16 resultados para Mound-builders

em Deakin Research Online - Australia


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Australian brush-turkeys (Alectura lathami) hatch in incubation mounds of organic material and have no parental role models to learn from. When raised in outdoor aviaries, without adults, four of six males built incubation mounds at an early age of 4.5–9 months. The two males without mounds were the only ones without detectable levels of testosterone (T) at 4.5 months, whereas body mass did not explain the presence or absence of mound building. At the age of 11 months, all males had detectable T, including those without mounds. This study also investigated the development of social dominance in males kept in mixed-sex groups for 4.5 months. At this latter age, higher-ranked males tended to have higher T levels (P = 0.076), whereas dominance ranks at 4.5 months were not correlated with body mass or size, either at this age or at hatching. Overall, these results suggest that mound building develops without learning, and there is a relationship between T levels and dominance status as well as the absence or presence of mound building. These findings contribute to discussions on the role of learning in behavioural development and the role of T and body mass in avian life history.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The lack of attention to quality control by house builders in the Australian State of Victoria has been a contentious issue for more than two decades. Ina an attempt to improve the quality of housing, various mechanisms such as voluntary and compulsory registration schemes have been adopted and discarded by industry-based organisations and government. While builders are encouraged to improve construction quality, little is known and published about the quality of housing produced by owner builders specifically during the seven year warranty period after construction is completed. With this in mind, this thesis presents research findings that compare the latent defects in houses built by owner builders with those of registered builders. Using inspection reports provided by Archicentre a sample of 1772 houses, of which 1002 were owner builders and 770 were registered builders


was used to determine the severity, the incidence, and location of defects within each house type. Houses less than a year old were found to contain a siginificant proportion of defects for both types of builder. In addition, it was found that HO builders had a mean of 2.74 defects per house and HR builders mean of 2.30 defects per house for the seven-year warranty period. To determine whether there was a significant difference between the quality of housing produced by HO and HR the statistical technique of Chi-squared analysis was undertaken at a 5% level of significance. The analysis revealed that there was a significant difference between the quality of housing procured by owner and registered
builders. In particular, it was found that the important category of workmanship for HO builders had significantly less defects that HR builders, which suggests that HR builders need to improve their managerial practices and the quality of on-site supervision. In essence, this thesis has provided a series of benchmark metrics for latent defects against which current and future legislative programs con be compared for new housing in the State of Victoria. It is recommended that future research focus on the methods for improving the role of the on-site supervisor as they are considered to be the important link in the quality chain.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This is a review of : The unofficial Lego builder's guide, by Allan Bedford, No Starch Press, San Francisco, USA, 2005. ISBN 9781593270544.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The High Court, in the 1995 landmark case of Bryan v Maloney, held a builder of a residential house liable to a subsequent owner for economic loss suffered by way of the reduction in value of the house caused by its defective foundations. Since that decision, several cases in state courts have indicated that any extension of the principle in Bryan to commercial properties is a matter for the High Court. This year, Woolcock Street Investments Pty Ltd v CDG Pty Ltd provided the vehicle for the High Court to revisit the Bryan principle in a commercial context. Faced with the question 'can a subsequent owner of a commercial property who discovers faulty foundations sue the builder for the costs of fixing the problem before it causes any physical damage to person or property?', the resounding response from the High Court has been 'no'. Gleeson CJ, Gummow, Hayne and Heydon JJ in a joint judgment and McHugh J and Callinan J in separate judgements rejected any 'extension' of the Bryan principle to commercial premises. Much to the relief of the construction industry, the Court made it clear that it will be difficult for a subsequent owner to make out a case in negligence against the original builder unless it can show special vulnerability to the risk of injury. Kirby J, in a dissenting judgment, suggested that the extension of liability to commercial builders fits quite comfortably with general principles and lamented the 'incremental' approach to liability presently favoured by the Court. Consequent upon the retirement of Gaudron J, Kirby J appears to be a lonely light on the hill, shining a solitary beacon on matters of principle.

