18 resultados para teste de progênie


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Coordenação de Aperfeiçoamento de Pessoal de Nível Superior - CAPES

Relevância:

20.00% 20.00%

Publicador:

Resumo:

ALVES, Janaína da Silva. Análise comparativa e teste empírico da validade dos modelos CAPM tradicional e condicional: o caso das ações da Petrobrás. Revista Ciências Administrativas, Fotaleza, v. 13, n. 1, p.147-157, ago. 2007.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document aims to improve the quality of the production test in vertical tanks with free water drain pipes, through a device to control the draining system. This proposal consists of an interface detector close to the tank bottle and a control valve on the pipe-drain; they are attached to a remote supervisor system, which will be minimizing the human influence in the conclusion of the test result. And for more consciousness the work shows the importance of the wells production test in the attendance and diagnosis of the productive process, informing the large number of tests executed and problems of the procedure adopted in the field today. There are many possible sources of uncertainty in this kind of test as shown in the experiments realized in the field; the object prototype of this dissertation will be made in the field, based upon the definition of parameters and characteristics of the devices proposal. For a better definition of the draining process the action results of the assessment test are shown, especially changed some for the understand ing of the real process. It shows the proposal details and the configuration that will be used in the tank of Monte Alegre s field Production Station, explaining the interface detector kind and the control system. It is the base to a pilot project now in development, named as the new project classified in the status of the new technology and production improvement of PETROBRAS in Rio Grande do Norte and Ceará. This dissertation concludes that the automation of the conventional test with the draining system will bring benefits both economically as metrologically, because it reduces the uncertainty of the test procedures with free water draining, and also decreases the number of tests with problems