10 resultados para Gerenciamento de risco de crédito

em Universidade Federal do Rio Grande do Norte(UFRN)


Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this work we study a new risk model for a firm which is sensitive to its credit quality, proposed by Yang(2003): Are obtained recursive equations for finite time ruin probability and distribution of ruin time and Volterra type integral equation systems for ultimate ruin probability, severity of ruin and distribution of surplus before and after ruin

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Over the years there has been a broader definition of the term health. At the same time it was found also an evolution of the concept of health care which in turn has led to changes in the approach to delivery of health services and hence in its management. In this regard, currently the nephrology services have been searching for quality technical and social need. In view of these innovations and the quest for quality, it elaborated the general objective: to develop a quality assessment protocol for dialysis service Onofre Lopes University Hospital. It is an intervention project effected through an action research, which consisted of 4 steps. Initially was identified through a literature search in scientific literature, which quality indicators would apply to a dialysis unit being selected as follows: infection rate in hemodialysis access site, microbiological control of water used for hemodialysis and Index User satisfaction. Through critical reflection on the theme researched in the previous step, it was drawn up three data collection instruments, interview form type, applied between the months of October and November 2015. In addition to the information obtained, also made up of the use of information retrieval technique. The results were organized in graphs and tables and analyzed using qualitative and exploratory technical approach. Then a reflective analysis of the data obtained and the diagnosis of reality studied was traced and confronted with the literature was performed. The data produced in this study revealed that the Dialysis Unit of HUOL is much to be desired, considering that some weaknesses have been identified in its structure. Faced with this finding have been proposed, as a contribution and aiming to guide the development of future actions, suggestions for improvement that should be implemented and monitored to be assured overcoming these difficulties, allowing an appropriate organizational restructuring, and resulting in improved service public offered. It was concluded that for hemodialysis treatment results are achieved and positive, it is necessary to have physical structure and adequate infrastructure, multidisciplinary team specialized, trained and in sufficient quantity, well designed processes for professionals to have standards to be followed decreasing the chance to err, and a risk management system to detect and control situations that endanger patient safety.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Over the years there has been a broader definition of the term health. At the same time it was found also an evolution of the concept of health care which in turn has led to changes in the approach to delivery of health services and hence in its management. In this regard, currently the nephrology services have been searching for quality technical and social need. In view of these innovations and the quest for quality, it elaborated the general objective: to develop a quality assessment protocol for dialysis service Onofre Lopes University Hospital. It is an intervention project effected through an action research, which consisted of 4 steps. Initially was identified through a literature search in scientific literature, which quality indicators would apply to a dialysis unit being selected as follows: infection rate in hemodialysis access site, microbiological control of water used for hemodialysis and Index User satisfaction. Through critical reflection on the theme researched in the previous step, it was drawn up three data collection instruments, interview form type, applied between the months of October and November 2015. In addition to the information obtained, also made up of the use of information retrieval technique. The results were organized in graphs and tables and analyzed using qualitative and exploratory technical approach. Then a reflective analysis of the data obtained and the diagnosis of reality studied was traced and confronted with the literature was performed. The data produced in this study revealed that the Dialysis Unit of HUOL is much to be desired, considering that some weaknesses have been identified in its structure. Faced with this finding have been proposed, as a contribution and aiming to guide the development of future actions, suggestions for improvement that should be implemented and monitored to be assured overcoming these difficulties, allowing an appropriate organizational restructuring, and resulting in improved service public offered. It was concluded that for hemodialysis treatment results are achieved and positive, it is necessary to have physical structure and adequate infrastructure, multidisciplinary team specialized, trained and in sufficient quantity, well designed processes for professionals to have standards to be followed decreasing the chance to err, and a risk management system to detect and control situations that endanger patient safety.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In the operational context of industrial processes, alarm, by definition, is a warning to the operator that an action with limited time to run is required, while the event is a change of state information, which does not require action by the operator, therefore should not be advertised, and only stored for analysis of maintenance, incidents and used for signaling / monitoring (EEMUA, 2007). However, alarms and events are often confused and improperly configured similarly by developers of automation systems. This practice results in a high amount of pseudo-alarms during the operation of industrial processes. The high number of alarms is a major obstacle to improving operational efficiency, making it difficult to identify problems and increasing the time to respond to abnormalities. The main consequences of this scenario are the increased risk to personal safety, facilities, environment deterioration and loss of production. The aim of this paper is to present a philosophy for setting up a system of supervision and control, developed with the aim of reducing the amount of pseudo-alarms and increase reliability of the information that the system provides. A real case study was conducted in the automation system of the offshore production of hydrocarbons from Petrobras in Rio Grande do Norte, in order to validate the application of this new methodology. The work followed the premises of the tool presented in ISA SP18.2. 2009, called "life cycle alarm . After the implementation of methodology there was a significant reduction in the number of alarms

