301 resultados para Gestão ambiental local
Resumo:
This work presents a study of the ambient management in urban centers, considering the ambient perception as element necessary to develop in the population the conscience of the necessity to preserve the environment. For this, the attitudes and behaviors of the community, represented for students of an Institution had been evaluated, so that strategies and actions are traced that come to minimize the ambient degradation and to provide an aggregate sustainable development to the economic development. The objective of this research consists of studying the problematic one of the ambient management in urban centers under the point of view of the awareness, of the ambient perception and of the participation of the population, this because the ambient questions are inserted in the aspects that involve the practical life and the daily one, for what becomes excellent to understand that the environment is a right of all, therefore, must be preserved. The methodology used in this work constitutes in the application of a questionnaire with scales of the type likert contends variables that compose the acts and mannering aspects, beyond a partner-demographic scale. The Chi-square method was used in the analysis statistics de Pearson to verify the dependence of the associations between the partner-demographic 0 variable and the acts and mannering variables. The results point that the academic environment is opportune to deal with the subject, in view of that the ambient preservation goes for all the contents, and that the pupils of today will be able, in the future, in its areas of performance to plan action to safeguard the sustainable development. One concludes that the strategies to manage the environment pass for the awareness of the citizen, therefore when it is educated its attitudes will be more responsible, a time that the ambient concern will be present in its day-by-day. Therefore, the Public Power when planning programs of ambient preservation that comes to promote changes of habits of the population, such as: management of the solid residues generated by the population, recycling, programs of selective collections, ambient education, etc. the local community for the success of its actions will have to be involved
Resumo:
The process of urbanization in recent decades has generated considerable seriousness of problems relating to the use and occupation physical environment of cities. The concentration of population, economic activities and technological standards have reinforced an existing urban environment highly degraded as a consequence of the development style that leads to the predatory use of natural resources. In this context, cities as centers of production and consumption, have the most serious problems of environmental degradation. This study investigated the impacts of the municipal building projects to large-scale vertical in the town of Vila de Ponta Negra, Natal-RN, given the proximity to the Environmental Protection Area (ZPA-6) and considering its environmental importance , scenic, landscape and tourism for the city of Natal-RN. The fragility of the licensing process and the failure of the assumptions in the analysis, objective and subjective, for the granting of environmental permits for the building construction projects, specifically those set out in the surroundings of the Environmental Protection Area (ZPA-6) and fundamental importance of landscape and tourism for the city of Natal, has aroused the concern of local people in and of itself the Government, faced with the probable impacts that will affect greatly the Vila de Ponta Negra. The methodology used to achieve the intended objectives will be the literature review, questionnaire to the surrounding population and the Government, as well as findings on the spot, through the photographic record. The beneficiaries of the license, if the entrepreneurs, have been affected because of the granting of licensing act of investing large amount of capital in the works. Additionally, with distrust of the population, since they are to discredit the public system of environmental management have guessed by the probability of imbalance to the environment and structural damage to the Vila de Ponta Negra, where such failure to support energy, lack of regular supply of water , lack of sanitation and access roads sufficient for the flow of motor vehicles in these areas, among other factors. Thus, this work will contribute to the diagnosis and solutions to the problem in question, so that the Government will effectively fulfill its social management of ecologically balanced environment of continuing urban development in Natal, Brazil
Resumo:
The aim of this work is to investigate the factors which influence people s participation in the enviromental decision, in Parnamirim, Rio Grande do Norte, from the vision of the residents of that area, approaching the Plan of Control/Eradication of the African s Huge Snail (Achatina Fulica),with the jointly work of IBAMA and Municipal Town Hall of Parnamirim .The applied methodology consists of a research (Survey kind) including 395 interviews by people who live in that county, with minimum age of 18, within an universe of 124.690 residents. The choice of the county was due to a detection (made by IBAMA technicians and reported in a Technical Report) -which showed that the dangerous Snail is already spreading in 14 of 17 districts of the county-, as well as the support given by Parnamirim s Town Hall, with the implementation of the Plan Control/Eradication of the African s Huge Snail, widely known as Day C . The research tools used in that research consists of questionnaires with all sorts of questions. The results show us that most of the residents were feeling threatened by the presence of the animal as well as having had a little participation in the fight against the animal. It also shows us that residents believe that organizations (Town Hall, IBAMA and Local Community) involved are able to solve the problem and believe that the amounts which organization are supposed to take 89,4 %, 87,6% and 80,8%, in that order. As we check the results, we notice in 95%, the variety of threaten and frequency reunion and participation level
Resumo:
