used to perform the restoration service. This includes switching feeders in the same substation or for substations that do not have any direct connection to the faulted feeder. These operations can cause discomfort, losses and dissatisfaction among consumers, as well as a negative reputation for the energy company. The purpose of this thesis is to develop a heuristic for reconfiguration of a distribution network, upon the occurrence of a failure in this network, making the switching only for feeders directly involved in this specific failed segment, considering that the switching applied is related exclusively to the isolation of failed sections and bars, as well as to supply electricity to the islands generated by the condition, with significant reduction in the number of applications of load flows, due to the use of sensitivity parameters for determining voltages and currents estimated on bars and lines of the feeders directly involved with that failed segment. A comparison between this process and classical methods is performed for different test networks from the literature about networks reconfiguration
Resumo:
T'his dissertation proposes alternative models to allow the interconnectioin of the data communication networks of COSERN Companhia Energética do Rio Grande do Norte. These networks comprise the oorporative data network, based on TCP/IP architecture, and the automation system linking remote electric energy distribution substations to the main Operatin Centre, based on digital radio links and using the IEC 60870-5-101 protoco1s. The envisaged interconnection aims to provide automation data originated from substations with a contingent route to the Operation Center, in moments of failure or maintenance of the digital radio links. Among the presented models, the one chosen for development consists of a computational prototype based on a standard personal computer, working under LINUX operational system and running na application, developesd in C language, wich functions as a Gateway between the protocols of the TCP/IP stack and the IEC 60870-5-101 suite. So, it is described this model analysis, implementation and tests of functionality and performance. During the test phase it was basically verified the delay introduced by the TCP/IP network when transporting automation data, in order to guarantee that it was cionsistent with the time periods present on the automation network. Besides , additional modules are suggested to the prototype, in order to handle other issues such as security and prioriz\ation of the automation system data, whenever they are travesing the TCP/IP network. Finally, a study hás been done aiming to integrate, in more complete way, the two considered networks. It uses IP platform as a solution of convergence to the communication subsystem of na unified network, as the most recente market tendencies for supervisory and other automation systems indicate
Resumo:
The electric energy is essential to the development of modern society and its increasing demand in recent years, effect from population and economic growth, becomes the companies more interested in the quality and continuity of supply, factors regulated by ANEEL (Agência Nacional de Energia Elétrica). These factors must be attended when a permanent fault occurs in the system, where the defect location that caused the power interruption should be identified quickly, which is not a simple assignment because the current systems complexity. An example of this occurs in multiple terminals transmission lines, which interconnect existing circuits to feed the demand. These transmission lines have been adopted as a feasible solution to suply loads of magnitudes that do not justify economically the construction of new substations. This paper presents a fault location algorithm for multiple terminals transmission lines - two and three terminals. The location method is based on the use of voltage and current fundamental phasors, as well as the representation of the line through its series impedance. The wavelet transform is an effective mathematical tool in signals analysis with discontinuities and, therefore, is used to synchronize voltage and current data. The Fourier transform is another tool used in this work for extract voltage and current fundamental phasors. Tests to validate the location algorithm applicability used data from faulty signals simulated in ATP (Alternative Transients Program) as well as real data obtained from oscillographic recorders installed on CHESF s lines.
Resumo:
One of the most important decisions to turn a substation automatic and no attended it relates to the communication media between this substation and Operation Center. Generally energy companies uses radio or optic fiber, depending of distances and infrastructure of each situation. This rule applies to common substations. Mobile substations are a particular case, therefore they are conceived for use at provisional situations, emergencies, preventive or corrective maintenance. Thus the telecommunication solution used at common substations are not applied so easily to mobile substations, due absence of infrastructure (media) or difficulty to insert the mobile substation data in existing automation network not long. The ideal media must supply covering in a great geographic area to satisfy presented requirements. The implantation costs of this big infrastructure are expensive, however a existing operator may be used. Two services that fulfill that requirements are satellite and cellular telephony. This work presents a solution for automation of mobile substations through satellite. It was successfully implanted at a brazilian electric energy concessionaire named COSERN. The operation became transparent to operators. Other gotten benefits had been operational security, quality in the supply of electric energy and costs reduction. The project presented is a new solution, designed to substations and general applications where few data should be transmitted, but there is difficulties in relation to the media. Despite the satellite having been used, the same resulted can be gotten using celullar telephony, through Short Messages or packet networks as GPRS or EDGE.
Resumo:
The opening of the Brazilian market of electricity and competitiveness between companies in the energy sector make the search for useful information and tools that will assist in decision making activities, increase by the concessionaires. An important source of knowledge for these utilities is the time series of energy demand. The identification of behavior patterns and description of events become important for the planning execution, seeking improvements in service quality and financial benefits. This dissertation presents a methodology based on mining and representation tools of time series, in order to extract knowledge that relate series of electricity demand in various substations connected of a electric utility. The method exploits the relationship of duration, coincidence and partial order of events in multi-dimensionals time series. To represent the knowledge is used the language proposed by Mörchen (2005) called Time Series Knowledge Representation (TSKR). We conducted a case study using time series of energy demand of 8 substations interconnected by a ring system, which feeds the metropolitan area of Goiânia-GO, provided by CELG (Companhia Energética de Goiás), responsible for the service of power distribution in the state of Goiás (Brazil). Using the proposed methodology were extracted three levels of knowledge that describe the behavior of the system studied, representing clearly the system dynamics, becoming a tool to assist planning activities