88 resultados para A Estação


Relevância:

10.00% 10.00%

Publicador:

Resumo:

We propose in this work a software architecture for robotic boats intended to act in diverse aquatic environments, fully autonomously, performing telemetry to a base station and getting this mission to be accomplished. This proposal aims to apply within the project N-Boat Lab NatalNet DCA, which aims to empower a sailboat navigating autonomously. The constituent components of this architecture are the memory modules, strategy, communication, sensing, actuation, energy, security and surveillance, making these systems the boat and base station. To validate the simulator was developed in C language and implemented using the graphics API OpenGL resources, whose main results were obtained in the implementation of memory, performance and strategy modules, more specifically data sharing, control of sails and rudder and planning short routes based on an algorithm for navigation, respectively. The experimental results, shown in this study indicate the feasibility of the actual use of the software architecture developed and their application in the area of autonomous mobile robotics

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The oil industry has several segments that can impact the environment. Among these, produced water which has been highlight in the environmental problem because of the great volume generated and its toxic composition. Those waters are the major source of waste in the oil industry. The composition of the produced water is strongly dependent on the production field. A good example is the wastewater produced on a Petrobras operating unit of Rio Grande do Norte and Ceará (UO-RNCE). A single effluent treatment station (ETS) of this unit receives effluent from 48 wells (onshore and offshore), which leads a large fluctuations in the water quality that can become a complicating factor for future treatment processes. The present work aims to realize a diagnosis of a sample of produced water from the OU - RNCE in compliance to certain physical and physico-chemical parameters (chloride concentration, conductivity, dissolved oxygen, pH, TOG (oil & grease), nitrate concentration, turbidity, salinity and temperature). The analysis of the effluent is accomplished by means of a MP TROLL 9500 Multiparameter probe, a TOG/TPH Infracal from Wilks Enterprise Corp. - Model HATR - T (TOG) and a MD-31 condutivimeter of Digimed. Results were analyzed by univariated and multivariated analysis (principal component analysis) associated statistical control charts. The multivariate analysis showed a negative correlation between dissolved oxygen and turbidity (-0.55) and positive correlations between salinity and chloride (1), conductivity, chloride and salinity (0.70). Multivariated analysis showed there are seven principal components which can explain the variability of the parameters. The variables, salinity, conductivity and chloride were the most important variables, with, higher sampling variance. Statistical control charts have helped to establish a general trend between the physical and chemical evaluated parameters

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In northeastern semiarid, seasonality on precipitation temporal distribution, high intensity storm events and inadequate management of native vegetation can promote soil erosion. Vegetation removal causes soil surface exposure, reduces soil water storage capacity and can be the source degradation processes. In this context, this approach aims to analyze water and soil erosion processes on a 250 m2 undisturbed experimental plot with native vegetation, slope 2.5% by using 2006 and 2007 monitoring data. The site was instrumented to monitor rainfall, overland flow runoff and erosion by using a 5 m³ tank downstream the plot. Soil erosion monitoring was made by transported sediment and organic matter collection after each event. Field infiltration experiments were made at 16 points randomly distributed within the plot area by using a constant head infiltrometer during drought and rainy seasons, respectively. Infiltration data revealed high spatial and temporal variability. It was observed that during the beginning of the rainy period, 77% of the events showed runoff coefficient less than 0.05. As the rainy season began, soil water increase produced annual species germination. High intensity storms resulted in runoff coefficients varying between 0.33 and 0.42. Once the annual species was established, it was observed that approximately 39% of the events produced no runoff, which reflects an increase on soil water retention capacity caused by the vegetation. A gradual runoff reduction during the rainy season emphasizes the effect of vegetative density increase. Soil erosion observed data allowed to fit an empirical relationship involving soil loss and precipitation height, which was used to analyze the plot installation impact on soil erosion. Observed soil loss in 2006 and 2007 was 230 Kg/ha and 54 Kg/ha, respectively