The objective of the work was to investigate, from the vision of travel agents, the importance of environmental practices as a decision factor in the purchase of a tourist package. For in such a way, it was established as target population, the travel agencies and tourism linked to he Brazilian Association of Travel agencies ABAV, hearing the Brazilian travel agents that exerted the function in Natal, city in 2005. The election of the sample was accomplished using the simple random sampling technique. The amount of agents effectively searched was of 150 agents being distributed 150 questionnaires, with closed and opened questions, applied during the month of November in 2005. Results showed great variability of interviewed answers in that if it relates for sale of package tourist where the customer demonstrates enviromental concern with the environmental quality. Through multiple regression analyses, it was environmental concern with the environmental quality of the place and the perception of the practical importance of the existence environmental practices in the place as important factor in the decision of tourist package purchase
Resumo:
The present study inserts on the international environmental thematic, approaching the integrated management of solid waste and the participation of the social actors in the search of the sustainable development. The awareness in combining it still describes a Selective Collection Program SCP of solid waste, in partnership with the municipal public power, in the development of joint actions that result in better alternatives of waste management in the urban centers, providing better life quality for the population and conservation of the environment. The aim of this research is to study problematic of the management of solid waste under the point of view of the environmental awareness and the participation of the population in a city of Brazil. In this matter, the target of the work is focusing on the strategy of solid waste management, through the attitudes and the respondents behaviors to aid in the making decision of the public manager related to the implantation of a selective collection program in Natal/RN. The methodology used in this work constitutes in the application of a questionnaire with scales of the type Likert being constituted of variables that compose the aspects of attitudes and of behaviors, besides a social-demographic scale. For analysis statistics is used the Pearson s Chi-Square Method in order to verify the dependence of the associations between the social-demographic variables and the attitude and the behavior ones. The results appear for a larger participation in a SCP, since this provides a better quality of life of the population (28,3 %), followed for offering a financial advantage (27,3%). Other results indicate the existence of the variables that exercise influence on the environmental awareness of the population to its demographic aspects
Resumo:
The aim of this study is to investigate the eco-environmental vulnerability, its changes, and its causes to develop a management system for application of eco-environmental vulnerability and risk assessment in the Apodi-Mossory estuary, Northeast Brazil. This analysis is focused on the interference of the landscape conditions, and its changes, due to the following factors: the oil and natural gas industry, tropical fruits industry, shrimp farms, marine salt industry, occupation of the sensitive areas; demand for land, vegetation degradation, siltation in rivers, severe flooding, sea level rise (SLR), coastal dynamics, low and flat topography, high ecological value and tourism in the region and the rapid growth of urbanization. Conventional and remote sensing data were analyzed using modeling techniques based on ArcGIS, ER-Mapper, ERDAS Imagine and ENVI software. Digital images were initially processed by Principal Component Analysis and transformation of the maximum fraction of noise, and then all bands were normalized to reduce errors caused by bands of different sizes. They were integrated in a Geographic Information System analysis to detect changes, to generate digital elevation models, geomorphic indices and other variables of the study area. A three band color combination of multispectral bands was used to monitor changes of land and vegetation cover from 1986 to 2009. This task also included the analysis of various secondary data, such as field data, socioeconomic data, environmental data and prospects growth. The main objective of this study was to improve our understanding of eco-environmental vulnerability and risk assessment; it´s causes basically show the intensity, its distribution and human-environment effect on the ecosystem, and identify the high and low sensitive areas and area of inundation due to future SLR, and the loss of land due to coastal erosion in the Apodi-Mossoró estuary in order to establish a strategy for sustainable land use. The developed model includes some basic factors such as geology, geomorphology, soils, land use / land cover, vegetation cover, slope, topography and hydrology. The numerical results indicate that 9.86% of total study area was under very high vulnerability, 29.12% high vulnerability, 52.90% moderate vulnerability and 2.23% were in the category of very low vulnerability. The analysis indicates that 216.1 km² and 362.8 km² area flooded on 1m and 10m in sea levels respectively. The sectors most affected were residential, industrial and recreational areas, agricultural land, and ecosystems of high environmental sensitivity. The results showed that changes in eco-environmental vulnerability have a significant impact on the sustainable development of the RN state, since the indicator is a function of sensitivity, exposure and status in relation to a level of damage. The model were presented as a tool to assist in indexing vulnerability in order to optimize actions and assess the implications of decisions makers and policies regarding the management of coastal and estuarine areas. In this context aspects such as population growth, degradation of vegetation, land use / land cover, amount and type of industrialization, SLR and government policies for environmental protection were considered the main factors that affect the eco-environmental changes over the last three decades in the Apodi-Mossoró estuary.
