24 resultados para Colóquio Brasileiro de Matemática (1957 : Poços de Caldas)
em Universidade Federal do Rio Grande do Norte(UFRN)
Resumo:
Water injection in oil reservoirs is a recovery technique widely used for oil recovery. However, the injected water contains suspended particles that can be trapped, causing formation damage and injectivity decline. In such cases, it is necessary to stimulate the damaged formation looking forward to restore the injectivity of the injection wells. Injectivity decline causes a major negative impact to the economy of oil production, which is why, it is important to foresee the injectivity behavior for a good waterflooding management project. Mathematical models for injectivity losses allow studying the effect of the injected water quality, also the well and formation characteristics. Therefore, a mathematical model of injectivity losses for perforated injection wells was developed. The scientific novelty of this work relates to the modeling and prediction of injectivity decline in perforated injection wells, considering deep filtration and the formation of external cake in spheroidal perforations. The classic modeling for deep filtration was rewritten using spheroidal coordinates. The solution to the concentration of suspended particles was obtained analytically and the concentration of the retained particles, which cause formation damage, was solved numerically. The acquisition of the solution to impedance assumed a constant injection rate and the modified Darcy´s Law, defined as being the inverse of the normalized injectivity by the inverse of the initial injectivity. Finally, classic linear flow injectivity tests were performed within Berea sandstone samples, and within perforated samples. The parameters of the model, filtration and formation damage coefficients, obtained from the data, were used to verify the proposed modeling. The simulations showed a good fit to the experimental data, it was observed that the ratio between the particle size and pore has a large influence on the behavior of injectivity decline.
Resumo:
LINS, Filipe C. A. et al. Modelagem dinâmica e simulação computacional de poços de petróleo verticais e direcionais com elevação por bombeio mecânico. In: CONGRESSO BRASILEIRO DE PESQUISA E DESENVOLVIMENTO EM PETRÓLEO E GÁS, 5. 2009, Fortaleza, CE. Anais... Fortaleza: CBPDPetro, 2009.
Resumo:
Cementation operation consists in an extremely important work for the phases of perforation and completion of oil wells, causing a great impact on the well productivity. Several problems can occur with the cement during the primary cementation, as well as throughout the productive period. The corrective operations are frequent, but they are expensive and demands production time. Besides the direct cost, prejudices from the interruption of oil and gas production till the implementation of a corrective operation must be also taken into account. The purpose of this work is the development of an alternative cement paste constituted of Portland cement and porcelainized stoneware residue produced by ceramic industry in order to achieve characteristics as low permeability, high tenacity, and high mechanical resistance, capable of supporting various operations as production or oil wells recuperation. Four different concentration measures of hydrated paste were evaluated: a reference paste, and three additional ones with ceramic residue in concentrations of the order of 10%, 20% and 30% in relation to cement dough. High resistance and low permeability were found in high concentration of residues, as well as it was proved the pozolanic reactivity of the residue in relation to Portland cement, which was characterized through x-ray and thermogravimetry assays. It was evident the decrease of calcium hydroxide content, once it was substituted by formation of new hydrated products as it was added ceramic residue
Resumo:
Steam injection is the most used thermal recovery method of oil nowadays because of the high degree of development of the technique that allows high recovery factors. However, injection of superheated steam into the reservoir affects the entire structure of the well, including the cemented layer that presents a retrogression of compressive strength and increases the permeability due to formation of more crystalline and denser phases at temperatures above 110 °C. These changes result in failures in the cement that favor the entrance of formation fluids into the annulus space resulting in unsafe operations and restrictions in the economic life of the well. But the strength retrogression can be prevented by partial replacement of cement by silica-based materials that reduce the CaO/SiO2 ratio of cement slurries changing the trajectory of the reactions, converting those deleterious phases in phases with satisfactory mechanical strength and permeability. The aim of this study was to evaluate the behavior of a ceramic waste material rich in silica in partial and total substitution of a mineral additive used to fight the strength retrogression of cement slurries subjected to high temperatures. The evaluation was made by compression, X-ray diffraction (XRD) and thermogravimetry (TG/DTG). The samples were submitted to a cycle of low temperature (38 °C) for 28 days and a cycle of low temperature followed by exposure to 280 ºC and 1000 psi by 3 days. The results showed that slurries with additions of up to 30% of the waste material are not enough to prevent the strength retrogression, while slurries with additions of the waste material combined with silica flour in various proportions produced hydrated products of low Ca/Si ratios that maintained the compressive strength at satisfactory levels
