1 resultado para Geological timescale extrapolation

em Universidade Federal do Rio Grande do Norte(UFRN)


Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the last 16 years emerged in Brazil a segment of independent producers with focus on onshore basins and shallow waters. Among the challenges of these companies is the development of fields with projects with a low net present value (NPV). The objective of this work was to study the technical-economical best option to develop an oil field in the Brazilian Northeast using reservoir simulation. Real geology, reservoir and production data was used to build the geological and simulation model. Due to not having PVT analysis, distillation method test data known as the true boiling points (TBP) were used to create a fluids model generating the PVT data. After execution of the history match, four development scenarios were simulated: the extrapolation of production without new investments, the conversion of a producing well for immiscible gas injection, the drilling of a vertical well and the drilling of a horizontal well. As a result, from the financial point of view, the gas injection is the alternative with lower added value, but it may be viable if there are environmental or regulatory restrictions to flaring or venting the produced gas into the atmosphere from this field or neighboring accumulations. The recovery factor achieved with the drilling of vertical and horizontal wells is similar, but the horizontal well is a project of production acceleration; therefore, the present incremental cumulative production with a minimum rate of company's attractiveness is higher. Depending on the crude oil Brent price and the drilling cost, this option can be technically and financially viable.