Resumo:
The search for sustainable solutions through an appropriate environmental administration of the available natural resources, that comes from encounter to the aspirations of preservation of the environment and of the human being, in way to diagnose and to solve the environmental and social problems with the smallest possible impact to the nature and the man, it is the great challenge, so much for that generation, as for the future generations. The study of the environmental problems of the water and the participation and the social actors' environmental understanding as a whole, interferes in the field of the thematic environmental international, contemplating the strategic need of an appropriate administration of that very natural one, through a program returned to the diagnosis of the problems and in the search of compatible maintainable solutions, in a social and environmental politics of planning and environmental education, centered above all in the citizen's voice , user of that system. The present thesis she seeks to study the problem of the maintainable administration of the water, focusing the participation and the citizen's environmental understanding in the use of that very natural one for urban residential activities, in what concerns the approach and analyses of variables that treat of the measurement of general knowledge and you adapt, sense of community of the access to the means of information and of the attitudes and environmental behaviors, besides the variables of partner-demographic characterization or personal identification of the interviewed ones of an exploratory research of the type " survey ", accomplished through a stratified aleatory sampling, being the strata each one of the 4 (four) Political-Administrative Areas of the Natal city, having happened the collection of the data in the period of february to april/2002. The methodology used in this work it constitutes in the application of questionnaires with scales of the type Likert to measure the echo-varied of the study, besides a partner-demographic scale for the characterization of the studied sample. For the analysis of the results, it was made an exploratory descriptive study initially, followed by the use of techniques statistical multivariate s, such as, factorial analysis through the application of main components, besides the accomplishment of studies of multiple lineal regression. To complement this study, the accomplishment of Tests of Independence was proceeded through the Qui-square of Pearson, in way to verify the dependence of the associations between the partner-demographic variables and the principal selected variables and presents in the resulting factors of the factorial analysis. The results appear for a low level of environmental knowledge, of access to the information and community's sense, besides the verification that the principal factors resultants send for the need of feeling emphasis in the programs and administration actions addressed for the environmental understanding, the behaviors and attitudes that approach the information and the environmental education, besides the reuse of the water
Resumo:
O artigo apresenta os principais elementos que compõem a questão ambiental na sociedade global, através de sua relação entre economia, meio ambiente e política internacional. A primeira parte expõe o debate ambiental no contexto internacional, enfocando-o a partir dos anos 1960, período em que os problemas ambientais surgem com mais intensidade e com eles os protestos sociais nos países centrais. Os encontros sobre política ambiental internacional foram realizados com mais frequência nos anos setenta como a conferência internacional sobre meio ambiente, a primeira chancelada pela ONU em Estocolmo, 1972. Nas décadas de 1970/1980 as autoridades governamentais reconheceram a urgência na resolução da crise ambiental e passaram a traçar estratégias para a mitigação e contenção da crise. A década de 1990 é marcada pela Conferência Rio 1992, que lançou o desenvolvimento sustentável, o qual recomenda que as gerações presentes devem se reproduzir sem comprometer a capacidade de reprodução das gerações futuras. Os encaminhamentos da terceira conferência internacional sobre meio ambiente (Johanesburgo, 2002) condicionaram a questão ambiental à necessidade da formulação de leis ambientais por parte dos Estados Nacionais e instrumentos económicos de gestão ambiental. Na Rio + 20, o tema central foi a economia verde, que surge como alternativa ao desenvolvimento sustentável e se relaciona a mitigação das mudanças climáticas, produção de baixo carbono, eficiência energética, energia renovável etc. O texto se encerra explanando sobre a questão ambiental internacional na sociedade global.
