28 resultados para technology management

em Deakin Research Online - Australia


Relevância:

100.00% 100.00%

Publicador:

Resumo:

To provide managers with a critical insight into the management of new technology, this paper uses a case study research strategy to examine the technology management experiences of a leading UK manufacturing organization during its adoption of a vendor-supplied Manufacturing Resource Planning information system.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The decision process that organisations utilise when evaluating technology investment opportunities is a complex and even political process; however, the correct decision can provide the organisation with considerable operational and competitive benefits. The research presented in this paper presents the findings of a postal survey of the benefits provided by technology investments to large German manufacturers. It was found that only where middle management generated the idea for the advanced manufacturing technology (AMT) investment was success in that investment significantly more likely. Respondents who established a project team to plan the technology proposal, regardless of the department which generated the ideas for technology investment, were not significantly associated with a greater likelihood for success.

The respondents typically took between 3 and 12 months before making the final decision to invest, irrespective of the department generating the idea for the AMT, and a further 6 months to implement the AMT. Respondents who utilised a discounted cashflow analysis took significantly longer to make the final decision to invest. The greatest number of manufacturing outcomes of significantly higher importance was identified for respondents where Engineering, IT or R&D generated the AMT ideas. It was also determined that the respondents most frequently considered AMT investments in computer hardware or software and technical training for process workers to be necessary at the time of considering the investment. Middle management were found to be significantly more concerned than managers on other levels about opposition of workers to the AMT, while the process workers were significantly more concerned about interruptions to the process during installation.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Preliminary research into the critical factors associated with software development/implementation identified three dimensions for successful implementation based on alignment of the requirements engineering process with business needs, change management process and quality of the implementation process. Research results demonstrate the link between the conceptual model for process quality and the process management attributes determined during the research.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The thesis addresses the issue of a limited success of knowledge management systems in spite of substantial investments in their development and implementation. Through the research, core reasons for this situation were identified and an innovative user-centered solution that focuses knowledge management on supporting professional activities is presented.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Focuses on the impact of information technology networks on small businesses acting as intermediaries between large enterprises and customers. Explores whether disintermediation is a threat for these small business intermediaries. Investigated factors affecting the use of information technology by small businesses to gain positive outcomes.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

Information technology has become the core tool of business organisations’. External and internal threats as well as legal, regulatory and contractual compliance requirements are all combining to make effective information security a key information technology management challenges. This paper describes an undergraduate information technology security management course that provides comprehensive knowledge and skills necessary to manage both strategic and operational aspects of information security. The course covers a broad range of managerial topics in information technology security and makes use of a number of security tools and techniques to complement the theory taught. In this paper, we describe our approach, our experiences and lessons learned for teaching information technology security management course. The paper details the content of the course and outlines how it is taught and assessed.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This article reports on the introduction of a computer-conferencing component into a first-year study unit in technology management at Deakin University, Australia. It was found that significant variations in computer usage were correlated to student study mode, including source of computer access, source of Internet access, hours-per-week computer usage, regular use of e-mail, regular use of the Internet, number of times the conference was accessed, use of computers for games, and use of computers for learning. Other moderate differences were also noted. Following exposure to the computer conference, on-campus students were more likely to agree that computers could assist their learning, and off-campus students were less likely to agree that learning from computers would be better than classes/lectures.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper reports on the introduction of a computer conferencing  component into a first year study unit in Technology Management at Deakin University, Australia. It was found that significant variations in computer  usage were correlated to student study mode, including source of computer access, source of Internet access, hours per week computer usage, regular use of email, regular use of the Internet, and number of times the conference was accessed. Other moderate differences were also noted. Following  exposure to the computer conference, on-campus students were more likely to agree computers could assist their learning, and off-campus students  were less likely to agree that learning from computers would be better than classes/lectures.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

A key problem in high dimensional anomaly detection is that the time spent in constructing detectors by the means of generateand-test is tolerable. In fact, due to the high sparsity. of the data, it is ineffective to construct detectors in the whole data space. Previous investigations have shown that most essentIal patterns can be discovered in different subspaces. This inspires us to construct detectors in signIficant subspaces only for anomaly detection. We first use ENCLUS-based method to discover all significant subspaces and .then use a greedy-growth algorithm to construct detectors in each subspace. The elements used to constItute a detector are gods Instead of data points, which makes the time-consumption irrelevant to the size of the nonnal data. We test the effectiveness and efficiency of our method on both synthetic and benchmark datasets. The results reveal that our method is particularly useful in anomaly detection in high dimensional data spaces.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is an information technology [IT] enabled approach to managing design data in the AEC/FM (Architecture, Engineering and Construction/ Facilities Management) industry. BIM enables improved interdisciplinary collaboration across distributed teams, intelligent documentation and information retrieval, greater consistency in building data, better conflict detection and enhanced facilities management. Despite the apparent benefits the adoption of BIM in practice has been slow. Workshops with industry focus groups were conducted to identify the industry needs, concerns and expectations from participants who had implemented BIM or were BIM “ready”. Factors inhibiting BIM adoption include lack of training, low business incentives, perception of lack of rewards, technological concerns, industry fragmentation related to uneven ICT adoption practices, contractual matters and resistance to changing current work practice. Successful BIM usage depends on collective adoption of BIM across the different disciplines and support by the client. The relationship of current work practices to future BIM scenarios was identified as an important strategy as the participants believed that BIM cannot be efficiently used with traditional practices and methods. The key to successful implementation is to explore the extent to which current work practices must change. Currently there is a perception that all work practices and processes must adopt and change for effective usage of BIM. It is acknowledged that new roles and responsibilities are emerging and that different parties will lead BIM on different projects. A contingency based approach to the problem of implementation was taken which relies upon integration of BIM project champion, procurement strategy, team capability analysis, commercial software availability/applicability and phase decision making and event analysis. Organizations need to understand: (a) their own work processes and requirements; (b) the range of BIM applications available in the market and their capabilities (c) the potential benefits of different BIM applications and their roles in different phases of the project lifecycle, and (d) collective supply chain adoption capabilities. A framework is proposed to support organizations selection of BIM usage strategies that meet their project requirements. Case studies are being conducted to develop the framework. The results of the preliminary design management case study is presented for contractor led BIM specific to the design and construct procurement strategy.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

