324 resultados para Cimentação de poços


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This master´s thesis presents a reliability study conducted among onshore oil fields in the Potiguar Basin (RN/CE) of Petrobras company, Brazil. The main study objective was to build a regression model to predict the risk of failures that impede production wells to function properly using the information of explanatory variables related to wells such as the elevation method, the amount of water produced in the well (BSW), the ratio gas-oil (RGO), the depth of the production bomb, the operational unit of the oil field, among others. The study was based on a retrospective sample of 603 oil columns from all that were functioning between 2000 and 2006. Statistical hypothesis tests under a Weibull regression model fitted to the failure data allowed the selection of some significant predictors in the set considered to explain the first failure time in the wells

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The main goal of this dissertation is to develop a Multi Criteria Decision Aid Model to be used in Oils and Gas perforation rigs contracts choices. The developed model should permit the utilization of multiples criterions, covering problems that exist with models that mainly use the price of the contracts as its decision criterion. The AHP has been chosen because its large utilization, not only academic, but in many other areas, its simplicity of use and flexibility, and also fill all the requirements necessary to complete the task. The development of the model was conducted by interviews and surveys with one specialist in this specific area, who also acts as the main actor on the decision process. The final model consists in six criterions: Costs, mobility, automation, technical support, how fast the service could be concluded and availability to start the operations. Three rigs were chosen as possible solutions for the problem. The results reached by the utilizations of the model suggests that the utilization of AHP as a decision support system in this kind of situation is possible, allowing a simplifications of the problem, and also it s a useful tool to improve every one involved on the process s knowledge about the problem subject, and its possible solutions

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The progressing cavity pump artificial lift system, PCP, is a main lift system used in oil production industry. As this artificial lift application grows the knowledge of it s dynamics behavior, the application of automatic control and the developing of equipment selection design specialist systems are more useful. This work presents tools for dynamic analysis, control technics and a specialist system for selecting lift equipments for this artificial lift technology. The PCP artificial lift system consists of a progressing cavity pump installed downhole in the production tubing edge. The pump consists of two parts, a stator and a rotor, and is set in motion by the rotation of the rotor transmitted through a rod string installed in the tubing. The surface equipment generates and transmits the rotation to the rod string. First, is presented the developing of a complete mathematical dynamic model of PCP system. This model is simplified for use in several conditions, including steady state for sizing PCP equipments, like pump, rod string and drive head. This model is used to implement a computer simulator able to help in system analysis and to operates as a well with a controller and allows testing and developing of control algorithms. The next developing applies control technics to PCP system to optimize pumping velocity to achieve productivity and durability of downhole components. The mathematical model is linearized to apply conventional control technics including observability and controllability of the system and develop design rules for PI controller. Stability conditions are stated for operation point of the system. A fuzzy rule-based control system are developed from a PI controller using a inference machine based on Mandami operators. The fuzzy logic is applied to develop a specialist system that selects PCP equipments too. The developed technics to simulate and the linearized model was used in an actual well where a control system is installed. This control system consists of a pump intake pressure sensor, an industrial controller and a variable speed drive. The PI control was applied and fuzzy controller was applied to optimize simulated and actual well operation and the results was compared. The simulated and actual open loop response was compared to validate simulation. A case study was accomplished to validate equipment selection specialist system