Resumo:
Oil recovery using waterflooding has been until now the worldwide most applied method, specially for light oil recovery, its success is mainly because of the low costs involved and the facilities of the injection process. The Toe- To-Heel Waterflooding TTHWTM method uses a well pattern of vertical injector wells completed at the bottom of the reservoir and horizontal producer wells completed at the top of it. The main producing mechanism is gravitational segregation in short distance. This method has been studied since the early 90´s and it had been applied in Canada with positive results for light heavy oils, nevertheless it hasn´t been used in Brazil yet. In order to verify the applicability of the process in Brazil, a simulation study for light oil was performed using Brazilian northwest reservoirs characteristics. The simulations were fulfilled using the STARS module of the Computer Modelling Group Software, used to perform improved oil recovery studies. The results obtained in this research showed that the TTHWTM well pattern presented a light improvement in terms of recovery factor when compared to the conventional 5- Spot pattern, however, it showed lower results in the economic evaluation
Resumo:
The method "toe-to-heel air injection" (THAITM) is a process of enhanced oil recovery, which is the integration of in-situ combustion with technological advances in drilling horizontal wells. This method uses horizontal wells as producers of oil, keeping vertical injection wells to inject air. This process has not yet been applied in Brazil, making it necessary, evaluation of these new technologies applied to local realities, therefore, this study aimed to perform a parametric study of the combustion process with in-situ oil production in horizontal wells, using a semi synthetic reservoir, with characteristics of the Brazilian Northeast basin. The simulations were performed in a commercial software "STARS" (Steam, Thermal, and Advanced Processes Reservoir Simulator), from CMG (Computer Modelling Group). The following operating parameters were analyzed: air rate, configuration of producer wells and oxygen concentration. A sensitivity study on cumulative oil (Np) was performed with the technique of experimental design, with a mixed model of two and three levels (32x22), a total of 36 runs. Also, it was done a technical economic estimative for each model of fluid. The results showed that injection rate was the most influence parameter on oil recovery, for both studied models, well arrangement depends on fluid model, and oxygen concentration favors recovery oil. The process can be profitable depends on air rate
Resumo:
The progressing cavity pump artificial lift system, PCP, is a main lift system used in oil production industry. As this artificial lift application grows the knowledge of it s dynamics behavior, the application of automatic control and the developing of equipment selection design specialist systems are more useful. This work presents tools for dynamic analysis, control technics and a specialist system for selecting lift equipments for this artificial lift technology. The PCP artificial lift system consists of a progressing cavity pump installed downhole in the production tubing edge. The pump consists of two parts, a stator and a rotor, and is set in motion by the rotation of the rotor transmitted through a rod string installed in the tubing. The surface equipment generates and transmits the rotation to the rod string. First, is presented the developing of a complete mathematical dynamic model of PCP system. This model is simplified for use in several conditions, including steady state for sizing PCP equipments, like pump, rod string and drive head. This model is used to implement a computer simulator able to help in system analysis and to operates as a well with a controller and allows testing and developing of control algorithms. The next developing applies control technics to PCP system to optimize pumping velocity to achieve productivity and durability of downhole components. The mathematical model is linearized to apply conventional control technics including observability and controllability of the system and develop design rules for PI controller. Stability conditions are stated for operation point of the system. A fuzzy rule-based control system are developed from a PI controller using a inference machine based on Mandami operators. The fuzzy logic is applied to develop a specialist system that selects PCP equipments too. The developed technics to simulate and the linearized model was used in an actual well where a control system is installed. This control system consists of a pump intake pressure sensor, an industrial controller and a variable speed drive. The PI control was applied and fuzzy controller was applied to optimize simulated and actual well operation and the results was compared. The simulated and actual open loop response was compared to validate simulation. A case study was accomplished to validate equipment selection specialist system
Resumo:
This document proposes to describe a pilot plant for oil wells equipped with plunger lift. In addition to a small size (21,5 meters) and be on the surface, the plant s well has part of its structure in transparent acrylic, allowing easy visualization of phenomena inherent to the method. The rock formation where the well draws its pilot plant fluids (water and air) is simulated by a machine room where they are located the compressor and water pump for the production of air and water. To keep the flow of air and water with known and controlled values the lines that connect the machine room to the wellhole are equipped with flow sensors and valves. It s developed a supervisory system that allows the user a real-time monitoring of pressures and flow rates involved. From the supervisor is still allowed the user can choose how they will be controlled cycles of the process, whether by time, pressure or manually, and set the values of air flow to the water used in cycles. These values can be defined from a set point or from the percentage of valve opening. Results from tests performed on the plant using the most common forms of control by time and pressure in the coating are showed. Finally, they are confronted with results generated by a simulator configured with the the pilot plant s feature
Resumo:
In vivo production of viral biopesticides is the major source of viral insecticides currently in the marketplace. However, this system presents limitations during production scale-up. For the Spodoptera frugiperda nucleopolyhedrovirus (SfMNPV), the insect used for replication has cannibalistic characteristics, thus production is even more difficult. Insect cells are commonly used for in vitro baculovirus production. Most of these cell lines are derived from Lepidoptera species. The Sf21 cell line is derived from Spodoptera frugiperda caterpillar ovarian tissue, and its clonal isolate Sf9 has been used for biopesticide production due to its ease of growth in suspension cultures. In this work, the in vitro production capabilities of a Brazilian SfMNPV isolate obtained from cornfields was evaluated. Comparison of polyhedra production was carried out using both Sf21 and Sf9 cells, based on volumetric and specific yields. Both cell lines were cultivated in Hyclone medium supplemented with different fetal bovine serum concentrations (2,5 and 5%). The best results were obtained using Sf9 cells supplemented with 5% serum. These results were further confirmed quantitively through kinetic parameter estimation for both cells lines and different serum concentrations. After seven successive passages, this system still presented high specific polyhedra production
Resumo:
All around the world, naturally occurring hydrocarbon deposits, consisting of oil and gas contained within rocks called reservoir rocks , generally sandstone or carbonate exists. These deposits are in varying conditions of pressure and depth from a few hundred to several thousand meters. In general, shallow reservoirs have greater tendency to fracture, since they have low fracture gradient, ie fractures are formed even with relatively low hydrostatic columns of fluid. These low fracture gradient areas are particularly common in onshore areas, like the Rio Grande do Norte basin. During a well drilling, one of the most favorable phases for the occurrence of fractures is during cementing, since the cement slurry used can have greater densities than the maximum allowed by the rock structure. Furthermore, in areas which are already naturally fractured, the use of regular cement slurries causes fluid loss into the formation, which may give rise to failures cementations and formation damages. Commercially, there are alternatives to the development of lightweight cement slurries, but these fail either because of their enormous cost, or because the cement properties were not good enough for most general applications, being restricted to each transaction for which the cement paste was made, or both reasons. In this work a statistical design was made to determine the influence of three variables, defined as the calcium chloride concentration, vermiculite concentration and nanosilica concentration in the various properties of the cement. The use of vermiculite, a low density ore present in large amounts in northeastern Brazil, as extensor for cementing slurries, enabled the production of stable cements, with high water/cement ratio, excellent rheological properties and low densities, which were set at 12.5 lb / gal, despite the fact that lower densities could be achieved. It is also seen that the calcium chloride is very useful as gelling and thickening agent, and their use in combination with nanosilica has a great effect on gel strength of the cement. Hydrothermal Stability studies showed that the pastes were stable in these conditions, and mechanical resistance tests showed values of the order of up to 10 MPa
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior
Resumo:
We considered prediction techniques based on models of accelerated failure time with random e ects for correlated survival data. Besides the bayesian approach through empirical Bayes estimator, we also discussed about the use of a classical predictor, the Empirical Best Linear Unbiased Predictor (EBLUP). In order to illustrate the use of these predictors, we considered applications on a real data set coming from the oil industry. More speci - cally, the data set involves the mean time between failure of petroleum-well equipments of the Bacia Potiguar. The goal of this study is to predict the risk/probability of failure in order to help a preventive maintenance program. The results show that both methods are suitable to predict future failures, providing good decisions in relation to employment and economy of resources for preventive maintenance.