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Activities that have fuel subterranean storage system are considered potentially polluting fuels by CONAMA Resolution 273, due to the possibility of leak, outpouring and overflow of fuel into the ground. Being even more worrying when contaminate groundwater for public supply, as the case of Natal City. For this reason, the Public Ministry/RN, in partnership with UFRN, developed the project environmental suitability of Gas stations in Natal, of which 36% showed evidence of contamination. This paper describes the four stages of the management of contaminated areas: preliminary assessment of environmental liabilities, detailed confirmatory investigation of the contamination, risk analysis to human health (RBCA), as well as the remediation plan of degraded areas. Therefore it is presented a case study. For the area investigated has been proposed a mathematical method to estimate the volume of LNAPL by a free CAD software (ScketchUp) and compare it with the partition method for grid area. Were also performed 3D graphics designs of feathers contamination. Research results showed that passive benzene contamination in groundwater was 2791.77 μg/L, when the maximum allowed by CONAMA Resolution 420 is 5 μg/L which is the potability standards. The individual and cumulative risks were calculated from 4.4 x10-3, both above the limits of 1.0 x10-5 or by RBCA 1.0 x10-6 by the Public Ministry/RN. Corrective action points that remediation of dissolved phase benzene is expected to reach a concentration of 25 μg/L, based on carcinogenic risk for ingestion of groundwater by residents residential, diverging legislation. According to the proposed model, the volume of LNAPL using the ScketchUp was 17.59 m3, while by the grid partitioning method was 14.02 m3. Because of the low recovery, the expected removal of LNAPL is 11 years, if the multiphase extraction system installed in the enterprise is not optimized

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The research area is located on the county of Tibau do Sul, in the east coast of Rio Grande do Norte State, about 80km south of the capital Natal. The tourism represents the main income activity and Pipa beach is the most visited beach in the city, annually receives a large influx of domestic and foreign tourists. Some recent studies have reported the occurrence of coastal erosion in this littoral, being the main objective of the research, analyze the existing coastal erosion, through two methodologies, the geoenvironmental mapping and beach morphodynamics. The geoenvironmental mapping was done from oblique aerial photographs and field visits, which sought to carry out first the geomorphological mapping, with the purpose of analyzing features that suggest susceptible areas to erosion, as areas without protection of natural dunes, marine terraces, or sandstones (beach-rocks and ferruginous sandstones), areas with the presence of gullies and stretches where the sea-cliffs were in direct contact with the action of the sea, representing the beginning of the beach profile. In the morphodynamic study sought to carry out the survey of the physical and morphological characteristics, the analysis of sediment grain of the beaches and finally the analysis of the morphodynamic parameters to generate a table of risk to erosion by sector of the beach. The morphodynamic parameters were defined by the methodology proposed by Short (2006), in which considers different patterns of dynamism on beaches with characteristics favorable and unfavorable to erosive profiles. The maps indicated different levels of risk to the segments of the beaches analyzed, suggesting risk to erosion low and low to moderate only in areas north and northwest of the beaches of Madeiro and Curral, and levels of moderate and high risk sectors in the south and southeast of these beaches . The beach of Pipa showed moderate levels of risk and moderate to high at the ends and high risk to erosion in the central portion. The study of the coastal environment, its morphological evolution, and areas with problems of erosion, are of fundamental importance to assist coastal management policies, giving grants for planning activities undertaken in these regions