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This work intends to analyze the behavior of the gas flow of plunger lift wells producing to well testing separators in offshore production platforms to aim a technical procedure to estimate the gas flow during the slug production period. The motivation for this work appeared from the expectation of some wells equipped with plunger lift method by PETROBRAS in Ubarana sea field located at Rio Grande do Norte State coast where the produced fluids measurement is made in well testing separators at the platform. The oil artificial lift method called plunger lift is used when the available energy of the reservoir is not high enough to overcome all the necessary load losses to lift the oil from the bottom of the well to the surface continuously. This method consists, basically, in one free piston acting as a mechanical interface between the formation gas and the produced liquids, greatly increasing the well s lifting efficiency. A pneumatic control valve is mounted at the flow line to control the cycles. When this valve opens, the plunger starts to move from the bottom to the surface of the well lifting all the oil and gas that are above it until to reach the well test separator where the fluids are measured. The well test separator is used to measure all the volumes produced by the well during a certain period of time called production test. In most cases, the separators are designed to measure stabilized flow, in other words, reasonably constant flow by the use of level and pressure electronic controllers (PLC) and by assumption of a steady pressure inside the separator. With plunger lift wells the liquid and gas flow at the surface are cyclical and unstable what causes the appearance of slugs inside the separator, mainly in the gas phase, because introduce significant errors in the measurement system (e.g.: overrange error). The flow gas analysis proposed in this work is based on two mathematical models used together: i) a plunger lift well model proposed by Baruzzi [1] with later modifications made by Bolonhini [2] to built a plunger lift simulator; ii) a two-phase separator model (gas + liquid) based from a three-phase separator model (gas + oil + water) proposed by Nunes [3]. Based on the models above and with field data collected from the well test separator of PUB-02 platform (Ubarana sea field) it was possible to demonstrate that the output gas flow of the separator can be estimate, with a reasonable precision, from the control signal of the Pressure Control Valve (PCV). Several models of the System Identification Toolbox from MATLAB® were analyzed to evaluate which one better fit to the data collected from the field. For validation of the models, it was used the AIC criterion, as well as a variant of the cross validation criterion. The ARX model performance was the best one to fit to the data and, this way, we decided to evaluate a recursive algorithm (RARX) also with real time data. The results were quite promising that indicating the viability to estimate the output gas flow rate from a plunger lift well producing to a well test separator, with the built-in information of the control signal to the PCV

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The greater part of monitoring onshore Oil and Gas environment currently are based on wireless solutions. However, these solutions have a technological configuration that are out-of-date, mainly because analog radios and inefficient communication topologies are used. On the other hand, solutions based in digital radios can provide more efficient solutions related to energy consumption, security and fault tolerance. Thus, this paper evaluated if the Wireless Sensor Network, communication technology based on digital radios, are adequate to monitoring Oil and Gas onshore wells. Percent of packets transmitted with successful, energy consumption, communication delay and routing techniques applied to a mesh topology will be used as metrics to validate the proposal in the different routing techniques through network simulation tool NS-2

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Wireless sensors and actuators Networks specified by IEEE 802.15.4, are becoming increasingly being applied to instrumentation, as in instrumentation of oil wells with completion Plunger Lift type. Due to specific characteristics of the environment being installed, it s find the risk of compromising network security, and presenting several attack scenarios and the potential damage from them. It`s found the need for a more detailed security study of these networks, which calls for use of encryption algorithms, like AES-128 bits and RC6. So then it was implement the algorithms RC6 and AES-128, in an 8 bits microcontroller, and study its performance characteristics, critical for embedded applications. From these results it was developed a Hybrid Algorithm Cryptographic, ACH, which showed intermediate characteristics between the AES and RC6, more appropriate for use in applications with limitations of power consumption and memory. Also was present a comparative study of quality of security among the three algorithms, proving ACH cryptographic capability.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document proposes to describe a pilot plant for oil wells equipped with plunger lift. In addition to a small size (21,5 meters) and be on the surface, the plant s well has part of its structure in transparent acrylic, allowing easy visualization of phenomena inherent to the method. The rock formation where the well draws its pilot plant fluids (water and air) is simulated by a machine room where they are located the compressor and water pump for the production of air and water. To keep the flow of air and water with known and controlled values the lines that connect the machine room to the wellhole are equipped with flow sensors and valves. It s developed a supervisory system that allows the user a real-time monitoring of pressures and flow rates involved. From the supervisor is still allowed the user can choose how they will be controlled cycles of the process, whether by time, pressure or manually, and set the values of air flow to the water used in cycles. These values can be defined from a set point or from the percentage of valve opening. Results from tests performed on the plant using the most common forms of control by time and pressure in the coating are showed. Finally, they are confronted with results generated by a simulator configured with the the pilot plant s feature

