3 resultados para Building projects
em Universidade Federal do Rio Grande do Norte(UFRN)
Resumo:
This paper examines, through case studies, the organization of the production process of architectural projects in architecture offices in the city of Natal, specifically in relation to building projects. The specifics of the design process in architecture, the production of the project in a professional field in Natal, are studied in light of theories of design and its production process. The survey, in its different phases, was conducted between March 2010 and September 2012 and aimed to identify, understand, and analyze comparatively, by mapping the design process, the organization of production of building projects in two offices in Natal, checking as well the relationships of their agents during the process. The project was based on desk research and exploration, adopting, for both, data collection tools such as forms, questionnaires, and interviews. With the specific aim of mapping the design process, we adopted a technique that allows obtaining the information directly from employee agents involved in the production process. The technique consisted of registering information by completing daily, during or at the end of the workday, an individual virtual agenda, in which all agent collaborators described the tasks performed. The data collected allowed for the identification of the organizational structure of the office, its hierarchy, the responsibilities of agents, as well as the tasks performed by them during the two months of monitoring at each office. The research findings were based on analyses of data collected in the two offices and on comparative studies between the results of these analyses. The end result was a diagnostic evaluation that considered the level of organization and elaborated this perspective, as well as proposed solutions aimed at improving both the organization of the process and the relationships between the agents under the lens analyzed
Resumo:
The process of urbanization in recent decades has generated considerable seriousness of problems relating to the use and occupation physical environment of cities. The concentration of population, economic activities and technological standards have reinforced an existing urban environment highly degraded as a consequence of the development style that leads to the predatory use of natural resources. In this context, cities as centers of production and consumption, have the most serious problems of environmental degradation. This study investigated the impacts of the municipal building projects to large-scale vertical in the town of Vila de Ponta Negra, Natal-RN, given the proximity to the Environmental Protection Area (ZPA-6) and considering its environmental importance , scenic, landscape and tourism for the city of Natal-RN. The fragility of the licensing process and the failure of the assumptions in the analysis, objective and subjective, for the granting of environmental permits for the building construction projects, specifically those set out in the surroundings of the Environmental Protection Area (ZPA-6) and fundamental importance of landscape and tourism for the city of Natal, has aroused the concern of local people in and of itself the Government, faced with the probable impacts that will affect greatly the Vila de Ponta Negra. The methodology used to achieve the intended objectives will be the literature review, questionnaire to the surrounding population and the Government, as well as findings on the spot, through the photographic record. The beneficiaries of the license, if the entrepreneurs, have been affected because of the granting of licensing act of investing large amount of capital in the works. Additionally, with distrust of the population, since they are to discredit the public system of environmental management have guessed by the probability of imbalance to the environment and structural damage to the Vila de Ponta Negra, where such failure to support energy, lack of regular supply of water , lack of sanitation and access roads sufficient for the flow of motor vehicles in these areas, among other factors. Thus, this work will contribute to the diagnosis and solutions to the problem in question, so that the Government will effectively fulfill its social management of ecologically balanced environment of continuing urban development in Natal, Brazil
Resumo:
This paper examines, through case studies, the organization of the production process of architectural projects in architecture offices in the city of Natal, specifically in relation to building projects. The specifics of the design process in architecture, the production of the project in a professional field in Natal, are studied in light of theories of design and its production process. The survey, in its different phases, was conducted between March 2010 and September 2012 and aimed to identify, understand, and analyze comparatively, by mapping the design process, the organization of production of building projects in two offices in Natal, checking as well the relationships of their agents during the process. The project was based on desk research and exploration, adopting, for both, data collection tools such as forms, questionnaires, and interviews. With the specific aim of mapping the design process, we adopted a technique that allows obtaining the information directly from employee agents involved in the production process. The technique consisted of registering information by completing daily, during or at the end of the workday, an individual virtual agenda, in which all agent collaborators described the tasks performed. The data collected allowed for the identification of the organizational structure of the office, its hierarchy, the responsibilities of agents, as well as the tasks performed by them during the two months of monitoring at each office. The research findings were based on analyses of data collected in the two offices and on comparative studies between the results of these analyses. The end result was a diagnostic evaluation that considered the level of organization and elaborated this perspective, as well as proposed solutions aimed at improving both the organization of the process and the relationships between the agents under the lens analyzed