45 resultados para Gerenciamento de fornecedores
Resumo:
The hospital is a place of complex actions, where several activities for serving the population are performed such as: medical appointments, exams, surgeries, emergency care, admission in wards and ICUs. These activities are mixed with anxiety, impatience, despair and distress of patients and their families, issues involving emotional balance both for professionals who provide services for them as for people cared by them. The healthcare crisis in Brazil is getting worse every year and today, constitutes a major problem for private hospitals. The patient that comes to emergencies progressively increase, and in contrast, there is no supply of hospital beds in the same proportion, causing overcrowding, declines in the quality of care delivered to patients, drain of professionals of the health area and difficulty in management the beds. This work presents a study that seeks to create an alternative tool that can contribute to the management of a private hospital beds. It also seeks to identify potential issues or deficiencies and therefore make changes in flow for an increase in service capacity, thus reducing costs without compromising the quality of services provided. The tool used was the Computational Simulation –based in discrete event, which aims to identify the main parameters to be considered for a proper modeling of this system. This study took as reference the admission of a private hospital, based on the current scenario, where your apartments are in saturation level as its occupancy rate. The relocation of project beds aims to meet the growing demand for surgeries and hospital admissions observed by the current administration.
Resumo:
The process mapping is an important tool in the management of organizations, allowing better levels of productivity, quality and reciprocity concerning the implementation and decision-making. It benefits in a clear way the process organization and assures the manager a macro vision of the system. In this sense, the objective of this study is to describe the mapping process as it occurs in the Januario Cicco Maternity School–MEJC. The bibliographic and descriptive research included interviews, observations and researches in many databases. The study analyzed the limiting points of the detected flow trying to find a better comprehension of the flow of patients in the maternity in order to offer the gestors the information necessary to improve the quality of the assistance as well as a general view of the flow of patients and any change detected there. As a result, we believe that the process mapping may become a relevant factor to the organizational management of MEJC, in view that it is an element that can contribute to ease up the management of information studied, considering that the perfect change of information inside a complex system will produce improvements in all spheres of this institution.
Resumo:
rates in the Brazilian cities, which time there is an inexistent theoretical reflection about public policy statement adding the way of Urban Solid Waste (USW) and tailing integrated management plans in the majorly Brazilian cities. The unappropriated solid waste disposal and final pollution result in a strong socioenvironmental problems and material extravagancies that should be used to recycling and reusing waste material, besides bringing immense challenges for the thematic Strategy Urban and Environmental Management it considers the Sustainable City Model. Moreover, this labor projects a discussion about USW problematic through legally and environmentally point of view, including the public environmental policy and the social technologies as resolution tactics. At that time, it reports rights, scientific articles, documents and Environmental Law Doctrine on findings thematic studies, also the propose displays an interdisciplinary research methodology which combines bibliographic method - focusing theory aspects of the legally environmentally guiding principle, public policy and social technologies. Those are theorist features very important to create a Municipal Integrated Solid Waste Management Plan (PMGIRS) - modus operandi of the Federal Law n. 12.305/2010 (National Solid Waste Policy - PNRS). That policy is interesting to receive financial resources from federal government (Cities Ministry; idem, Federal Decree n. 7.404/2010 and Federal Law n. 10.257/2001) helping the preservation of the environment, regional development, generation of jobs and income (art. 6º), in addition broadening spreading’s private companies dedicated to waste management. Consequently, the PNRS contains a set of guidelines and general procedures; it should be an operation of this legal policy contextualized by Social Technologies theory (TS) into social issues, legal, economic and environmental aspects. Therefore, this research notes the possibility of public policy statement implementation over and done with the PNRS by the terms of development and sustainability in the urban space.