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Amongst the results of the AutPoc Project - Automation of Wells, established between UFRN and Petrobras with the support of the CNPq, FINEP, CTPETRO, FUNPEC, was developed a simulator for equipped wells of oil with the method of rise for continuous gas-lift. The gas-lift is a method of rise sufficiently used in production offshore (sea production), and its basic concept is to inject gas in the deep one of the producing well of oil transform it less dense in order to facilitate its displacement since the reservoir until the surface. Based in the use of tables and equations that condense the biggest number of information on characteristics of the reservoir, the well and the valves of gas injection, it is allowed, through successive interpolations, to simulate representative curves of the physical behavior of the existing characteristic variable. With a simulator that approaches a computer of real the physical conditions of an oil well is possible to analyze peculiar behaviors with very bigger speeds, since the constants of time of the system in question well are raised e, moreover, to optimize costs with assays in field. The simulator presents great versatility, with prominance the analysis of the influence of parameters, as the static pressure, relation gas-liquid, pressure in the head of the well, BSW (Relation Basic Sediments and Water) in curves of request in deep of the well and the attainment of the curve of performance of the well where it can be simulated rules of control and otimization. In moving the rules of control, the simulator allows the use in two ways of simulation: the application of the control saw software simulated enclosed in the proper simulator, as well as the use of external controllers. This implies that the simulator can be used as tool of validation of control algorithms. Through the potentialities above cited, of course one another powerful application for the simulator appears: the didactic use of the tool. It will be possible to use it in formation courses and recycling of engineers

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This work proposes a computer simulator for sucker rod pumped vertical wells. The simulator is able to represent the dynamic behavior of the systems and the computation of several important parameters, allowing the easy visualization of several pertinent phenomena. The use of the simulator allows the execution of several tests at lower costs and shorter times, than real wells experiments. The simulation uses a model based on the dynamic behavior of the rod string. This dynamic model is represented by a second order partial differencial equation. Through this model, several common field situations can be verified. Moreover, the simulation includes 3D animations, facilitating the physical understanding of the process, due to a better visual interpretation of the phenomena. Another important characteristic is the emulation of the main sensors used in sucker rod pumping automation. The emulation of the sensors is implemented through a microcontrolled interface between the simulator and the industrial controllers. By means of this interface, the controllers interpret the simulator as a real well. A "fault module" was included in the simulator. This module incorporates the six more important faults found in sucker rod pumping. Therefore, the analysis and verification of these problems through the simulator, allows the user to identify such situations that otherwise could be observed only in the field. The simulation of these faults receives a different treatment due to the different boundary conditions imposed to the numeric solution of the problem. Possible applications of the simulator are: the design and analysis of wells, training of technicians and engineers, execution of tests in controllers and supervisory systems, and validation of control algorithms

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The continuous gas lift method is the main artificial lifting method used in the oil industry for submarine wells, due to its robustness and the large range of flow rate that the well might operate. Nowadays, there is a huge amount of wells producing under this mechanism. This method of elevation has a slow dynamics due to the transients and a correlation between the injected gas rate and the of produced oil rate. Electronics controllers have been used to adjust many parameters of the oil wells and also to improve the efficiency of the gas lift injection system. This paper presents a intelligent control system applied to continuous gas injection in wells, based in production s rules, that has the target of keeping the wells producing during the maximum period of time, in its best operational condition, and doing automatically all necessary adjustments when occurs some disturbance in the system. The author also describes the application of the intelligent control system as a tool to control the flow pressure in the botton of the well (Pwf). In this case, the control system actuates in the surface control valve

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Peng was the first to work with the Technical DFA (Detrended Fluctuation Analysis), a tool capable of detecting auto-long-range correlation in time series with non-stationary. In this study, the technique of DFA is used to obtain the Hurst exponent (H) profile of the electric neutron porosity of the 52 oil wells in Namorado Field, located in the Campos Basin -Brazil. The purpose is to know if the Hurst exponent can be used to characterize spatial distribution of wells. Thus, we verify that the wells that have close values of H are spatially close together. In this work we used the method of hierarchical clustering and non-hierarchical clustering method (the k-mean method). Then compare the two methods to see which of the two provides the best result. From this, was the parameter � (index neighborhood) which checks whether a data set generated by the k- average method, or at random, so in fact spatial patterns. High values of � indicate that the data are aggregated, while low values of � indicate that the data are scattered (no spatial correlation). Using the Monte Carlo method showed that combined data show a random distribution of � below the empirical value. So the empirical evidence of H obtained from 52 wells are grouped geographically. By passing the data of standard curves with the results obtained by the k-mean, confirming that it is effective to correlate well in spatial distribution

