2 resultados para management units

em Repositório digital da Fundação Getúlio Vargas - FGV


Relevância:

30.00% 30.00%

Publicador:

Resumo:

This study will collaborate by bringing some detailed analysis and findings on a special case study of a discontinuous product development process, trying to answer how the discontinuous product development process takes place and the main factors that influence this process. Additionally, it tried to explore some explanations for the difficulties generally faced by the companies to sustain innovation. The case is about the Motorola cell phone RAZR V3, launched in 2004. RAZR V3 was noted by industry experts as game-changing feat of design and engineering, selling more than 110 million units by end of 2008 and recognized as one of the fastest selling products in the industry. The study uses a single case methodology, which is appropriate given the access to a phenomenon that happened inside corporate dominium and it is not easily accessed for academic studies, besides being a rare case of success in the cellular phone industry. In order to magnify the understanding of the phenomenon, the exploration was extended to contrast the RAZR development process and the standard product development process in Motorola. Additionally, it was integrated a longitudinal reflection of the company product development evolution until the next breakthrough product hitting the cellular phone industry. The result of the analysis shows that discontinuous products do not fit well traditional product development process (in this case, stage-gate). This result reinforces the results obtained on previous studies of discontinuous product development conducted by other authors. Therefore, it is clear that the dynamics of discontinuous product development are different from the continuous product development, requiring different treatment to succeed. Moreover, this study highlighted the importance of the management influence in all the phases of the process as one of the most important factors, suggesting a key component to be carefully observed in future researches. Some other findings of the study that were considered very important for a discontinuous product development process: have champions (who believe and protect the project) and not only one champion; create a right atmosphere to make flow the creative process; question paradigms to create discontinuous products; simple guiding light to focus the team; company culture that accepts and knows how to deal with risks; and undoubtedly, have a company strategy that understands the different dynamics of continuous and discontinuous product development processes and treat them accordingly.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

O trabalho tem como objetivo avaliar e descrever analiticamente a implementação de práticas de manufatura enxuta pela Pirelli Pneus no seu complexo industrial da América Latina. Além de uma descrição estruturada e ampla dos princípios de produção de Toyota e fundamentos teóricos do Lean thinking, uma ênfase especial será dedicada ao projeto EGR (Especialistas em Gestão da Rotina), como uma ferramenta estratégica para ser usada pela empresa multinacional italiana no futuro próximo, de modo a alcançar um resultado mais eficaz e eficiente na gestão da rotina diária. Este projeto, que representa um componente significativo do Pirelli Manufacturing System (PMS) e, principalmente, voltado para supervisores e gestores de plantas, consiste principalmente em ajudar a empresa a desenvolver a capacidade empresarial para avaliar corretamente o gap potencial existente entre os resultados atuais e os esperados, para tanto entender os desvios, bem como as causas subjacentes, e melhorar continuamente o desempenho da empresa por meio da padronização de processos e redução de desperdicios. Esses objetivos podem ser perseguidos, atuando em dois meios essenciais: habilidades técnicas e comportamentais de liderança para apoiar cada equipe de projeto; uma maior eficácia na gestão de indicadores de desempenho nas diferentes unidades de fábrica, de acordo com KPIs estabelecidos no nível central pelo Head Quarter. Além disso, a investigação será focada na experiência peculiar da planta de Santo André, onde o EGR começou como piloto, com o objetivo de captar as alterações relevantes (no lado organizacional e econômico) que este projeto trouxe para a empresa, através da realização de pesquisa de campo e entrevistas, que são orientados a recolher provas, considerações e opiniões de todos os principais atores envolvidos.