Resumo:
SILVA, Alexandre Reche e. LAUDMUS: rumo à implantação e gerenciamento de uma lista de audição musical online. In: ENCONTRO REGIONAL DA ABEM NORDESTE (Associação Brasileira de Educação Musical), 9, Natal, RN, 2010. Anais eletronicos... Natal, RN, 2010.Trabalho Completo. Disponivel em:
Resumo:
The present study has got as its aim to show how the impressions management is being used by the hotels in Paraiba State. For that, the dramma or role play perspective has been adopted as a model for service management. From the theater metaphor, the physical environment and its components can be seen as a scenery of the service show. We conduct the reader to notice the importance of the consummer about the service quality demand and its influence on his satisfaction. A methodology with exploring and qualifying nature has been adopted by using the analyses of content technique in interviews applied to hotel managers lebeled as having 4 and 5 stars in the State, trying to check how impression management takes place, identifying impression management tools used in relation to the physical evidences and to contacting people, as well as checking managers views in the survey about the use of impression management for client satisfaction make. The information revealed that managers, maybe for being unaware about impression management theory, haven t considered neither the physical evidences yet, nor contacting people as marketing tools. About the physical evidences, we could see that hotels take actions in a pulverized way referring to environment decoration and colors, however there isn t a global usage of physical evidences to highlight the service. Contacting people by their turn, receive better importance and attention. It was possible to make sure that managers are aware about the influence of the employee over the attendance quality. This way, we may come into a conclusion that impression management at Paraiba hotels has been under used, as long as managers seem to be, most times, turned to actions related to contacting people, not having realized the planning importance and national-wide use of service scenery in a genaral way yet
Resumo:
The inclusion of local suppliers in production chains has considerable impact on its performance, but most notably in its main actors. The results of this process may be of different kinds and can be analyzed from economic or institutional approaches. This study aimed to verify the existence of different performances of Petrobras due to the inclusion of local suppliers in the oil and gas production chain in the state of Rio Grande do Norte, from the viewpoints of transaction costs and the Institutional Theory. In order to this, were made the characterization of the PROMINP, the description of its actions and results, the mapping of its institutional context of reference, and identification of results obtained by Petrobras in terms of transaction costs and legitimacy. The theoretical framework is based on authors dealing with industrial concentration, as like Marshall, Krugman, Porter and Schmitz, from the sociological perspective of neoinstitucional theory, as like DiMaggio and Powell and Scott and Meyer, and transaction costs, as like Williamson. This is a qualitative research, with data collection done by consulting secondary fonts and semi-structured interviews with nineteen actors of three groups, namely: actors involved in actions of the program, representatives of enterprises and representative of Petrobras. To analyze the content was used the Suchman s model (1995) for categories associated with strategies of legitimation and fourteen variables associated with the three variables assets specificity, bounded rationality and opportunism (Williamson, 1995, 1989) in the case of transaction costs. The results indicate that PROMINP has achieved its objectives by encouraging the increased participation of local companies in the oil and gas production chain, reflecting in the economic development of the state. The Redepetro/RN, fostered and built upon the interaction of the participants, is presented as a solution of continuity to the participation of enterprises in the chain, after the closure of the actions of the program. PROMINP demands responses to coercive, legislative and regulatory pressures of the organizational field, whose institutional context of reference is wide. From the point of view of legitimacy, through strategies to gain cognitive legitimacy and maintaining pragmatic legitimacy, Petrobras can manipulate the environment, ensuring the compliance of the constituents to their technical and institutional demands. Enterprises, in turn, respond to the demands through compliance with technical demands, mainly through the certification of processes, and cultural changes. There aren t clear gains related to the transaction costs, however, gains in legitimacy can be seen as a cumulative capital that can serve as a competitive differential that generates economic gains. In terms of theoretical findings, it was found that, due to its explanatory power for actions that are difficult to explain only in economic terms, Institutional Theory may be used as theoretical support concurrent with other theories. TCE model has limitations in explaining the program actions. In the case, it s emphasized that Petrobras doesn t seek only economic efficiency, but has in its mission the commitment to social development.
