32 resultados para Número esperado de clientes
Resumo:
In production lines, the entire process is bound to unexpected happenings which may cost losing the production quality. Thus, it means losses to the manufacturer. Identify such causes and remove them is the task of the processing management. The on-line control system consists of periodic inspection of every month produced item. Once any of those items is quali ed as not t, it is admitted that a change in the fraction of the items occurred, and then the process is stopped for adjustments. This work is an extension of Quinino & Ho (2010) and has as objective main to make the monitoramento in a process through the control on-line of quality for the number of non-conformities about the inspected item. The strategy of decision to verify if the process is under control, is directly associated to the limits of the graphic control of non-conformities of the process. A policy of preventive adjustments is incorporated in order to enlarge the conforming fraction of the process. With the help of the R software, a sensibility analysis of the proposed model is done showing in which situations it is most interesting to execute the preventive adjustment
Resumo:
This paper proposes a new control chart to monitor a process mean employing a combined npx-X control chart. Basically the procedure consists of splitting the sample of size n into two sub-samples n1 and n2 determined by an optimization search. The sampling occur in two-stages. In the first stage the units of the sub-sample n1 are evaluated by attributes and plotted in npx control chart. If this chart signs then units of second sub-sample are measured and the monitored statistic plotted in X control chart (second stage). If both control charts sign then the process is stopped for adjustment. The possibility of non-inspection in all n items may promote a reduction not only in the cost but also the time spent to examine the sampled items. Performances of the current proposal, individual X and npx control charts are compared. In this study the proposed procedure presents many competitive options for the X control chart for a sample size n and a shift from the target mean. The average time to sign (ATS) of the current proposal lower than the values calculated from an individual X control chart points out that the combined control chart is an efficient tool in monitoring process mean.