58 resultados para Energia renovável. Energia eólica offshore. LCOE
Resumo:
The research and development of wind turbine blades are essential to keep pace with worldwide growth in the renewable energy sector. Although currently blades are typically produced using glass fiber reinforced composite materials, the tendency for larger size blades, particularly for offshore applications, has increased the interest on carbon fiber reinforced composites because of the potential for increased stiffness and weight reduction. In this study a model of blade designed for large generators (5 MW) was studied on a small scale. A numerical simulation was performed to determine the aerodynamic loading using a Computational Fluid Dynamics (CFD) software. Two blades were then designed and manufactured using epoxy matrix composites: one reinforced with glass fibers and the other with carbon fibers. For the structural calculations, maximum stress failure criterion was adopted. The blades were manufactured by Vacuum Assisted Resin Transfer Molding (VARTM), typical for this type of component. A weight comparison of the two blades was performed and the weight of the carbon fiber blade was approximately 45% of the weight of the fiberglass reinforced blade. Static bending tests were carried out on the blades for various percentages of the design load and deflections measurements were compared with the values obtained from finite element simulations. A good agreement was observed between the measured and calculated deflections. In summary, the results of this study confirm that the low density combined with high mechanical properties of carbon fibers are particularly attractive for the production of large size wind turbine blades
Resumo:
At present, the electricity generation through wind energy has an importance growing in the world, with the existence of very large plans for future wind power installation worldwide. Thus, the increasing the electricity generation through wind power requires, more and more, analysis of studies of interaction between wind parks and electric power systems. This paper has as purposes to implement equivalent models for synchronous wind generators to represent a wind park in ATP program and to check behavior of the models through simulations. Simulations with applications of faults were achieved to evaluate the behavior of voltages of system for each equivalent model, through comparisons between the results of models proposed, to verify if the differences obtained allows the adoption of the simplest model
Resumo:
In the last decade, the renewable energy sources have present a major propulsion in the world due to several factors: political, environmental, financial and others. Within this context, we have in particular the energy obtained through wind, wind energy - that has highlighted with rapid growth in recent years, including in Brazil, mostly in the Northeast, due to it s benefit-cost between the clean energies. In this context, we propose to compare the variable structure adaptive pole placement control (VS-APPC) with a traditional control technique proportional integral controller (PI), applied to set the control of machine side in a conversion system using a wind generator based on Double-Fed Induction Generator (DFIG). Robustness and performance tests were carried out to the uncertainties of the internal parameters of the machine and variations of speed reference.
Resumo:
This work purposes the application of a methodology to optimize the implantation cost of an wind-solar hybrid system for oil pumping. The developed model is estimated the implantation cost of system through Multiple Linear Regression technique, on the basis of the previous knowledge of variables: necessary capacity of storage, total daily energy demand, wind power, module power and module number. These variables are gotten by means of sizing. The considered model not only can be applied to the oil pumping, but also for any other purposes of electric energy generation for conversion of solar, wind or solar-wind energy, that demand short powers. Parametric statistical T-student tests had been used to detect the significant difference in the average of total cost to being considered the diameter of the wind, F by Snedecor in the variance analysis to test if the coefficients of the considered model are significantly different of zero and test not-parametric statistical by Friedman, toverify if there is difference in the system cost, by being considered the photovoltaic module powers. In decision of hypothesis tests was considered a 5%-significant level. The configurations module powers showed significant differences in total cost of investment by considering an electrical motor of 3 HP. The configurations module powers showed significant differences in total cost of investment by considering an electrical motor of 5 HP only to wind speed of 4m/s and 6 m/s in wind of 3 m, 4m and 5 m of diameter. There was not significant difference in costs to diameters of winds of 3 m and 4m. The mathematical model and the computational program may be used to others applications which require electrical between 2.250 W and 3.750 W. A computational program was developed to assist the study of several configurations that optimizes the implantation cost of an wind-solar system through considered mathematical model
Resumo:
The purpose of this study was to investigate the social-environmental implications of the first large scale wind farm recently built in Brazil (2006), Parque Eólico de Rio do Fogo (PERF), to the nearby communities. The research was base on the adjustment of the DIS/BCN tool to analyze social impact and it was linked to the multi-method approach. Applying the autophotography strategy, cameras were given to five children from the district of Zumbi, the nearest location to PERF, and they were asked to individually photograph the six places they liked the most and the six places they liked the least in their community. Then, these children were interviewed individually and collectively about the photographs. Adult locals in Zumbi, residents of Zumbi/Rio do Fogo settlement, members of the State and Municipal government and representatives of the PERF were also interviewed with the aid of some of the pictures taken by the children and others that might trigger something to say, as a strategy called sample function. The five children presented positive image towards PERF; all of them chose to photograph it as one of places they liked. Adult population of Zumbi presented positive visual evaluation towards PERF. A small number of the interviewees were aware of the environmental and social benefits of wind energy production. Residents did not participate of the decision making process regarding PERF. They approved the project, especially because of the jobs provided during construction. Nowadays, PERF is something apart from their lives because it no longer provides jobs or any other interaction between the facility and the locals. Residents relate to the land, not with the facility. However, there is no evidence of rejection towards PERF, it is simply seen as something neutral to their lives. The low levels of education, traditional lack of social commitment and citizenship, and the experience accumulated by PERF´s planners and builders in other countries, may be contributing points to the fact that Zumbi residents did not oppose to PERF. It is clear that the country needs a legislation which seriously considers the psycho-social dimension involved in the implementation of wind farms
Resumo:
T he socio - economy of the coastal municipalities of Rio Grande do Norte semiarid coast was analyzed th r ou g h by the actors, ant hropogenic implications, fishing environment and composition of its fish fauna, as well as the trend of product ion landed by the artisanal fleet with the aim of identifying the sustainability and management. In this study, were used participatory methodologies, monthly data of rainfall between September 2001 and December 2010; landings of the artisanal fleet during January 2001 to December 2010; and socioeconomic (IBGE, 2002/2010), (IDEMA, 2011/2012), (MPA, 2010; 2012), UNDP and MS (2013). Based on these data, we performed analysis of variance were performed using the method of Analytic Hierarchy Process (HAP) and s tatistical models of multiple regression and time series. It was identified that the occupation of the coastal and marine zone through salt industry, tourism, shrimp farming, oil and gas and wind energy reconfigured the environment and attracted new actors . Rainfall influenced the catches, of which 35% occur in the rainy season, 40% in the dry season and 25% independent. Production increased 55%, in the period analyzed , being landed in 31 ports spread over 11 municipalities, cap tured in environments mangrov e/ estuarine (23%), coastal (46%) and oceanic (31%). Despite market up 41 species, were commercialized in the region production concentrated in eight, mainly landed in Macau and Caiçara North, by vessels of small and medium - sized (motorized and sailboats) . Highlights included three species ( Hirundichthys affins , Coryphaena hippurus and Opisthonema oglinum ), which together accounted for 63.3% of the whole volume. It was found that the motorized vessels tripled in number while sailboats reduced by half. Landin gs by different types of vessels tend to increase over time, while the small sailboats vessels, decrease. The introduction of more new motorized vessels and sailboats also tend to increase production. The study concluded that GDP and HDI of coastal countie s increased however inequality persisted. The potential of artisanal fishing is in the stage “ unfavorable ” of development and the trend in fish production is to grow over time and with the entry of more vessels. However, it is urgent that the state actions to promote and enhance planning to restore fish stocks in a sustainable and profitable fisheries standards. Therefore, it is recommend the strategic use of natural resources in a sustainable development perspective.
Resumo:
The constant necessity for new sources of renewable energy is increasingly promoting the increase of investments in this area. Among other sources, the wind power has been becoming prominent. It is important to promote the search for the improvement of the technologies involved in the topologies of the wind turbines, seeking for alternatives which enhance the gotten performance, despite the irregularity of the wind speed. This study presents a new system for speed control, in this case applied to the wind turbines - the Electromagnetic Frequency Regulator (EFR). One of the most used devices in some topologies is the mechanical gearboxes which, along with a short service life, often represent sources of noise and defects. The EFR does not need these transmission boxes, representing a technological advancement, using for that an adapted induction machine, in which the stator becomes mobile, supportive to the axis of the turbine. In the topology used in this study, the EFR also allows us to leave out the usage of the eletronic converters to establish the coupling between the generator and the electrical grid. It also the reason why it provides the possibility of obtaining the generation in alternating current, with constant voltage and frequency, where there is no electrical grid. Responsable for the mechanical speed control of the generator, the EFR can be useful in other transmission systems in which the mechanical speed control output is the objective. In addition, the EFR operates through the combination of two inputs, a mechanical and other electrical. It multiplies the possibilities of application because it is able to synergistic coupling between different arrays of energy, and, for such reasons, it enables the various sources of energy involved to be uncoupled from the network, being the synchronous generator responsible for the system connection with the electrical grid, simplifying the control strategies on the power injected in it. Experimental and simulation results are presented through this study, about a wind turbine, validating the proposal related to the efficience in the speed control of the system for different wind conditions.