Resumo:
The change in the economic world and the emergence of Internet as a tool for communication and integration among the markets have forced organizations to adopt a different structure, process-oriented with a focus on information management. Thus, information technology has gained prominence in the organizational context, increasing its complexity and range of services provided by this function. Moreover, outsourcing has become an important model for flexible corporate structure, helping organizations to achieve better results when carrying out their activities and processes and be more competitive. To make the IT outsourcing, it is necessary to follow certain steps that range from strategic assessment to the management of outsourced service. Such steps can influence the form of contracting services, varying the types of service providers and contractors. Thus, the study aimed to identify how this IT outsourcing process influences the use of models for contracting services. For this, a study was conducted in multiple cases study involving two companies in Rio Grande do Norte State, specifically the health sector. Data collection was carried out with the CIOs of the companies surveyed through semi-structured interviews. According to the results obtained, it was found that the outsourcing process more structured influences the use of a more advanced contracting model. However, there are features found in these steps carrying more clearly this influence, as the goals pursued by outsourcing, the criteria used in selecting the supplier, a contract negotiation, how to transition services and the use of methods management, but can vary depending on the level of maturity in the relationship of the companies examined. Moreover, it was found that the use of contracting model may also influence how it is developed the IT outsourcing process, requiring or not its more formalized and organization
Resumo:
The information technology - IT- benefits have been more perceived during the last decades. Both IT and business managers are dealing with subjects like governance, IT-Business alignment, information security and others on their top priorities. Talking about governance, specifically, managers are facing it with a technical approach, that gives emphasis on protection against invasions, antivirus systems, access controls and others technical issues. The IT risk management, commonly, is faced under this approach, that means, has its importance reduced and delegated to IT Departments. On the last two decades, a new IT risk management perspective raised, bringing an holistic view of IT risk to the organization. According to this new perspective, the strategies formulation process should take into account the IT risks. With the growing of IT dependence on most of organizations, the necessity of a better comprehension about the subject becomes more clear. This work shows a study in three public organizations of the Pernambuco State that investigates how those organizations manage their IT risks. Structured interviews were made with IT managers, and later, analyzed and compared with conceptual categories found in the literature. The results shows that the IT risks culture and IT governance are weakly understood and implemented on those organizations, where there are not such an IT risk methodology formally defined, neither executed. In addition, most of practices suggested in the literature were found, even without an alignment with an IT risks management process
Resumo:
This study aimed to measure the perception of maturity project management of state boards of Rio Grande do Norte by the perception of its managers. Argues that project management has been highlighted as a critical factor for the success of any organization, because the projects are directly related to the set of activities that result in organizational innovation as products, services and processes and the improvement of project management is directly aligned with the main pillars of the New Public Management. Methodologically, this is a quantitative research of a descriptive nature in which 161 forms were applied with coordinators and subcoordinators of state departments of Rio Grande do Norte, culminating in a sampling error of less than 6% to 95% confidence according to the procedures finite sampling. The process of tabulation and analysis was done using the package Statistical Package for Social Sciences - SPSS 18.0 and worked with techniques such as mean, standard deviation, frequency distributions, cluster analysis and factor analysis. The results indicate that the levels of maturity in project management in state departments of Rio Grande do Norte is below the national average and that behavioral skills are the main problem for improving management in these departments. It was possible to detect the existence of two groups of different perceptions about the management of projects, indicating, according to the managers, there are islands of excellence in project management in some sectors of the state departments. It was also observed that there are eight factors that affect maturity in project management: Planning and Control , Development of Management Skills , Project Management Environment , Acceptance of the Subject Project Management , Stimulus to Performance , Project Evaluation and Learning , Project Management Office and Visibility of Project Managers . It concludes that the project management in state departments of Rio Grande do Norte has no satisfactory levels of maturity in project management, affecting the levels of efficiency and effectiveness of the state apparatus, which shows that some of the assumptions that guide the New Public Management are not getting the levels of excellence nailed by this management model
