2 resultados para COMPUTER ENGINEERING

em Universidade Federal do Rio Grande do Norte(UFRN)


Relevância:

60.00% 60.00%

Publicador:

Resumo:

During a petroleum well production process, It is common the slmultaneous oil and water production, in proportion that can vary from 0% up to values close to 100% of water. Moreover, the production flows can vary a lot, depending on the charaeteristies of eaeh reservoir. Thus being, the meters used in field for the flow and BSW (water in the oil) measurement must work well in wide bands of operation. For the evaluation of the operation of these meters, in the different operation conditions, a Laboratory will be built in UFRN, that has for objective to evaluate in an automatic way the processes of flow and BSW petroleum measurement, considering different operation conditions. The good acting of these meters is fundamental for the accuracy of the measures of the volumes of production liquid and rude of petroleum. For the measurement of this production, the petroleum companies use meters that should indicate the values with tha largast possible accuracy and to respect a series of conditions and minimum requirements, estabelished by the united Entrance ANP/INMETRO 19106/2000. The laboratory of Evafuation of the Processes of Measurement of Flow and BSW to be built will possess an oil tank basically, a tank of water, besides a mixer, a tank auditor, a tank for separation and a tank of residues for discard of fluids, fundamental for the evaluation of the flow metars and BSW. The whole process will be automated through the use of a Programmable Logicat Controller (CLP) and of a supervisory system.This laboratory besides allowing the evaluation of flow meters and BSW used by petroleum companies, it will make possible the development of researches related to the automation. Besides, it will be a collaborating element to the development of the Computer Engineering and Automation Department, that it will propitiate the evolution of the faculty and discente, qualifying them for a job market in continuous growth. The present work describes the project of automation of the laboratory that will be built at of UFRN. The system will be automated using a Programmable Logical Controller and a supervisory system. The programming of PLC and the screens of the supervisory system were developed in this work

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Every day, water scarcity becomes a more serious problem and, directly affects global society. Studies are directed in order to raise awareness of the rational use of this natural asset that is essential to our survival. Only 0.007% of the water available in the world have easy access and can be consumed by humans, it can be found in rivers, lakes, etc... To better take advantage of the water used in homes and small businesses, reuse projects are often implemented, resulting in savings for customers of water utilities. The reuse projects involve several areas of engineering, like Environmental, Chemical, Electrical and Computer Engineering. The last two are responsible for the control of the process, which aims to make gray water (soapy water), and clear blue water (rain water), ideal for consumption, or for use in watering gardens, flushing, among others applications. Water has several features that should be taken into consideration when it comes to working its reuse. Some of the features are, turbidity, temperature, electrical conductivity and, pH. In this document there is a proposal to control the pH (potential Hydrogen) through a microcontroller, using the fuzzy logic as strategy of control. The controller was developed in the fuzzy toolbox of Matlab®