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The contamination of water bodies with toxic substances causes a decrease in water quality, representing a risk to public health. In this context, human activities are generally seen as the main sources of water degradation. However, elements found naturally in the environment can also compromise water quality. Thus, the Boqueirão‘s dam, located in the municipality of Parelhas (RN, Brazil), was chosen as area for the development of this study, as its geological region is rich in the emission of natural ionizing radiation that produces byproducts like lead and Radon. Moreover, the area has a strong human influence that enhances the risks of pollutant discharge in this body of water.Thus, the objectives of this study were centered (i) in the analysis of risk perception in the city of Parelhas (RN/Brasil) due to the use of the water from the Boqueirão Dam; and (ii) in the assessment of water quality in the Dam using methods that quantify, mainly, heavy metals and radiation levels, as well as these toxics potential of inducing mutations on genetic material. The analysis of risk perception showed that the population in the city of Parelhas can perceive a risk in using the water from the dam and that they can recognize factors that influence the water quality. Regarding the second objective, the set of data point to the contamination of the Dam by heavy metals, as well as levels of radioactive parcicles and Radon – also present in high concentrations in outdoor air and on soil. Thus, it is possible to infer that the population residing in this area is subjected to injuries caused by exposure to natural and anthropogenic contamination. Our findings corroborate with the perception of the population regarding the risks associated with the use of the Dam for several types of activities. It is expected that the information gathered in this study can substantiate activities and future researches in this semiarid region in the Rio Grande do Norte/Brazil. Also, that the set of data can enable a better understanding of the specific toxicological scenario of risk found for the population and the effect of the contamination for the biota, which aids the development of a future risk assessment and a consequent management of this local issue.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The process mapping is an important tool in the management of organizations, allowing better levels of productivity, quality and reciprocity concerning the implementation and decision-making. It benefits in a clear way the process organization and assures the manager a macro vision of the system. In this sense, the objective of this study is to describe the mapping process as it occurs in the Januario Cicco Maternity School–MEJC. The bibliographic and descriptive research included interviews, observations and researches in many databases. The study analyzed the limiting points of the detected flow trying to find a better comprehension of the flow of patients in the maternity in order to offer the gestors the information necessary to improve the quality of the assistance as well as a general view of the flow of patients and any change detected there. As a result, we believe that the process mapping may become a relevant factor to the organizational management of MEJC, in view that it is an element that can contribute to ease up the management of information studied, considering that the perfect change of information inside a complex system will produce improvements in all spheres of this institution.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In the operational context of industrial processes, alarm, by definition, is a warning to the operator that an action with limited time to run is required, while the event is a change of state information, which does not require action by the operator, therefore should not be advertised, and only stored for analysis of maintenance, incidents and used for signaling / monitoring (EEMUA, 2007). However, alarms and events are often confused and improperly configured similarly by developers of automation systems. This practice results in a high amount of pseudo-alarms during the operation of industrial processes. The high number of alarms is a major obstacle to improving operational efficiency, making it difficult to identify problems and increasing the time to respond to abnormalities. The main consequences of this scenario are the increased risk to personal safety, facilities, environment deterioration and loss of production. The aim of this paper is to present a philosophy for setting up a system of supervision and control, developed with the aim of reducing the amount of pseudo-alarms and increase reliability of the information that the system provides. A real case study was conducted in the automation system of the offshore production of hydrocarbons from Petrobras in Rio Grande do Norte, in order to validate the application of this new methodology. The work followed the premises of the tool presented in ISA SP18.2. 2009, called "life cycle alarm . After the implementation of methodology there was a significant reduction in the number of alarms

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Activities that have fuel subterranean storage system are considered potentially polluting fuels by CONAMA Resolution 273, due to the possibility of leak, outpouring and overflow of fuel into the ground. Being even more worrying when contaminate groundwater for public supply, as the case of Natal City. For this reason, the Public Ministry/RN, in partnership with UFRN, developed the project environmental suitability of Gas stations in Natal, of which 36% showed evidence of contamination. This paper describes the four stages of the management of contaminated areas: preliminary assessment of environmental liabilities, detailed confirmatory investigation of the contamination, risk analysis to human health (RBCA), as well as the remediation plan of degraded areas. Therefore it is presented a case study. For the area investigated has been proposed a mathematical method to estimate the volume of LNAPL by a free CAD software (ScketchUp) and compare it with the partition method for grid area. Were also performed 3D graphics designs of feathers contamination. Research results showed that passive benzene contamination in groundwater was 2791.77 μg/L, when the maximum allowed by CONAMA Resolution 420 is 5 μg/L which is the potability standards. The individual and cumulative risks were calculated from 4.4 x10-3, both above the limits of 1.0 x10-5 or by RBCA 1.0 x10-6 by the Public Ministry/RN. Corrective action points that remediation of dissolved phase benzene is expected to reach a concentration of 25 μg/L, based on carcinogenic risk for ingestion of groundwater by residents residential, diverging legislation. According to the proposed model, the volume of LNAPL using the ScketchUp was 17.59 m3, while by the grid partitioning method was 14.02 m3. Because of the low recovery, the expected removal of LNAPL is 11 years, if the multiphase extraction system installed in the enterprise is not optimized