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We considered prediction techniques based on models of accelerated failure time with random e ects for correlated survival data. Besides the bayesian approach through empirical Bayes estimator, we also discussed about the use of a classical predictor, the Empirical Best Linear Unbiased Predictor (EBLUP). In order to illustrate the use of these predictors, we considered applications on a real data set coming from the oil industry. More speci - cally, the data set involves the mean time between failure of petroleum-well equipments of the Bacia Potiguar. The goal of this study is to predict the risk/probability of failure in order to help a preventive maintenance program. The results show that both methods are suitable to predict future failures, providing good decisions in relation to employment and economy of resources for preventive maintenance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Nowadays, there are many aspect-oriented middleware implementations that take advantage of the modularity provided by the aspect oriented paradigm. Although the works always present an assessment of the middleware according to some quality attribute, there is not a specific set of metrics to assess them in a comprehensive way, following various quality attributes. This work aims to propose a suite of metrics for the assessment of aspect-oriented middleware systems at different development stages: design, refactoring, implementation and runtime. The work presents the metrics and how they are applied at each development stage. The suite is composed of metrics associated to static properties (modularity, maintainability, reusability, exibility, complexity, stability, and size) and dynamic properties (performance and memory consumption). Such metrics are based on existing assessment approaches of object-oriented and aspect-oriented systems. The proposed metrics are used in the context of OiL (Orb in Lua), a middleware based on CORBA and implemented in Lua, and AO-OiL, the refactoring of OIL that follows a reference architecture for aspect-oriented middleware systems. The case study performed in OiL and AO-OiL is a system for monitoring of oil wells. This work also presents the CoMeTA-Lua tool to automate the collection of coupling and size metrics in Lua source code

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Reservoirs that present highly viscous oils require methods to aid in their recovery to the surface. The elev ated oil viscosity hinders its flow through porous media and conventional recovery methods have not obtained significant efficiency. As such, the injection of steam into the reservoir through an injection well has been the most widely used method of therma l recovery, for it allows elevated volumes of recovery due to the viscosity reduction of the oil, facilitating the oil’s mobility within the rock formation and consequently into the production well where it will be exploited. On the other hand, the injecti on of vapor not only affects the fluids found in the rock pores, but the entire structure that composes the well where it is injected due to the high temperatures used in the process. This temperature increment is conducted to the cement, found in the annu lus, responsible for the isolation of the well and the well casing. Temperatures above 110 ̊C create new fazes rich in calcium in the cement matrix, resulting in the reduction of its permeability and the consequential phenomenon of mechanical resistance ret rogression. These alterations generate faults in the cement, reducing the well’s hydraulic isolation, creating insecurity in the operations in which the well will be submitted as well as the reduction of its economic life span. As a way of reducing this re trograde effect, this study has the objective of evaluating the incorporation of rice husk ash as a mineral additive substitute of silica flour , commercially utilized as a source of silica to reduce the CaO/SiO 2 ratio in the cement pastes submitted to high temperatures in thermal recovery. Cement pastes were formulated containing 20 and 30% levels of ash, apart from the basic paste (water + cement) and a reference paste (water + cement + 40% silica flour) for comparison purposes. The tests were executed th rough compression resistance tests, X - Ray diffraction (XRD) techniques, thermogravimetry (TG), scanning electron microscopy (SEM) and chemical anal ysis BY X - ray fluorescence (EDS) on the pastes submitted to cure at low temperatures (45 ̊C) for 28 days following a cure at 280 ̊C and a pressure of 2,000 PSI for 3 days, simulating vapor injection. The results obtained show that the paste containing 30% r ice shell ash is satisfactory, obtaining mechanical resistance desired and equivalent to that of the paste containing 40% silica flour, since the products obtained were hydrated with low CaO/SiO 2 ratio, like the Tobermorita and Xonotlita fases, proving its applicability in well subject to vapor injection.