4 resultados para Amostragem por conglomerado
em Universidade Federal do Rio Grande do Norte(UFRN)
Resumo:
Crítica descentrada para o senso comum: MUNIZ, Euzébia Maria de Pontes Targino; DANTAS, Juliana Bulhões Alberto; ALBANO, Sebastião Guilherme (Orgs). Amostragem da reflexão acerca da comunicação contemporânea realizada na Universidade Federal do Rio Grande do Norte. Natal, RN: EDUFRN, 2012.
Resumo:
The aim of this study is to quantify the presence of major and minor elements in the sediments of estuary Potengi. Four georeferenced sampling points were used in the study, at which sediment samples were collected in the channel of the river and on the right and left banks. In addition, dissolved oxygen, salinity and water conductivity were taken in situ at the time of sample collection. The percentage of organic matter, determined by gravimetry, and granulometric analysis of the sediment samples were conducted in the laboratory. To quantify the major and minor elements a prior test to open the sample was conducted with standard NIST 1646ª estuarine sediment to choose the best methodology to be adopted. The sediment samples were dissolved in microwaves with nitric acid and chloridric acid, according to methodology proposed by US EPA 3051ª. Quantitative analyses of the elements Al, Fe, Cd, Cr, Cu, Mn, Ni, Pb and Zn were conducted by inductively coupled plasma optical emission spectrometry (ICPOES). The results showed that the partial concentrations of the elements analyzed are below average worldwide shale levels, the standard described by Turekian and Wedepohl (1961)
Resumo:
This paper proposes a new control chart to monitor a process mean employing a combined npx-X control chart. Basically the procedure consists of splitting the sample of size n into two sub-samples n1 and n2 determined by an optimization search. The sampling occur in two-stages. In the first stage the units of the sub-sample n1 are evaluated by attributes and plotted in npx control chart. If this chart signs then units of second sub-sample are measured and the monitored statistic plotted in X control chart (second stage). If both control charts sign then the process is stopped for adjustment. The possibility of non-inspection in all n items may promote a reduction not only in the cost but also the time spent to examine the sampled items. Performances of the current proposal, individual X and npx control charts are compared. In this study the proposed procedure presents many competitive options for the X control chart for a sample size n and a shift from the target mean. The average time to sign (ATS) of the current proposal lower than the values calculated from an individual X control chart points out that the combined control chart is an efficient tool in monitoring process mean.
Resumo:
Crítica descentrada para o senso comum: MUNIZ, Euzébia Maria de Pontes Targino; DANTAS, Juliana Bulhões Alberto; ALBANO, Sebastião Guilherme (Orgs). Amostragem da reflexão acerca da comunicação contemporânea realizada na Universidade Federal do Rio Grande do Norte. Natal, RN: EDUFRN, 2012.