55 resultados para cost control

em Deakin Research Online - Australia


Relevância:

70.00% 70.00%

Publicador:

Relevância:

70.00% 70.00%

Publicador:

Resumo:

 Novel computational intelligence-based methods have been investigated to quantify uncertainties prevalent in the operation of chemical plants. A new family of predication interval-based controlling algorithms is proposed and successfully applied to chemical reactors in order to minimise energy consumption and operational cost.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

The rapid development of virtual reality offers significant potential for skills training applications. Our ongoing work proposes virtual reality operator training for the micro-robotic cell injection procedure. The interface between the operator and the system can be achieved in many different ways. The computer keyboard is ubiquitous in its use for everyday computing applications and also commonly utilized in virtual reality systems. Based on the premise that most people have experience in using a computer keyboard, as opposed to more sophisticated input devices, this paper considers the feasibility of using a keyboard to control the micro-robot for cell injection. In this study, thirteen participants underwent the experimental evaluation. The participants were asked to perform three simulated trial sessions in a virtual micro-robotic cell injection environment. Each session consisted of ten cell injection trials and relevant data for each trial were recorded and analyzed. Results showed participants' performance improvement after the three sessions. It was also observed that participants intuitively controlled multiple axes of the micro-robot simultaneously despite the absence of instruction on how to do so. This continued throughout the experiments and suggests skills transfer from other keyboard based interactions. Based on the results provided, it is suggested that keyboard control is a feasible, simple and low-cost control method for the virtual micro-robot.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This book provides comprehensive coverage of issues that facility managers in the property industry need to understand and apply in the pursuit of value for money over the life span of built facilities. The authors introduce the fast-growing discipline of facility management, examine the core competencies that facility managers should possess and study different contemporary drivers of change. The book emphasises the need to consider facilities management issues at the pre-design stage of the construction process, rather than only when the building is completed, in order to maximise value for money.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The research aimed to investigate the effect an increase in water prices would have on construction. It was found that while there is a considerable amount of water embodied in construction the actual effect of a water tax on construction would be minimal unless implemented at the highest rate.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

With the inevitable increase in size and complexity of construction projects, the need for proper control is increasing. Considering the fact that each project strives for excellence, numerous studies have been conducted over the years to measure performance and investigate factors that are really critical towards project success. Earned Value Management is a project performance evaluation technique which enables industry professionals to closely monitor project performance in both time and cost .The aim of this paper is to examine the result of proper Earned Value Management (EVM) implementation on different project life cycle (PLC) and validate the impact on project success.

The study investigates different success factors in construction industry with special focus on previous researchers’ work which studied the importance of cost control in project success especially in fragmented industry like construction, followed up with three different case studies to analyze the positive impact of EVM implementation on construction projects. Furthermore, for data triangulation purpose, case study analysis will be supported by interviews with specialists working in the UAE construction industry to cross check the outcomes of previous researches.
The research shows that EVM application on cost control in construction projects is not only a crucial management task which is a key to the success of the business but also its influence on project success depends on the time of implementation. It requires a number of up-to-date input data consistently throughout the construction phase. Assigning the right budgets, calculating accurate estimates and monitoring actual costs throughout different project stages are the three main drivers of an effective control through PLC staring from inception stage till completion. EVM proved to be of vital importance due to alarming escalation of construction costs which needs to be especially monitored and controlled. Senior management support and availability of professional staff to execute cost control systems are key factors towards successful implementation

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Wetland and floodplain ecosystems along many regulated rivers are highly stressed, primarily due to a lack of environmental flows of appropriate magnitude, frequency, duration, and timing to support ecological functions. In the absence of increased environmental flows, the ecological health of river ecosystems can be enhanced by the operation of existing and new flow-control infrastructure (weirs and regulators) to return more natural environmental flow regimes to specific areas. However, determining the optimal investment and operation strategies over time is a complex task due to several factors including the multiple environmental values attached to wetlands, spatial and temporal heterogeneity and dependencies, nonlinearity, and time-dependent decisions. This makes for a very large number of decision variables over a long planning horizon. The focus of this paper is the development of a nonlinear integer programming model that accommodates these complexities. The mathematical objective aims to return the natural flow regime of key components of river ecosystems in terms of flood timing, flood duration, and interflood period. We applied a 2-stage recursive heuristic using tabu search to solve the model and tested it on the entire South Australian River Murray floodplain. We conclude that modern meta-heuristics can be used to solve the very complex nonlinear problems with spatial and temporal dependencies typical of environmental flow allocation in regulated river ecosystems. The model has been used to inform the investment in, and operation of, flow-control infrastructure in the South Australian River Murray.