Resumo:
The importance of the Professionals Master in the field of science education is revealed by the recognition that they provide, to practicing teachers, in particular, training spaces for reflection and application of knowledge. This work appears in the context of the project "Research and training in teaching science and mathematics: a cutout of academic production in the northeast and overview of formative action in basic education" on the Centre for Education program, which main objective was to conduct studies description, analysis and evaluation of the academic production of Postgraduate Programs in Science Teaching of UFRPE, UFRN and UEPB and investigate the contribution of continuing education in stricto sensu level, of graduated teachers to improve the quality of basic education . We sought to examine a cut of academic production PPGECNM / UFRN, taking as reference dissertations of Natural Sciences, finished between the years 2005 and 2012, which have developed and applied educational products for high school students. More specifically we sought to conduct a general characterization of the dissertations analyzed for basic descriptors, to understand if and how the official documents governing the Brazilian education, especially science education, subsidized development of dissertations and identify current trends for science teaching are addressed and which ones are used in preparing the product of dissertations. The survey was based on documentary analysis, a type of qualitative approach in which the documents are objects of study in themselves. The results revealed that most of the work was developed in public schools, on subjects of physics and chemistry. During analytical reading of the text of the dissertations was observed that, in its construction, most of them addressed somehow, official documents governing the Brazilian educational system, that the products are basically teaching units and teaching approaches that are more focused on Experimentation and History and Philosophy of Science
Resumo:
Subsurface stratigraphic analysis of Devonian strata from the Rio do Peixe Basin, newly recognized by palynological studies, has resulted in the identification of two new lithostratigraphic units assembled in the Santa Helena Group. The Pilões Formation, the lower unit, is composed mainly of dark mudstones and medium-tovery fine-grained sandstones, with minor conglomerates and breccias. The Triunfo Formation, the upper unit, comprises whitish grey, kaolinitic, coarse-grained to conglomeratic, cross stratified sandstones and conglomerates, with interbedded mudstones and fine-grained sandstones. These units were characterized using cores, sidewall and cuttings samples, conventional logs and image log, from three wells drilled by PETROBRAS, and 3D seismic data. The Pilões Formation is interpreted as prodeltaic facies, with lesser associated subaqueous talus, debrite and sandy turbidite lobe facies, distal part of fandelta and braided fluviodeltaic facies of Triunfo Formation. The Santa Helena Group corresponds to the Lower Devonian tectono-sequence deposited in a NW-SE-trending graben during a transgressiveregressive cycle. With 343 meters of thickness (isochore) in well 1-PIL-1-PB (Pilões 1), this sequence has a non-conformity at the lower boundary and its upper boundary is an unconformity with the Lower Cretaceous tectono-sequence (Rio do Peixe Group), that represents a hiatus of about 265 million years. Ignimbrites and coignimbrite breccias (Poço da Jurema volcanic breccia), related to an unknown pyroclastic volcanic event, were recognized at the northern margin of the Sousa halfgraben. Evidence from well data suggests that this event is coeval with the Devonian graben filling. The present study indicates a polyhistorical tectono-volcanosedimentary evolution of the basin. This lithostratigraphic update brings new perspectives for geological research in the Rio do Peixe Basin, as well as in other inland basins of the Northeastern of Brazil. The results of the research also contribute to the kwnoledge of the Borborema Province and western Gondwana paleogeography during the Early Devonian.
Resumo:
The success achieved by thermal methods of recovery, in heavy oils, prompted the emergence of studies on the use of electromagnetic waves as heat generating sources in oil reservoirs. Thus, this generation is achieved by three types of different processes according to the frequency range used. They are: the electromagnetic induction heating, the resistive and the dielectric, also known as radiation. This study was based on computer simulations in oil reservoirs with characteristics similar to those found in the sedimentary basins of the Brazilian Northeast. All cases studied were simulated using the software STARS, CMG (Computer Group, version 2012.10 Modeling). Some simulations took into account the inclusion of electrically sensitive particles in certain sectors of the reservoir model studied by fracturing. The purpose of this work is the use of the electromagnetic induction heating as a recovery method of heavy oil, to check the influence of these aforementioned particles on the reservoir model used. Comparative analyses were made involving electromagnetic induction heating, the operation of hydraulic fracturing and the injection of water to the different situations of the reservoir model studied. It was found that fracturing the injection well in order that the electromagnetic heating occurs in the same well where there is water injection, there was a considerable increase in the recovery factor and in the cumulative oil production in relation to the models in which hydraulic fracturing occurred in the production well and water injection in the injection well. This is due to the generation of steam in situ in the reservoir.