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Pirangi beach is located in the eastern coastline of Rio Grande do Norte state, in the municipality of Parnamirim and Nísia Floresta. In it flow into Pirangi Watershed (PW), whose water receives large amounts of pollutants, mainly domestic and industrial sewage from districts where pass the rivers that consist it, compromising, thus, the bathing water quality of the Pirangi beach. Bearing in mind the importance of water sanitary quality to ensure an environment that no present risk to the bathers s health, this work had as main objective to assess the influence of the PW s waters in the bathing water quality of the Pirangi beaches. To that end, were made collections of water in the beaches and in the rivers with the intention of quantify the fecal contamination indicators thermotolerant coliforms and enterococci, to then classify the conditions of bathing water quality according with the CONAMA Resolution number 274 of 2000. For the purposes greater knowledge about the health conditions of the Beaches Pirangi and about the influence the PW s waters exert on it, was done parallely to the study of the water quality, an investigation of the sand sanitary quality. Furthermore, it was made an evaluation of the PW s Water Quality through Water Quality Index (WQI). Starting from the results obtained in the research present was possible to verify, among other aspects, that the entry of the PW s waters in the Pirangi beaches exerts direct influence in the bathing water quality of the same ones, being the North Pirangi beach (point tracking PA-02) the most influenced. There was noticed also a significant reduction in the conditions of bathing water quality of the beaches in the rainy season. However, the precariousness do sewerage system of the Natal metropolitan region and the absence of a right system of treatment an final disposal of domestic sewage and industrial are the main factors responsi le for deterioration of the PW s Water Quality, and as a consequence, compromising the bathing water quality of the Pirangi beaches

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Only 32% of the population of Natal is attended by sewage, while the remaining population use pits and septic tanks. The characterization of the contents of septic tanks and pits contributes to the performance of such system and may guide the decision on treatment of these contents. The main of this research is to characterize the contents of interior residential pits and septic tanks in the greater Natal, with the following specific goals: to develop and manufacture a sampler capable of collecting a representative sample of the entire column (the surface scum, the clarified liquid and sludge bottom); to compare the contents of the tanks with the pits; to compare the contents of the septage from vacuum trucks; to relate the composition content with socioeconomic characteristics of households; to compare the content in both chambers of the septic tanks in series; to assess the situation of the content before and six months after the cleanness; and ultimately propose a pilot scale plant for treatment of septage. Once the sampler was developed, samples were collected within 14 septic tanks and 10 pits in many districts of Natal. Medians of the 24 systems were obtained: temperature, pH, conductivity, oil and grease, total solids, total suspended solids and sediments of 28.0 °C, 6.95; 882 mS/cm, 75.2 mg/L; 10,169 mg/L, 6,509 mg/L and 175 mL/L respectively; 111.0 mgN/L for ammonia, 130.5 mgN/ L for organic nitrogen, 0.2 mgN/L for nitrite, 0.4 mg/L for nitrate; 8935 mgO2/L for COD, 29.2 mgP/L for total phosphorus, thermotolerant coliforms from 9.95 E +06 CFU/100mL helminth eggs and 9.2 eggs/L with a maximum concentration of 688 eggs/L and minimum of 0 eggs/L. Medians of organic nitrogen and TKN were significantly different between groups of tanks and pits. The systems with cleanness gap from 11 and 20 years presented the higher concentrations for most variables. The effluent from the toilets and bathrooms participate more effectively in contributing fractions of solids, alkalinity, nitrogen, COD, total phosphorus, thermotolerant coliforms and helminth eggs. The systems used by socioeconomics class with income from R$ 3,700.00 to R$ 7,600.00, presented higher concentrations for COD, nitrogen, solids and helminth eggs. The first of the two chambers had always presented higher concentrations over the second compartment. The analysis of variance for most variables, showed that the values of septic tanks, pits and septage from vacuum trucks belong to the same group. In the samples taken after cleanness, the median of pH and temperature increased, while alkalinity, COD, organic nitrogen, total phosphorus, ammonia and helminth eggs decreased. The oils and greases and thermotolerant coliforms had slightly varied due to the continuous release of sewage into the systems that maintained their steady state concentrations.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This research study deals with the production and distribution of drinking water with quality and safety in order to meet the needs of the Man. Points out the limitations of the methodology for assessing water quality in use today. Approaches the recommendations of the World Health Organization (WHO) for adoption, by the companies responsible for producing and distributing water, of assessment methodologies and risk management (HACCP), in order to ensure the quality and safety of water drinking. Suggests strategies for implementing the plan for water safety plan. Uses the process of water production, composed by Maxaranguape river basin, the water treatment plant and distribution system, which is part of the Plan for Expansion of the Supply System of Natal, as case study. The results, it was possible to devise strategies for implementation of the Water Safety Plan (WSP), which comprises the following steps: a) a preliminary stage. b) assessment system. c) process monitoring. d) management plan and e) validation and verification of the PSA. At each stage are included actions for its implementation. The implementation of the PSA shows a new type of water production, in which the fountain as a whole (watershed and point of capture), the Water Treatment Plant (WTP) and distribution, shall compose the production process, over which to build quality and safety of the final product (drinking water)