Resumo:
This analysis on the ambient licensing is based on a research that identifies the fragilities and advances of the application of this instrument of politics of the environment in the ambient politics of the Rio Grande do Norte, in the period of 1992 the 2003. The isolated urban area of Búzios, situated in the City of Nísia Floresta/RN, situated in the eastern coast of the State, where concentrates the boarding of the ambient question as a matter in the Brazilian process of urbanization, over all the institutionalization and implementation of the ambient licensing. They are distinguished in the used methodology in consultation to the diverse involved social segments with the ambient subject in study, the example of the managers, technician and specialists, as well as the application of the legislation and norms techniques, the forms of appropriation of the common wealth and the procedures of ambient licensing of the competent agencies. The results of the research designate that the ambient licensing while instrument of the ambient politics is one of the alternatives more efficient as techniques in the process of sustainable development, since it is beyond the prerogatives to conciliate the activities and enterprises with the conservation of the environmental resources and natural benefits to the societies. In the RN one evidenced progress in the ambient legislation and the instructions techniques, and that the imperfections and limitations in the system of ambient licensing are not directly on to the instruments, but in the implementation of mechanisms of the ambient agencies. This because they do not make use of operational structure to apply in practical and established abilities, as an ambient management, institutional joint and deliberations of the State Counselor for Environment
Resumo:
A legislação ambiental e os principais agentes que se relacionam com a empresa se constituem em fatores exógenos que não podem ser negligenciados ao formular-se e avaliar-se a política ambiental corporativa. As influências exógenas e seus efeitos sobre a gestão ambiental e o gerenciamento de projetos de exploração e produção (E&P) e, por essa via, sobre o desempenho ambiental, foram objetos de estudo desta tese. Embora o desempenho ambiental seja um assunto relevante, a pesquisa sobre esse tema ainda é escassa. Tal carência desponta ainda mais acentuada quando se aborda o desempenho ambiental de projetos na indústria de petróleo e gás. O principal objetivo deste estudo foi avaliar a relação entre a legislação ambiental vigente, as ações de órgãos reguladores, fornecedores, empresas terceirizadas e comunidades locais e o desempenho ambiental dos projetos de E&P na indústria de petróleo e gás e, também, analisar os efeitos do sistema de gestão ambiental e o gerenciamento dos projetos sobre tal desempenho. Na fase abdutiva, foi conduzido um estudo de caso com abordagem qualitativa em uma grande empresa brasileira do setor de petróleo e gás, na fase dedutiva, foi realizada uma pesquisa survey explanatória de corte transversal com abordagem quantitativa, incluindo 113 projetos de E&P de cinco unidades executoras da empresa. Foi formulado um modelo conceitual, com cinco construtos e sete hipóteses de pesquisa, representativo dos efeitos de fatores externos sobre o desempenho ambiental dos projetos de E&P. Os dados foram tratados aplicando a Análise Fatorial Exploratória e a Modelagem de Equações Estruturais com aplicação dos softwares IBM® SPSS® Statistics 20.0 e IBM® SPSS® Amos 18.0. O modelo de equações estruturais foi reespecificado e estimado utilizando o método de Máxima Verossimilhança e o procedimento bootstrap com 2000 reamostragens, até alcançar adequados valores dos índices de ajustamento. O modelo mostrou boa aderência às evidências empíricas, representando uma teoria explicativa dos fatores que influenciam o desempenho ambiental dos projetos de E&P na empresa estudada. As estatísticas descritivas apontaram adequado desempenho dos projetos de E&P com relação aos efluentes descartados, volume de água reutilizada, redução de resíduos e práticas de reciclagem. Identificou-se que projetos de maior porte alcançam melhor desempenho ambiental em relação aos de menor tamanho. Não foram achadas diferenças significativas entre os desempenhos de projetos executados por unidades operacionais distintas. Os resultados da modelagem indicaram que nem a legislação ambiental, nem os agentes externos exercem influência significativa sobre a sistemática da gestão dos projetos de E&P. Os agentes externos atuam sobre a gestão ambiental da empresa exercitando capacidades colaborativas, obstrutivas e propositivas. A legislação ambiental é percebida como entrave ao desenvolvimento dos projetos ao longo de seu ciclo de vida, principalmente, pelas deficiências dos órgãos ambientais. Identificou-se que o sistema de gestão ambiental influencia diretamente o Programa de Desenvolvimento e Execução de Projetos de E&P, que, por sua vez, provoca efeitos diretos e indiretos sobre o desempenho ambiental. Finalmente, comprovou-se que o Sistema de Gestão Ambiental da empresa é determinante para o desempenho ambiental dos projetos de E&P, tanto pelos seus efeitos diretos, como pelos indiretos, estes últimos mediados pela sistemática de gestão dos projetos de E&P
Resumo:
In complex federal systems as that found in Brazil, which provides simultaneous attributions to of the Union, States and Cities in many aspects, the definition of performance limits of each of these entities, in procedural or material aspect, generates many (positive and/or negative) competence conflicts, bringing insecurity to general administered. Environmental licensing is one of the most important instruments of environmental management, seeking the realization of the fundamental right to an ecologically balanced and sustainable development. Despite its importance, the environmental licensing has not been more effective due the conflict related to the authority to regulate regardind environmental law. This essay will analyze the structure of competence distribution for conducting the environmental licensing processes, the conflict between laws, the performance of the municipal environmental agencies, the cooperation between the licensing agencies and the future about the additional regulatory law of article 23 of Federal Constitution
