9 resultados para Construction industry - Costs - Economic aspects - Australia

em Universidade Federal do Rio Grande do Norte(UFRN)


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The increasing competitiveness of the construction industry, set in an economic environment in which the offer is now greater than the demand , causes the prices of many products and services, are strongly influenced by the processes of production and the final consumer. Thus, to become more competitive in the market and construction companies are seeking new alternatives to reduce and control costs, production processes and tools that allow for close monitoring of the construction schedule, with the consequent compliance deadline with the client. Based on this scenario, the creation of control tools, service management and planning work emerges as an investment opportunity and an area that can promote great benefits to construction companies. The goal of this work is to present a system of planning, service management and costs control that through worksheets provide information relating to the production phase of the work, allowing the visualization of possible irregularities in the planning and cost of the enterprise, enabling the company to take steps to achieve the goals of the enterprise in question, and correct them when necessary. The developed system has been used in a piece of real estate in Rio Grande do Norte, and the results showed that its use together allowed the construction company to accompany their results and take corrective and preventive actions during the production process, efficiently and effective

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents the validation of the Performance Indicator System for Projects under Construction - SIDECC. The goal was to develop a system of performance indicators from the macroergonômica approach, considering criteria of usefulness, practicality and applicability and the concept of continuous improvement in the construction industry. The validation process SIDECC consisted of three distinct models. Modeling I corresponded to the theoretical development and validation of a system of indicators. Modeling II concerns the development and validation of multi- indicator system. For this modeling, we used the Mother of Use and Importance and Multivariate Analysis. Modeling III corresponded to the validation situated, which consisted of a case study of a work of construction of buildings, which were applied and analyzed the results of modeling II. This work resulted in the development of an applied and tested for the construction of an integrated system of performance indicators methodology, involving aspects of production, quality, environmental, health and safety. It is inferred that the SIDECC can be applied, in full or in part, the construction companies as a whole, as well as in other economic sectors

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper prese nts the validation of the Performance Indicator System for Projects under Construction - SIDECC. The goal was to develop a system of performance indicators from the macroergonômica approach, con sidering criteria of usefulness , practicality and applicabilit y and the concept of continuous improveme nt in the construction industry . The validation process SIDECC consisted of three disti nct models . Modeling I corresponded to the theoretical development and valid ation of a system of indicators . Modeling II concern s the development and valida tion of multi - indicator system . For this modeling, we used the Mother of Use and Importance and Multivariate Analysis . Modeling III correspo nded to the validation situated , which consisted of a case study of a wo rk of construct ion of buildings , which were applied and anal yzed the results of modeling II . This work resulted in the development of an applied and tested for the construction of an integrated system of per formance indicators methodology , involving aspects of production , quality , e nvironmental, health and safety . It is inferred that the SIDECC can be applied, in full or in part , the construction companies as a whole, as we ll as in other economic sectors .