Resumo:
The use of energy from renewable sources is increasingly demanded by society, especially aeolian - whose raw material is wind. Investments in wind power have become significant in Brazil with emphasis on the Northeast and in particular the Rio Grande do Norte state. According to the Empresa de Pesquisa Energética (Energy Research Company) (2012 ) , investments in the state grew significantly since 2002 with a total accumulated power, by 2013, of approximately 3,400 MW . Even with the early experiences of exploitation of wind energy in 2002, it is still considered new and requires further study referring to the likely changes in the environment and society. In this case, it is of growing and urgent importance to deeply study the wind still in the survey phase of the project, ie , at the beginning of decision making on the most feasible to implement these parks site. Given the above, the question is: from a technical and environmental analysis, how to identify viable areas to install Aeolian parks, taking into account the factors of the environmental dynamics that are relevant to minimize the negative results to the environment and the society? Thus, this study conducted a study on technical and environmental feasibility, proposing a methodology of exploration of feasible wind farms in coastal areas. The study area was a fragment of the northern coast of Rio Grande do Norte and its natural landscape units were identified through the environmental characterization of the area, as well as it was elaborated the map of the land cover, restriction homes and urban areas and Permanent Preservation Areas - PPAs. The environmental fragility was subdivided in the fragility of the natural dynamic, mapped through relief, soils and geology of natural units, and the fragility of the ecosystem, originated by the land cover map. In addition to these maps, it was generated the wind resource for an area from a height of 50 and 100 meters. The intersection between the fragility maps, PPAs and Restriction of homes superimposed on maps of wind potential, provided the map of feasibility of Aeolian parks, resulting in the most favorable areas for its facilities in a technical and environmental point of view. From this study, the entrepreneur can evaluate whether or not to proceed with the studies in this area and especially decrease potential conflicts with society.
Resumo:
The setting up of wind power enterprises at Permanent Preservation Areas reflects the obvious conflict and necessary convergence between free market and energy security on the one hand, and the promotion of environmental quality on the other. From the perspective of energy sustainability, and in order to achieve development (in its complex meaning, which converges economic, social, environmental and cultural aspects), the harmonization between free market and an ecologically sustainable environment is required. This work aims to identify the link between the protection system of the Permanent Preservation Areas and the current constitutional order, by analyzing the implementation of wind power enterprises in these protected zones focusing on the proportionality aspects. A legal and purposeful research was developed, from a theoretical method, followed by collecting and analyzing both primary and secondary data. From these data, the law, the legal literature and judicial decisions were cross-examined, under the light of the Constitution and guided by the theory of proportionality and related development imperatives. In this context, the present study identified the link between the principles of the economic order, environment and energy law, finding their basis under the Federal Constitution and development. By reproducing this interrelationship and by means of post-crisis institutional reforms, the guiding objectives of the Brazilian electric sector began to corroborate the precepts of development, although issues regarding its sustainability still persist. The appraisal of proportionality indicates that the Permanent Preservation Areas protection system is insufficient to materialize the right to a healthy quality of life upon the implementation of wind projects at Permanent Preservation Areas, albeit seeking the harmonization between free market and environmental protection.
Resumo:
The setting up of wind power enterprises at Permanent Preservation Areas reflects the obvious conflict and necessary convergence between free market and energy security on the one hand, and the promotion of environmental quality on the other. From the perspective of energy sustainability, and in order to achieve development (in its complex meaning, which converges economic, social, environmental and cultural aspects), the harmonization between free market and an ecologically sustainable environment is required. This work aims to identify the link between the protection system of the Permanent Preservation Areas and the current constitutional order, by analyzing the implementation of wind power enterprises in these protected zones focusing on the proportionality aspects. A legal and purposeful research was developed, from a theoretical method, followed by collecting and analyzing both primary and secondary data. From these data, the law, the legal literature and judicial decisions were cross-examined, under the light of the Constitution and guided by the theory of proportionality and related development imperatives. In this context, the present study identified the link between the principles of the economic order, environment and energy law, finding their basis under the Federal Constitution and development. By reproducing this interrelationship and by means of post-crisis institutional reforms, the guiding objectives of the Brazilian electric sector began to corroborate the precepts of development, although issues regarding its sustainability still persist. The appraisal of proportionality indicates that the Permanent Preservation Areas protection system is insufficient to materialize the right to a healthy quality of life upon the implementation of wind projects at Permanent Preservation Areas, albeit seeking the harmonization between free market and environmental protection.