Resumo:
This work provides a discussion involving the development of practices in Environmental Education (EE) in Natal-RN city, taking as reference the Programa Vamos Cuidar do Brasil com as Escolas (PVCBE). The EE is emphasized by importance it takes within the context of the reforms carried out in Brazil to formal education, especially from the decade of 1980. The investigations focus the effect of PVCBE in promoting the EE. We take as theoretical - methodological base the global/national guidelines on EE, carried out the non-participant observation, document analysis, and application of questionnaires and use of statistical techniques in the data tabulation. The results indicate that there has been reasonable progress to the achieving of an implementation policy of EE clearly qualitative, with a better coordination among municipal policymakers and the schools involved. It has been also noticed that there is a gap between what the law provides for a formal EE and what is carried out in practice. Despite the limitations noted, we must remember that actions have been achieved. Even considering that they are isolated action; they already show that there are possibilities of follow ways to processes based on the criteria of integration, reflexive action, quality and autonomy
Resumo:
This present Thesis, is explorer work and presents an analysis of e-wastes of the industry of cellular mobile telephony, evaluating the evolution of the telecommunications nets and as if it holds the global and Brazilian market of cellular telephony. It approaches the elements gifts in the cellular devices that can badly cause to the environment and the health, the discarding of the devices in end of life cycle is made. It analyzes the new European regulation of electric equipment residues and electronic, the WEEE, as it influenced the strategy of the companies manufacturers of mobile phone cellular and of that she forms is possible to create a Brazilian national industry for recycling of devices of cellular, with conditions to globally competition. For this some possible models of being implanted in Brazil are presented. The project of law 203/91 on solid residues is argued and as it would be interesting if to persist some proposals presented to the project, to create a Brazilian market of recycling with capacity of global competition for use to advantage of the European regulation if to get a competitive advantage
Resumo:
This dissertation of Master of Science investigates the influence of the organization dimensions in the development of the management of the knowledge in the administrative activities developed by the tourist sector of the city of the Natal/RN. The adopted methodology was a descriptive research and exploration, using the technique of analysis of Cluster and Box Multiple Plot. The objective of if using descriptive and exploration analysis of the absolute values and the gotten percentages, are to present, on the basis of the studied dimensions, the degree of importance and the agreement related to the organization knowledge in the perception of the interviewed ones. The used instrument of research was a composed questionnaire for two parts: study of the management of the knowledge and profiles of the companies and interviewed. This questionnaire aims at the study of the organization environment, evidencing if the same it propitiates one administrative politics directed for the creation, storage and dissemination of the organization knowledge. Of this form, the general result presented a relationship of the content seen in the bibliography with the activities developed in the hotels, demonstrating that the management of the organization knowledge is of great importance for the development of this activity
Resumo:
The quarrel on the urban intensific use of determined areas of the city is carried through in some levels of the society, which had to the fact to bring direct influences the population that inhabits it. The question to become an area to intensific use, implies in determining that the local infrastructure has the capacity to take care of to a bigger amount of people, inhabitants or passers-by. In the quarter of Ponta Negra, in Natal city (state of RN), its condition of area to intensific use to the municipal Law 27/2000 happened due that it starts to allow a bigger level of occupation of part of the quarter. This law has a direct relation with the installation of a complementary infrastructure in the quarter, to put does not send to its complementation and maintenance, what it takes the consequences that are felt by the population. This work has as main objective the identification of the decurrent significant consequences of the creation of Ponta Negra s Intensific Use Zone, according to vision of the population of the quarter. The way followed for this involves the compatible bibliography research with the subject, analysis of documents that treat on the quarter, mappings of the area in search of a physical characterization and mainly, an application of questionnaire next to local population. In this questionnaire it is the main point of the necessary collection of data to the work, indicating the point of view of the population not only on the negative points, but also on the positive points that had happened since the creation of Intensific Use Zone. The answers indicate problems of natures social, infrastructure and enviromental, compatible with the problems of other areas that had passed the same for process, as point the studied bibliography, indicating imperfections in the planning process and maintenance of Ponta Negra s Intensific Use Zone