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The meaning of work is a construct that has been studied more systematically from the 80s, through various approaches and in different occupational categories. This dissertation aims to describe and discuss the meanings of work for construction workers. This is an empirical study whose research supports herself in the Model Attributes Meaning of Work and its respective instrument for measuring the Meaning of Work Inventory (STI). The research involved 402 workers in the construction industry sector in the two capitals of the Brazilian Northeast, with a mean age of 35.8 years (SD = 11.4). To collect the data, besides the IST, the Working Conditions Questionnaire and sociodemographic data were also used. Data were organized and analyzed using the SPSS program. The study used data analysis techniques to Smallest Space Analisys (SSA), descriptive statistics, correlation and analysis of variance. There was evidence of validity of the STI which was structured into five types of value attributes (what work should be), and seven types of descriptive attributes (what is working). The results showed that the work has high centrality and profiling for participants after the family, the most important aspect in the lives of workers. Aspects of personal and economic growth were more emphasized in definition of what the work should be and responsibility and effort were characteristics that best described the reality of work.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Considered as one of the oldest activities done by men, the civil construction represents one of the most important sectors for the economic growth of a country, in spite of the low results of growth in the past few years and also in the current year. To make this industry grow, even with an unfavourable economic scenario, it is necessary to implement an effective planning in its activities. This is one of the most important concepts brought by the Lean Construction philosophy, which had its origin through the adaptation of the concepts established by the Toyota Production System (TPS) or Lean Production. By having as a scenario the city of Natal\RN, the main goal of this dissertation consists in investigating how the 11 principles of the lean construction influenced the schedule of a construction field that started to implement its lean concepts. As a methodology, it was used the case study of a big enterprise located in Natal (RN). During the execution of the method, documents related to the short-term, midterm and long-term planning were analysed , aiming to describe its planning process; it was also described the factors that caused the delays at the enterprises’ field ;in addition, a comparison was made between the results obtained at the case study and the ones presented at the literature; in the end, the actions were listed by the company, which had the purpose to solve the main causes of delays, verifying if they were linked to the lean construction principles. This research finds its reason of existence in the relevance of its theme at the nowadays reality of the construction industry, since the principles of the lean construction uphold the reduction of processes that are useless, diminishing wastes as well as costs in construction. The relevance is perceived for the academy, in terms of the possibility to discuss if the concepts established by the lean production are being adapted to the civil construction sector and how this adaptation is influencing at the buildings planning project. Economic importance, because with the reduction of the wastes and costs, the companies may reduce the building´s value into a more accessible value, even with the sector´s lower growth. And social significance, because lean construction gives a better participation of the labour at the planning activity. Among the main results, the high frequency of planning errors stands out, mainly the programming deviations and not the task programming, as well as the execution errors, low productivity and activities executed by the workers. Amongst the 11 principles of lean construction, only five were related with the 12 actions analysed by the author. From the 12 actions, four were completely cohesive to one or more from these five principles. Some improvement proposals were also highlighted and established by the research.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The northeastern region of Brazil has a large number of wells producing oil using a method of secondary recovery steam injection, since the oil produced in this region is essentially viscous. This recovery method puts the cement / coating on thermal cycling, due to the difference in coefficient of thermal expansion between cement and metal coating causes the appearance of cracks at this interface, allowing the passage of the annular fluid, which is associated with serious risk socioeconomic and environmental. In view of these cracks, a correction operation is required, resulting in more costs and temporary halt of production of the well. Alternatively, the oil industry has developed technology for adding new materials in cement pastes, oil well, providing high ductility and low density in order to withstand the thermo-mechanical loads generated by the injection of water vapor. In this context, vermiculite, a clay mineral found in abundance in Brazil has been applied in its expanded form in the construction industry for the manufacture of lightweight concrete with excellent insulation and noise due to its high melting point and the presence of air in their layers lamellar. Therefore, the vermiculite is used for the purpose of providing low-density cement paste and withstand high temperatures caused by steam injection. Thus, the present study compared the default folder containing cement and water with the folders with 6%, 8% and 10% vermiculite micron conducting tests of free water, rheology and compressive strength where it obtained the concentration of 8 % with the best results. Subsequently, the selected concentration, was compared with the results recommended by the API standard tests of filtered and stability. And finally, analyzed the results from tests of specific gravity and time of thickening. Before the study we were able to make a folder with a low density that can be used in cementing oil well in order to withstand the thermo-mechanical loads generated by steam injection

