3 resultados para Path feasibility
em Digital Archives@Colby
Resumo:
http://digitalcommons.colby.edu/atlasofmaine2006/1017/thumbnail.jpg
Resumo:
This paper addresses the feasibility of implementing Japanese manufacturing systems in the United States. The recent success of Japanese transplant companies suggests that Just-In-Time (JIT) production is possible within America's industrial environment. Once American workers receive proper training, they have little difficulty participating in rapid setup procedures and utilizing the kanban system. Japanese transplants are gradually developing Japanese-style relationships with their American supplier companies by initiating long-term, mutually beneficial agreements. They are also finding ways to cope with America's problem of distance, which is steadily decreasing as an obstacle to JIT delivery. American companies, however, encounter Significant problems in trying to convert traditionally organized, factories to the JIT system. This paper demonstrates that it is both feasible and beneficial for American manufacturers to implement JIT production techniques. Many of the difficulties manufacturers experience center around a general lack of information about JIT. Once a company realizes its potential for setup-time reduction, a prerequisite for the JIT system, workers and managers can work together to create a new process for handling equipment changeover. Significant results are possible with minimal investment. Also, supervisors often do not realize that the JIT method of ordering goods from suppliers is compatible with current systems. This "kanban system" not only enhances current systems but also reduces the amount of paperwork and scheduling involved. When arranging JlT delivery of supplier goods, American manufacturers tend to overlook important aspects of JIT supplier management. However, by making long-tenn commitments, initiating the open exchange of information, assisting suppliers in reaching new standards of performance, increasing the level of conununication, and relying more on suppliers' engineering capabilities, even American manufacturers can develop Japanese-style supplier relationships that enhance the effectiveness of the system.
Resumo:
The eastern timber wolf (Canis lupus lycaon) once inhabited Maine, as well as the rest of the eastern United States and southern Canada. As a result of human land use and widespread extermination campaigns, wolf numbers dramatically decreased, and by the early twentieth century, no wolves remained in Maine. As large carnivorous and territorial mammals, wolves require contiguous undeveloped areas with abundant prey. This project is a feasibility study that identifies the areas in Maine that are suitable for the reintroduction of wolves. We used GIS modeling to identify contiguous forested areas over 1,000 km2, calculate road and population density, and map the presence or absence of prey throughout the state. These variables were combined in a habitat suitability model to determine the location and amount of suitable wolf habitat in Maine. The northwestern part of the state appears most suitable for wolf reintroduction as it is relatively undeveloped with low road and population densities. There is also a smaller isolated area in Washington County that might be suitable, but further investigation is required.