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The study that resulted in this dissertation was developed at OU RNCE PETROBRAS, in Natal, which implemented a project of rational use and reuse of water, including use of wastewater from a Sewage Treatment Plant (STP) already in place, diluted with water from own wells for irrigation of green area of the building complex corporate enterprise. Establish a methodology that can serve as guidelines for future projects controlled reuse of water like this was the objective of this research. Been proposed, implemented and evaluated three instruments of sanitary and environmental control: 1) adaptation of sewage treatment plant and quality control of the treated effluent 2) analysis of soil-nutrient interaction in the irrigated area, 3) knowledge of the local hydrogeology, especially with regard to the direction of flow of the aquifer and location of collection wells of Companhia de Águas e Esgotos do Rio Grande do Norte (CAERN) situated in the surroundings. These instruments have proven sufficient and appropriate to ensure the levels of sanitary and environmental control proposed and studied, which were: a) control of water quality off the STP and the output of the irrigation reservoir, b) control of water quality sub surface soil and assessment of progress on soil composition, c) assessment of water quality in the aquifer. For this, we must: 1) establishing the monitoring plan of the STP and its effluent quality sampling points and defining the parameters of analysis, improve the functioning of that identifying the adequacy of flow and screening as the main factors of operational control, and increase the efficiency of the station to a relatively low cost, using additional filters, 2) propose, implement and adapt simple collectors to assess the quality of water percolating into the soil of the irrigated area, 3) determine the direction of groundwater flow in the area study and select the wells for monitoring of the aquifer.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The semiarid rainfall regime is northeastern Brazil is highly variable. Climate processes associated with rainfall are complex and their effects may represent extreme situations of drought or floods, which can have adverse effects on society and the environment. The regional economy has a significant agricultural component, which is strongly influenced by weather conditions. Maximum precipitation analysis is traditionally performed using the intensity-duration-frequency (IDF) probabilistic approach. Results from such analysis are typically used in engineering projects involving hydraulic structures such as drainage network systems and road structures. On the other hand, precipitation data analysis may require the adoption of some kind of event identification criteria. The minimum inter-event duration (IMEE) is one of the most used criteria. This study aims to analyze the effect of the IMEE on the obtained rain event properties. For this purpose, a nine-year precipitation time series (2002- 2011) was used. This data was obtained from an automatic raingauge station, installed in an environmentally protected area, Ecological Seridó Station. The results showed that adopted IMEE values has an important effect on the number of events, duration, event height, mean rainfall rate and mean inter-event duration. Furthermore, a higher occurrence of extreme events was observed for small IMEE values. Most events showed average rainfall intensity higher than 2 mm.h-1 regardless of IMEE. The storm coefficient of advance was, in most cases, within the first quartile of the event, regardless of the IMEE value. Time series analysis using partial time series made it possible to adjust the IDF equations to local characteristics