One of the major challenges of MIS activities is the difficulty in measuring the effectiveness of delivered systems. The principal purpose of my research is to explore this field in order to develop an instrument by which to measure such effectiveness. Conceptualisation of Information System (IS) Effectiveness has been substantially framed by DeLone and McLean's (1992) Success; Model. But with the innovation in Information Technology (IT) over the past decade, and the constant pressure in IT to improve performance, there is merit in undertaking a fresh appraisal of the issue. This study built on the model of IS Success developed by DeLone and MeLean, but was broadened to include related research from the domains of IS, Management and Marketing. This analysis found that an effective IS function is built on three pillars: the systems implemented; the information held and delivered by these systems; and, the service provided in support of the IS function. A common foundation for these pillars is the concept of stakeholder needs. In seeking to appreciate the effectiveness: of delivered IS applications in relation to the job performance of stakeholders, this research developed an understanding of what quality means in an IT context I argue that quality is a more useful criterion for effectiveness than the more customary measures of use and user satisfaction. Respecification of the IS Success Model was then proposed. The second phase of the research was to test this model empirically through judgment panels, focus groups and interviews. Results consistently supported the structure and components of the respecified model. Quality was determined as a multi-dimensional construct, with the key dimensions for the quality of delivered IS differing from those used in the research from other disciplines. Empirical work indicated that end-user stakeholders derived their evaluations of quality by internally evaluating perceived performance of delivered IS in relation to their expectations for such performance. A short trial explored whether, when overt measurement of expectations was concurrent with the measurement of perceptions, a more revealing appraisal of delivered IS quality was provided than when perceptions alone were measured. Results revealed a difference between the two measures. Using the New IS Success Model as the foundation, and drawing upon the related theoretical and empirical research, an instrument was developed to measure the quality/effectiveness of delivered IS applications. Four trials of this instrument, QUALIT, are documented. Analysis of results from preliminary trials indicates promise in terms of business value: the instrument is simple to administer and has the capacity to pinpoint areas of weakness. The research related to the respecification of the New IS Success Model and the associated empirical studies, including the development of QTJALIT, have both contributed to the development of theory about IS Effectiveness. More precisely, my research has reviewed the components of an information system, the dimensions comprising these components and the indicators of each, and based upon these findings, formulated an instrument by which to measure the effectiveness of a delivered IS.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This paper reviews the technical features and requirements of Building Information Modelling (BIM)-servers as collaboration platforms for multi-disciplinary building and construction projects. Multi-disciplinary collaboration is the norm in the Architecture, Engineering, and Construction (AEC) industries, especially in complex projects. The widespread adoption of object-oriented Computer-aided Design (CAD) tools that support BIM capabilities has generated greater interest in model based exchange of information across disciplines and consultants who have traditionally collaborated through the frequent exchange of 2D drawings and documents. BIM-servers are collaboration platforms that are expected to provide the technical capability to support this inter-disciplinary exchange of 3D models in addition to intelligent management of the related drawings, documents and other forms of data. Since BIM-servers are a recent technical development a review of their technical features can help further development. This paper serves this objective by providing a review of the technical features and requirements for using BIM-servers as multi-disciplinary collaboration platforms on building and construction projects. The methodologies include focus group interviews (FIGs) with representatives from the diverse AEC disciplines, a case study on a state-of-the-art BIM-server, and a critical review and analysis of current collaboration platforms that are available to the AEC industries. This paper concludes that greater emphasis should be placed on supporting technical requirements to facilitate technology management and implementation across disciplines. Their implications for user-centric technology development in design and construction industry are also discussed.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The maximum potential potential alignment between business and IT is constrained by the mutually interacting factors of communications, shared understanding, trust, use of an appropriately scaled project and risk management methodology, distributed business ownership of all its processes and a pervasive IT ownership of every technology-enables business process.