Resumo:
With the heavy use of bearings in various segments of the industry, there are a large number of necessary interruptions in industrial processes to perform maintenance on these devices, with the case study wind turbines. The growth of the wind energy sector, encouraged to conduct research that helps to solve this problem. To contribute to predictive maintenance has been carried out a signal analysis using techniques which allow detection and location of the problem in order to prevent accidents caused and losses due to unexpected equipment failures, whereas low system rotation complicates the detection of the failure. To work around this problem, there was the indication of standard signals for defects in the bearings, making diagnosis of possible failures. With this diagnosis can be performed predictive maintenance, identifying the failure of the system that were tested, such as the introduction of grains of sand in the bearing, wear on the outer race of the bearing and bearing rust. By processing signals it is possible to construct graphs developing a mapping of defects by different peaks in the frequency band.
Resumo:
This study aims to use a computational model that considers the statistical characteristics of the wind and the reliability characteristics of a wind turbine, such as failure rates and repair, representing the wind farm by a Markov process to determine the estimated annual energy generated, and compare it with a real case. This model can also be used in reliability studies, and provides some performance indicators that will help in analyzing the feasibility of setting up a wind farm, once the power curve is known and the availability of wind speed measurements. To validate this model, simulations were done using the database of the wind farm of Macau PETROBRAS. The results were very close to the real, thereby confirming that the model successfully reproduced the behavior of all components involved. Finally, a comparison was made of the results presented by this model, with the result of estimated annual energy considering the modeling of the distribution wind by a statistical distribution of Weibull
Resumo:
The generation of electricity in Brazil is predominantly renewable, with internal hydraulic generation being more than 70% of its energy matrix. The electricity rationing occurred in 2001 due to lack of rain, led the country to increase the participation of alternative energy sources. This need for new sources of energy makes the regional potential to be exploited, which configures the change of generation model from centralized generation to distributed generation. Among the alternative sources of energy, the solar energy is presented as very promising for Brazil, given that most of its territory is located near to the equator line, which implies days with greater number of hours of solar radiation. The state of Rio Grande do Norte (RN) has one of the highest levels of solar irradiation of the Brazilian territory, making it eligible to receive investments for the installation of photovoltaic solar plants. This thesis will present the state-of-the-art in solar photovoltaic power generation and will examine the potential for generation of solar photovoltaic power in Brazil and RN, based on solarimetrics measurements conducted by various institutions and also measurements performed in Natal, the state capital
Resumo:
Solar energy presents itself as an excellent alternative for the generation of clean, renewable energy. This work aims to identify technological trends of photovoltaic cells for solar energy. The research is characterized, in relation to nature, to be applied; regarding the approach is qualitative and quantitative; with respect to the objectives, it is exploratory and descriptive; concerning the methodological procedure is considered a bibliographic research with a case study in the case of solar photovoltaic sector. The development of this research began with a literature review on photovoltaic solar energy and technology foresight. Then it led to the technology mapping of photovoltaic solar cells through the analysis of articles and patents. It was later performed the technological prospecting of photovoltaic cells for solar energy through the Delphi method, as well as the construction of the current plan and future technology of photovoltaic cells for the current scenario, 2020 and 2025. The results of this research show that the considered mature technologies (silicon mono and multicrystalline) will continue to be commercially viable within the prospected period (2020-2025). Other technologies that are currently viable (amorphous silicon, cadmium telluride and copper indium selenide / Copper indium gallium diselenide-), may not submit the same condition in 2025. Since the cells of silicon nanowires, dye-sensitized and based on carbon nanostructure, which nowadays are not commercially viable, may be part of the future map of photovoltaic technologies for solar energy.
Resumo:
The Tungsten/copper composites are commonly used for electrical and thermal objectives like heat sinks and lectrical conductors, propitiating an excellent thermal and electrical conductivity. These properties are dependents of the composition, crystallite size and production process. The high energy milling of the powder of W-Cu produces an dispersion high and homogenization levels with crystallite size of W very small in the ductile Cu phase. This work discusses the effect of the HEM in preparation of the W-25Cu composite powders. Three techniques of powder preparation were utilized: milling the dry with powder of thick Cu, milling the dry with powder of fine Cu and milling the wet with powder of thick Cu. The form, size and composition of the particles of the powders milled were observed by scanning electron microscopy (SEM). The X-ray diffraction (XRD) was used to analyse the phases, lattice parameters, size and microstrain of the crystallite. The analyse of the crystalline structure of the W-25Cu powders milled made by Rietveld Method suggests the partial solid solubility of the constituent elements of the Cu in lattice of the W. This analyse shows too that the HEM produces the reduction high on the crystallite size and the increase in the lattice strain of both phases, this is more intense in the phase W