Resumo:
The research aimed to evaluate the level of maturity of the project management office of the Public Ministry of the State of Rio Grande do Norte, on the model PMO Maturity Cube. It was based on a theoretical framework that includes project management, project management office and maturity of the project management office. The research was classified as to the purpose as exploratory and descriptive. According to the methods used was a case study, and how to approach is qualitative and quantitative. The research unit was the prosecutor of the State of Rio Grande do Norte, by two guys who represent all of the participants in the project management office of the institution. These subjects were chosen because they act with the office since the foundation of the same, having the knowledge necessary to deepen the research required, and experience with projects and work experience in the area. Data were collected through an adaptation of the evaluation form for the amplitude corporate developed and presented to the scientific environment for Pinto, Cota and Levin (2010). The results revealed that the level of maturity in the current strategic approach is 77%, and 97% desired; tactical approach in current is 66% and 97% desired, and the current operational approach is 78%, and 100% desired. He pointed out that several factors influence the level of maturity of the project management office of the Public Prosecutor and the recurrent related to information technology, regarding the storage and sharing of information. Concluded that the level of maturity of the project management office of the Public Ministry of the State of Rio Grande do Norte is advanced
Resumo:
This work aims to analyze risks related to information technology (IT) in procedures related to data migration. This is done considering ALEPH, Integrated Libray System (ILS) that migrated data to the Library Module present in the software called Sistema Integrado de Gestão de Atividades Acadêmicas (SIGAA) at the Zila Mamede Central Library at the Federal University of Rio Grande do Norte (UFRN) in Natal/Brazil. The methodological procedure used was of a qualitative exploratory research with the realization of case study at the referred library in order to better understand this phenomenon. Data collection was able once there was use of a semi-structured interview that was applied with (11) subjects that are employed at the library as well as in the Technology Superintendence at UFRN. In order to examine data Content analysis as well as thematic review process was performed. After data migration the results of the interview were then linked to both analysis units and their system register with category correspondence. The main risks detected were: data destruction; data loss; data bank communication failure; user response delay; data inconsistency and duplicity. These elements point out implication and generate disorders that affect external and internal system users and lead to stress, work duplicity and hassles. Thus, some measures were taken related to risk management such as adequate planning, central management support, and pilot test simulations. For the advantages it has reduced of: risk, occurrence of problems and possible unforeseen costs, and allows achieving organizational objectives, among other. It is inferred therefore that the risks present in data bank conversion in libraries exist and some are predictable, however, it is seen that librarians do not know or ignore and are not very worried in the identification risks in data bank conversion, their acknowledge would minimize or even extinguish them. Another important aspect to consider is the existence of few empirical research that deal specifically with this subject and thus presenting the new of new approaches in order to promote better understanding of the matter in the corporate environment of the information units
Resumo:
Universidade Federal do Rio Grande do Norte
Resumo:
In the operational context of industrial processes, alarm, by definition, is a warning to the operator that an action with limited time to run is required, while the event is a change of state information, which does not require action by the operator, therefore should not be advertised, and only stored for analysis of maintenance, incidents and used for signaling / monitoring (EEMUA, 2007). However, alarms and events are often confused and improperly configured similarly by developers of automation systems. This practice results in a high amount of pseudo-alarms during the operation of industrial processes. The high number of alarms is a major obstacle to improving operational efficiency, making it difficult to identify problems and increasing the time to respond to abnormalities. The main consequences of this scenario are the increased risk to personal safety, facilities, environment deterioration and loss of production. The aim of this paper is to present a philosophy for setting up a system of supervision and control, developed with the aim of reducing the amount of pseudo-alarms and increase reliability of the information that the system provides. A real case study was conducted in the automation system of the offshore production of hydrocarbons from Petrobras in Rio Grande do Norte, in order to validate the application of this new methodology. The work followed the premises of the tool presented in ISA SP18.2. 2009, called "life cycle alarm . After the implementation of methodology there was a significant reduction in the number of alarms