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Wetlands systems are considered nowadays as a treatment method that uses simple, easy operation and low cost technology, which has been used in various parts of the world and also in Brazil. Used alone or as a complement to other types of treatment systems, once it effectively removes nutrients, pathogens and other pollutants in the water. Due to the high complexity found in wetlands, making it difficult to predict the response of the system to treat wastewater, one should consider as ideal to base the sizing of the wetland system over the necessary removal of this parameter instead of scaling it from empiricism. The study was conducted to determine the coefficient of bacterial decrease in the Wetland unit located at Ponta Negra Station Sewage Treatment, located in Natal, the coastal region of Rio Grande do Norte. The most representative model to determine the bacterial decrease in this system was the one from Chick for hydraulic piston system. Kb of 0.37 d-1 were found for the flow rate of 15m³/d, while for the system operating at maximum design flow, 30m³/d, the Kb of 0.98 d-1 was found

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The management of water resources in the river basin level, as it defines the Law nº 9433/97, requires the effective knowledge of the processes of hydrological basin, resulting from studies based on consistent series of hydrological data that reflect the characteristics of the basin. In this context, the objective of this work was to develop the modeling of catchment basin of the river Jundiaí - RN and carry out the study of attenuation of a flood of the dam Tabatinga, by means of a monitoring project of hydrological data and climatology of the basin, with a view to promoting the development of research activities by applying methodologies unified and appropriate for the assessment of hydrological studies in the transition region of the semiarid and the forest zone on the coast of Rio Grande do Norte. For the study of the hydrological characteristics of the basin was conducted the automatic design of the basin of the river Jundiaí, with the aid of programs of geoprocessing, was adopted a hydrological model daily, the NRCS, which is a model determined and concentrated. For the use of this model was necessary to determine some parameters that are used in this model, as the Curve Number. Having in mind that this is the first study that is being conducted in the basin with the employment of this model, it was made sensitivity analysis of the results of this model from the adoption of different values of CN, situated within a range appropriate to the conditions of use, occupation and the nature of the soil of this basin. As the objective of this study was also developing a simulation model of the operation of the Tabatinga dam and with this flood control caused in the city of Macaíba, it was developed a mathematical model of fluid balance, developed to be used in Microsoft Excel. The simulation was conducted in two phases: the first step was promoted the water balance daily that allowed the analysis of the sensitivity of the model in relation to the volume of waiting, as well as the determination of the period of greatest discharges daily averages. From this point, it was assumed for the second stage, which was in the determination of the hydrograph of discharges effluent slots, that was determined by means of the fluid balance time, on the basis of the discharges effluents generated by a mathematical equation whose parameters were adjusted according to the hydrograph daily. Through the analyzes it was realized that the dam Tabatinga only has how to carry out the attenuation of floods through the regularization of the volume of waiting, with this there is a loss of approximately 56.5% on storage capacity of this dam, because for causing the attenuation effect of filled the shell of this dam has to remain more than 5m below the level of the sill, representing at least 50.582.927m3. The results obtained with the modeling represents a first step in the direction of improving the level of hydrological information about the behavior of the basins of the semiarid. In order to monitor quantitatively the hydrographic basin of the river Jundiaí will be necessary to install a rain gauge register, next to the Tabatinga dam and a pressure transducer, for regular measurements of flow in the reservoir of the dam. The climatological data will be collected in full automatic weather station installed in Agricultural School Jundiaí

