18 resultados para monitoração


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Stabilization pond is the main technology used for treatment wastewater, in northeast Brazil, due to lower cost of deployment, operation and maintenance compared to other technologies. Most systems of stabilization ponds has been in operation for some time, on average 10 years of operation, receiving high organic loads and do not have good removal efficiencies of the main parameters for which have been designed. Therefore it is necessary to work to quantify the efficiency of current systems. This study evaluated the biodegradability of organic matter in raw sewage, the removal of organic matter in reactors and determination of the kinetic constant removal of organic matter (k), both in reactors and in raw sewage, based on the analysis made in the laboratory and through mathematical methods proposed in the literature, in nine systems stabilization ponds, located in Rio Grande do Norte. In relation the degradation kinetics in stabilization ponds, it was observed that many papers published in the literature were obtained in pilot-scale systems, which often, due to the action of external factors such as wind and temperature, these can t be considered as a reference in the analysis of the kinetic constant K, so the need for more research into systems of scale. This study had three distinct phases and simultaneous, routine monitoring, study of the daily cycle and the determination of kinetic constant of degradation of organic matter (K). The monitoring showed that the removal efficiencies of organic matter on most systems were lower than suggested by the literature, the best efficiencies of around 76% (BOD) and 72% (COD) and the worst of the order of 48% (BOD) and 55% (COD). The calculation of K in raw sewage (Ke) was within the range of variation expected in the literature (0.35 to 0.60 days-1). Already for the results obtained for K in the reactors (Kr), there were well below the values recommended in the literature (0.25 to 0.40 d-1 for complete mix and from 0.13 to 0.17 d-1 for flow dispersed), in line with the overloads that organic systems are subject

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The goal of the power monitoring in electrical power systems is to promote the reliablility as well as the quality of electrical power.Therefore, this dissertation proposes a new theory of power based on wavelet transform for real-time estimation of RMS voltages and currents, and some power amounts, such as active power, reactive power, apparent power, and power factor. The appropriate estimation the of RMS and power values is important for many applications, such as: design and analysis of power systems, compensation devices for improving power quality, and instruments for energy measuring. Simulation and experimental results obtained through the proposed MaximalOverlap Discrete Wavelet Transform-based method were compared with the IEEE Standard 1459-2010 and the commercial oscilloscope, respectively, presenting equivalent results. The proposed method presented good performance for compact mother wavelet, which is in accordance with real-time applications.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In the operational context of industrial processes, alarm, by definition, is a warning to the operator that an action with limited time to run is required, while the event is a change of state information, which does not require action by the operator, therefore should not be advertised, and only stored for analysis of maintenance, incidents and used for signaling / monitoring (EEMUA, 2007). However, alarms and events are often confused and improperly configured similarly by developers of automation systems. This practice results in a high amount of pseudo-alarms during the operation of industrial processes. The high number of alarms is a major obstacle to improving operational efficiency, making it difficult to identify problems and increasing the time to respond to abnormalities. The main consequences of this scenario are the increased risk to personal safety, facilities, environment deterioration and loss of production. The aim of this paper is to present a philosophy for setting up a system of supervision and control, developed with the aim of reducing the amount of pseudo-alarms and increase reliability of the information that the system provides. A real case study was conducted in the automation system of the offshore production of hydrocarbons from Petrobras in Rio Grande do Norte, in order to validate the application of this new methodology. The work followed the premises of the tool presented in ISA SP18.2. 2009, called "life cycle alarm . After the implementation of methodology there was a significant reduction in the number of alarms