Resumo:
A legislação ambiental e os principais agentes que se relacionam com a empresa se constituem em fatores exógenos que não podem ser negligenciados ao formular-se e avaliar-se a política ambiental corporativa. As influências exógenas e seus efeitos sobre a gestão ambiental e o gerenciamento de projetos de exploração e produção (E&P) e, por essa via, sobre o desempenho ambiental, foram objetos de estudo desta tese. Embora o desempenho ambiental seja um assunto relevante, a pesquisa sobre esse tema ainda é escassa. Tal carência desponta ainda mais acentuada quando se aborda o desempenho ambiental de projetos na indústria de petróleo e gás. O principal objetivo deste estudo foi avaliar a relação entre a legislação ambiental vigente, as ações de órgãos reguladores, fornecedores, empresas terceirizadas e comunidades locais e o desempenho ambiental dos projetos de E&P na indústria de petróleo e gás e, também, analisar os efeitos do sistema de gestão ambiental e o gerenciamento dos projetos sobre tal desempenho. Na fase abdutiva, foi conduzido um estudo de caso com abordagem qualitativa em uma grande empresa brasileira do setor de petróleo e gás, na fase dedutiva, foi realizada uma pesquisa survey explanatória de corte transversal com abordagem quantitativa, incluindo 113 projetos de E&P de cinco unidades executoras da empresa. Foi formulado um modelo conceitual, com cinco construtos e sete hipóteses de pesquisa, representativo dos efeitos de fatores externos sobre o desempenho ambiental dos projetos de E&P. Os dados foram tratados aplicando a Análise Fatorial Exploratória e a Modelagem de Equações Estruturais com aplicação dos softwares IBM® SPSS® Statistics 20.0 e IBM® SPSS® Amos 18.0. O modelo de equações estruturais foi reespecificado e estimado utilizando o método de Máxima Verossimilhança e o procedimento bootstrap com 2000 reamostragens, até alcançar adequados valores dos índices de ajustamento. O modelo mostrou boa aderência às evidências empíricas, representando uma teoria explicativa dos fatores que influenciam o desempenho ambiental dos projetos de E&P na empresa estudada. As estatísticas descritivas apontaram adequado desempenho dos projetos de E&P com relação aos efluentes descartados, volume de água reutilizada, redução de resíduos e práticas de reciclagem. Identificou-se que projetos de maior porte alcançam melhor desempenho ambiental em relação aos de menor tamanho. Não foram achadas diferenças significativas entre os desempenhos de projetos executados por unidades operacionais distintas. Os resultados da modelagem indicaram que nem a legislação ambiental, nem os agentes externos exercem influência significativa sobre a sistemática da gestão dos projetos de E&P. Os agentes externos atuam sobre a gestão ambiental da empresa exercitando capacidades colaborativas, obstrutivas e propositivas. A legislação ambiental é percebida como entrave ao desenvolvimento dos projetos ao longo de seu ciclo de vida, principalmente, pelas deficiências dos órgãos ambientais. Identificou-se que o sistema de gestão ambiental influencia diretamente o Programa de Desenvolvimento e Execução de Projetos de E&P, que, por sua vez, provoca efeitos diretos e indiretos sobre o desempenho ambiental. Finalmente, comprovou-se que o Sistema de Gestão Ambiental da empresa é determinante para o desempenho ambiental dos projetos de E&P, tanto pelos seus efeitos diretos, como pelos indiretos, estes últimos mediados pela sistemática de gestão dos projetos de E&P
Resumo:
Activities that have fuel subterranean storage system are considered potentially polluting fuels by CONAMA Resolution 273, due to the possibility of leak, outpouring and overflow of fuel into the ground. Being even more worrying when contaminate groundwater for public supply, as the case of Natal City. For this reason, the Public Ministry/RN, in partnership with UFRN, developed the project environmental suitability of Gas stations in Natal, of which 36% showed evidence of contamination. This paper describes the four stages of the management of contaminated areas: preliminary assessment of environmental liabilities, detailed confirmatory investigation of the contamination, risk analysis to human health (RBCA), as well as the remediation plan of degraded areas. Therefore it is presented a case study. For the area investigated has been proposed a mathematical method to estimate the volume of LNAPL by a free CAD software (ScketchUp) and compare it with the partition method for grid area. Were also performed 3D graphics designs of feathers contamination. Research results showed that passive benzene contamination in groundwater was 2791.77 μg/L, when the maximum allowed by CONAMA Resolution 420 is 5 μg/L which is the potability standards. The individual and cumulative risks were calculated from 4.4 x10-3, both above the limits of 1.0 x10-5 or by RBCA 1.0 x10-6 by the Public Ministry/RN. Corrective action points that remediation of dissolved phase benzene is expected to reach a concentration of 25 μg/L, based on carcinogenic risk for ingestion of groundwater by residents residential, diverging legislation. According to the proposed model, the volume of LNAPL using the ScketchUp was 17.59 m3, while by the grid partitioning method was 14.02 m3. Because of the low recovery, the expected removal of LNAPL is 11 years, if the multiphase extraction system installed in the enterprise is not optimized