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The state of Rio Grande do Norte, possessor of an extremely irregular regime of rains, has the necessity of enlarge and specify the researches about its own hydro-climatic conditions, to achieve trustworthy results that are able to minimize the adversities imposed by these conditions and make possible the implementation of a better planning in the economic activities and of subsistence that somehow utilize of the multiple uses of hydro resources of the State. This way, the daily values observed from the pluviometric series of 166 posts, with 45 years uninterrupted of historic data, were adjusted to the incomplete gamma function to the determination of the probability of rain in the 36 period of ten days in which the year was divided. To the attainment of the α and β parameters of this function it was applied the method of the maximum verisimilitude allowing, in the end, to analyze the temporal and spatial distribution of the rain in the level of 75% of probability. The values of potential evapo-transpiration were calculated by the Linacre method that, through the SURFER software, were confronted with the dependant rain, obtaining, in this way, the spatialization of the potential hydro availability, which the values can be known to any period of ten days of the year, city and/or region of the state of Rio Grande do Norte. With the identification of the main meteorological systems that act in the State, we sought to better comprehend how this systems interfere, in the irregular regime of rain, in the situations of several clime in the major part of Rio Grande do Norte and in the hydro regional balance. And, finally, with these data in hand and with the generated maps, we verified that space-temporal distribution of the rain and of the potential hydro availability were heterogeneous in the whole State, mainly in the West and Central regions, inserted in potiguar s semi-arid, which, after the period of the rains station, suffers with dry season and length drought during the rest of the year

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The simulation of SES-Natal Ponta Negra: mitigation of environmental risks and predictive maintenance strategy was developed in the context of several operational irregularities in the pumping stations and sewage systems in the system Ponta Negra. Thus, the environmental risks and complaints against the company due to overflows of sewage into the public thoroughfare became common. This neighborhood has shown in recent years an increase of resident higher than the initial expectation of growth. In this sense presumed the large population growth and generation of sewers higher than expected, associated to the use of corrective maintenance and misuse of the system may be the main causes of operational failures occurring in the SES. This study aimed at analyzing the hydraulic behavior of SES Ponta Negrathrough numerical simulation of its operation associated to future scenarios of occupation. The SES Ponta Negra has a long lengthof collection networks and 6 pumping stations interconnected, being EE 1, 2, 4 coastal way, and beach Shopping interconnected EE3 to receives all sewers pumped from the rest pumping station and pumped to the sewage treatment station of neighborhood which consists of a facultative pond followed by three maturation ponds with disposal of treated effluent into infiltration ditches. Oncethey are connected with each other, the study was conducted considering the days and times of higher inflow for all lifts. Furthermore, with the aim of measuring the gatherer network failures were conducted data survey of on the networks. Thephysical and operational survey data was conducted between January/2011 and janeiro/2012. The simulation of the SES was developed with the aim ofdemonstrating its functioning, eithercurrently and in the coming years, based in population estimates and sewage flow. The collected data represents the current framework of the pumping stations of the SES Ponta Negra and served as input to the model developed in MS Excel ® spreadsheet which allowed simulating the behavior of SES in future scenarios. The results of this study show thatBeach Shopping Pumping Station is actually undersized and presents serious functioning problemsthatmay compromise the environmental quality of surrounding area. The other pumping stations of the system will reach itsmaximum capacity between 2013 and 2015, although the EE1 and EE3 demonstrateoperation capacity, even precariously, until 2017. Moreover, it was observed that the misuse of the network system, due to the input of both garbage and stormwater, are major factors of failures that occur in the SES. Finally, it was found that the corrective maintenance appliance, rather than predictive,has proven to beinefficient because of the serious failuresin the system, causing damage to the environment and health risks to users

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In the state of Rio Grande do Norte (RN), Brazil, there are about 80 sewage treatment systems being the predominant technology waste stabilization ponds. The Baldo s WWTP , due to its location and low availability of area, was designed as a hybrid conventional system (UASB reactor followed by activated sludge with biodiscs) at a tertiary level, being the most advanced WWTP in the State and also with the larger treatment capacity (1620 m3/h) .The paper presents the results of its performance based on samples collections from May to December 2012. Composite samples of the effluent of the grit chamber, UASB reactors, anoxic chambers, aeration tanks and treated effluent were collected weekly, every 4 hours for 24 hours. The results showed that the WWTP effluent presented adequate ranges of temperatures, pH and DO, however removal efficiencies of BOD and TSS were below the predicted by design. The UASB reactors also showed removals of BOD and TSS less than expected, due to the accumulation of sludge in the reactors, which eventually, was washed out in the effluent. The nitrification process was not satisfactory mainly due to problems in the oxygen distribution in the aeration tanks. The removal of ammonia and TKN were high, probably by the assimilation process