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this dissertation is whether the demand for manpower trained in technical school for the sector of Oil and Gas (O&G) is in balance with the offer of that training in the Brazilian education system. The methodology used to obtain such information was based on School Census 2000 and 2008 where data were worked out in order to clarify the numbers of enrollments in secondary technical level demanded by the sector of O&G. The demand for manpower with that qualification as a data source was the 2010-2014 Business Plan Program for Mobilization of the National Oil and Natural Gas (PROMINP). This Program identified the future demand for manpower for the Sector of the O&G until 2014 where the occupational categories are mapped prerequisite training and experience. In order to better understand the object of this study was dome a review of the literature with regard to technical education in Brazil but also the importance of the education to economic growth and the peculiarities of the oil economy in different countries possessors of those mines, or that is, developed and underdeveloped countries. Analysis showed that enrollment in technical education in Brazil had a significant increase between the dates 2000 and 2008. It also don´t bring balance with the characteristic of the dynamics of the productive sectors of the economy mainly due to heating of the economy before the global growth especially in the Construction Industry as well as in the Oil and Natural Gas Engineering and a Naval account of the discovery of oil in the Pre-Salt. Another important aspect is that one of the major problems of qualification of manpower in Brazil is due to a bad quality of the student´s school and high school which makes difficult a good performance in office work and also this ability to learn new functions. The rapprochement between the supply of the education system and the demand for manpower with training mid-level technical support for the sector O&G showed that most technical courses demanded or had no enrollment in 2008, had few enrollment in 15 states with demand expect to occur and those enrollment were unevenly distributed among states. The analysis therefore signalize the needed of a public policy that enables the adequacy of the education system (Secondary Technical Education) to Sector of O&G in terms of enrollment and its distribution between the oil producing states and in relation to technical expertise offered

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry is responsible for generating a lot of waste because of their activities. Consequently, it is noticeable the occurrence of environmental problems in terms of its disposal in inappropriate places. Faced with this problem, some studies have been conducted with the aim of developing technologies and alternatives for recycling construction and demolition waste (CDW), motivated by the scarcity of natural resources and reduction of environmental problems generated. The research aims to characterize the recycled aggregates derived from construction and demolition waste (CDW) produced in the Greater Natal-RN and analyze the performance of mortar coating produced with recycled aggregates. The study includes the chemical , physical and microstructural characterization of recycled aggregates , as well as conducting microscopic analysis and laboratory tests in the fresh state (consistency index , water retention , bulk density and content of entrained air ) and in the hardened state ( compressive strength , tensile strength in bending , water absorption by immersion and capillary , mass density and void ratio ) for mortars produced from different levels of substitution of aggregates ( 0, 20 %, 40 %, 60 %, 80 % and 100 %). The results were satisfactory, providing mortars produced with recycled aggregates, smaller mass density and dynamic modulus values as well as an increase in the rates of absorption and porosity. The tensile strength in bending and compression for TP1 (1:2:8) trait were lower for mortars produced with recycled aggregates and the best result was 20% for replacement. For the TP2 (1:8) mapping, there was an increase in resistance to traction and compression and the best result was for 100% replacement of natural aggregates by recycled. The experiments led to the conclusion that the technical and economic point of view that the mortars produced with recycled aggregates can be used in construction, only if there is an effective control in production processes of recycled aggregate and at the dosage of mortars

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The mortar is a type of adhesive products used in large scale in construction, it is a function of its variety and ease of application . Although industrialized product and endowed with technology in its production is very frequent occurrence of the same pathology , which causes frequent damage and losses in the construction industry. Faced with this real market situation , the technical and scientific study of the effects of the addition of diatomite on the rheological and mechanical behavior of adhesive mortars are needed. This work back as a suggestion the use of diatomite as a mineral additive in formulations of adhesive mortars for partial replacement of cellulose based additives . The choice of using this mineral occurs through physical, chemical and rheological properties that justify its use in this product line , and is a raw material abundant in our region and can thus contribute positively to the minimization of direct costs cellulose -based additives . Industrial adhesive mortar used for comparison , was type AC1 . Formulations of adhesive mortar with diatomite held constant dosed quantities of sand, cement and the water / cement (w / c ) , or adhesive mortar formulations were developed with levels 10, 20, 30 and 40% of diatomite substituting part of the cellulose -based additives . These mortars were subjected to the following tests that define and evaluate the rheological and mechanical behavior of this type of mortar. The results attest the best performance of the adhesive mortar type AC1 with partial replacement of 30 % of the cellulose-based additive for diatomite