About 10% of faults involving the electrical system occurs in power transformers. Therefore, the protection applied to the power transformers is essential to ensure the continuous operation of this device and the efficiency of the electrical system. Among the protection functions applied to power transformers, the differential protection appears as one of the main schemes, presenting reliable discrimination between internal faults and external faults or inrush currents. However, when using the low frequency components of the differential currents flowing through the transformer, the main difficulty of the conventional methods of differential protection is the delay for detection of the events. However, internal faults, external faults and other disturbances related to the transformer operation present transient and can be appropriately detected by the wavelet transform. In this paper is proposed the development of a wavelet-based differential protection for detection and identification of external faults to the transformer, internal faults, and transformer energizing by using the wavelet coefficient energy of the differential currents. The obtained results reveal the advantages of using of the wavelet transform in the differential protection compared to conventional protection, since it provides reliability and speed in detection of these events.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This work aims to predict the total maximum demand of a transformer that will be used in power systems to attend a Multiple Unit Consumption (MUC) in design. In 1987, COSERN noted that calculation of maximum total demand for a building should be different from that which defines the scaling of the input protection extension in order to not overestimate the power of the transformer. Since then there have been many changes, both in consumption habits of the population, as in electrical appliances, so that this work will endeavor to improve the estimation of peak demand. For the survey, data were collected for identification and electrical projects in different MUCs located in Natal. In some of them, measurements were made of demand for 7 consecutive days and adjusted for an integration interval of 30 minutes. The estimation of the maximum demand was made through mathematical models that calculate the desired response from a set of information previously known of MUCs. The models tested were simple linear regressions, multiple linear regressions and artificial neural networks. The various calculated results over the study were compared, and ultimately, the best answer found was put into comparison with the previously proposed model