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Waste stabilization ponds are the main technology in use for domestic sewage treatment in Rio Grande do Norte State (RN), northeast Brazil. The are around 80 systems, constructed mainly by municipal city halls, being series comprised by a primary facultative pond followed by two maturation ponds the most used configuration. Due to problems related with the production and destination of sludge and generation of bad odors, the designers have avoided the use of anaerobic lagoons. The majority of systems are rarely monitored to verify their efficiencies and to get new project parameters for future designing. This work has as purpose to make a diagnosis of efficiency of three series of waste stabilization pond series (WSPS) of Jardim Lola 1, Jardim Lola 2 and Beira Rio, located in the North Zone of the city of the Natal/RN, treating domestic raw sewage, on the removal of organic matter and thermotolerant coliform, comparing the operational conditions of the systems this inside of the bands foreseen in the project, through parameters BOD5, QOD, thermotolerant coliforms, dissolved oxygen, pH, temperature, ammoniac nitrogen, total and suspended solids. The work was carried through in the WSPS, all constituted by a primary facultative pond followed by two maturation ponds. Socioeconomic characteristics of population are predominantly low and all the plants are very near of the contributing basins. The series were monitored from of May the November of 2002, totalizing 20 collections of grab samples of raw sewage and ponds effluents between 8:00 and 9:50 h. The main aspect to be detached by the results was the great concentration of organic matter (BOD and COD) and microorganisms the raw sewage which were around two times more concentrated than those values foreseen one in project. Considering all series the highest removals of organic matter were observed in system Beira Rio (84 and 78% of BOD and COD, respectively), which presented high hydraulic detention time (TDH = 89 days). On the other hand, Jardim Lola 1 and Jardim Lola 2 presented a much lower values of HDT (36 days and 18 days respectively) and their removals of BOD and COD were the same (76% and 60%, respectively). The Beira Rio WSPS, was the most efficient verified in relation to solids and ammonia, proving the great influence of the operational variables such as HDT and applied surface organic loadings on the performance of pond series. Although the treatment plants have reached efficiencies of thermotolerant coliforms around 99,999%, the concentrations in the final effluent can be considered very high for launching in aquatic bodies, particularly those produced by Jardim Lola 1 and Jardim Lola 2 series

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The stimulation of motor learning is an important component to a rehabilitation and type of practice used is de basic importance to Physiotherapy. The motor skills are the types more basic of behavior that subjects must acquire throughout its lives and observational learning one of forms for its acquisition. Objective: This study aimed to compare performance of patients post- stroke on test of recognition of activities of day life using self-controlled and externally determined practice. Intervention: Forty subjects had been evaluated, 20 stroke patients (the mean age was 57,9?}6,7 years, schooling 6,7?}3,09 years and time of injury 23,4?}17,2 months) and 20 health subjects (the mean age 55,4?}5,9 years and schooling 8?}3,7 years). All was evaluated about independence functional (FIM) and cognitive state (MMSE), and patients were also evaluated about neurologic state (NIHSS). Later, all realized a recognition of activities of day life test (drink water and speak to telephone) on self-controlled (PAUTO and CAUTO) and externally determined (P20 and C20) frequency. The stroke subjects also were examined for a three-dimensional system of kinematic analysis, when they have drink water. The statistic analysis was realized for chi-square and t Student tests. Results: This was not difference, about number of rightness, between groups of self-controlled and externally determined practice (p0,005), and also not between patients and control groups (p0,005). Patients mean velocity (PAUTO: 141,1mm/sec and P20: 141,6mm/sec) and peak velocity (PAUTO: 652,1mm/sec and P20: 598,6mm/sec) were reduced, as well as the angles reached for elbow (PAUTO: 66,60 and 124,40; P20: 66,30 and 128,50 extension e flexion respectively) regarding literature. Conclusions: The performance on recognition of activities of day life test was similar between on self-controlled and externally determined frequency, showing both technique may be used to stimulate motor learning on chronic patients after stroke