The revisitation of Bryan has long been anticipated. However, Woolcock does not provide the solid bricks and mortar craved by the construction industry. Close examination of the reasoning of the Court suggests that it may itself rest on faulty foundations. In his dissenting judgment, Kirby J questions some of the assumptions made by the majority and highlights the deficiencies of the 'stated case' procedure for a re-examination of this particular area of law, thus suggesting that Woolcock may not be completely sound.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The lack of attention to quality control by house builders has been a contentious issue for more than three decades. In an attempt to improve the quality of housing, various mechanisms have been adopted and discarded by industry-based organizations and government legislation. Now that registration of builders has been achieved (since 1995) the regulating authority, the Building Commission have placed the maintenance of standards from registered builders at the forefront of their priorities. The provision of suitable training and continuing professional development programs is likely to receive greater attention over the next few years. However, a key factor that is often overlooked in the debate on quality of house construction is the use of subcontract labour by both, registered builders and owner builders. The repetitive nature of some activities ensures that tacit knowledge within the subcontract system becomes an integral part of house construction. Research by the authors into defects in housing has provided some interesting analyses from the statistic collected. This paper analyses the incidence of defects over a number of years in a range of functional elements within the house envelope and presents the results. Particular attention is paid to the incidence of defects where the licensed trades are involved compared to the non-licensed trades and elements. This work suggests where housing defects are likely to occur and the authors suggest that appropriate educational resources may be directed to areas where it will be most effective and beneficial. The authors propose a more integrated and inclusive approach.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This XXlst Annual Conference of SAHANZ offers a timely opportunity for celebrating and critically reflecting on Federation Square, Melbourne - a project that continually crosses the line between the purely experimental and the built form (A Benjamin, 2003) and offers an opportunity to identify and investigate the different, often competing, limits within the discipline of architecture. Here in this project, considered by the city of Melbourne to point to its future aspirations; and by the RAIA as demonstrating 'the strength of design and the leap into the unknown which is where good design always comes from' (I McDougall, 2003), different approaches to the possibilities of 'limit' as a contemporary concern can be fruitfully explored. Architectural masterpieces are daringly imaginative and each in their own way challenges architects, engineers, builders and technologists - those who are to realise the dream - and makes administrators, politicians and governments put their credibility on the line. So how does Federation Square contribute to contemporary architectural debate, specifically to Melbourne architecture? How has it dealt with thresholds? Where has It approached, crossed and/or exceeded boundaries? This paper will deal with design aesthetics in the realisation of the Lab architects 'vision' in the context of historical, urban and political realities. Analysis will provide insights into the limitations imposed upon this architectural project and the limitations it now, in turn, imposes on the city. Two aspects will be dealt with: understanding Lab's overall vision, and juxtaposing the vision with the reality of Federation Square. The author's interview with Don Bates, principal Lab architecture studio, forms the frame argument about Federation Square in this paper.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Building environmental services can often be categorised as ‘one of the least desirable courses’ in the curriculum of architecture and building. Nevertheless, it is also one of the most important and confronting subjects in the procurement of real building projects. The principal message to designers is that of spatial requirements while to the builders it may become one of capital cost, installation specifications and maintenance of equipment. Getting these concepts across in a creative, yet project oriented, manner can be challenging to the students and to the lecturer. This paper presents the developments of ten years of teaching the subject, as well as the methods of delivery which have proven to be successful.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

VINCENT Buckley's Golden Builders and Other Poems (1976) is an important poetic experiment in its direct and exulted address to the city and to the sacred. The city is Melbourne in which Buckley lived, worked and wrote for forty years. In the original volume, the epigraph to the twenty-seven part sequence 'Golden Builders' is from William Blake's Jerusalem, a profound and idiosyncratic yoking together of the corporeal and the sacred

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Building Code of Australia seeks to establish “nationally consistent, minimum necessary standards of relevant, health, safety (including structural safety and safety from fire), amenity and sustainability objectives efficiently”. These goals are laudable – but where are the goals of quality and maintenance, which are also an essential part of achieving adequate and continuing health and safety for the built environment?

Defects such as dampness, settlement and cracking, staining, wood rot, termite damage, rusting, and roof leakage are common enough to suggest that there are still issues with building quality in housing. They are caused by a combination of initial poor workmanship and poor quality materials and latterly by poorly executed or inadequate maintenance.

Local architecture, developed over many years of trial and error, produce buildings linked to their climate and local materials (think of the typical “Queenslander” house). Today’s architecture imports technologies and materials from many differing countries and climates – that are not necessarily suitable for the location, nor is there necessarily the same quality control over the material quality and production. Inappropriate use and inadequate understanding of new materials and techniques can lead to the generation of further defects.

Whilst the building code contains provisions for initial-build material quality and workmanship, there is no continuing control over a house over its life span. Reliance is placed on advertising the need, for example, to employ qualified tradespeople; replace batteries in smoke detectors; and other good advice to help maintain housing to a minimum standard. Is this sufficient?

Mechanisms to make the transfer of knowledge to those who need to use it – be it the workforce or the houseowner – need to be improved. Should the building code be more visual and accessible in it’s content? Should the building code include provisions for maintenance? Should the building code require every house to have a “users manual” – much like a car? An extensive review of literature identifies the scale of the problem of poor quality housing and highlights some suggested causes – inadequate knowledge of the BCA by general housebuilders being one. However little work has been done to investigate what could be done to improve the situation. This work suggests that improvements to knowledge transfer would improve the quality of housing and a model of the knowledge transfer process is proposed, identifying those areas where the knowledge flows need to occur that would impact both the builders and users of housing.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Australian housing industry is beset with quality issues with repeated building defects causing problems with customer satisfaction and housing performance. These defects are caused by a combination of initial poor workmanship and poor quality materials and subsequently by poorly executed or inadequate maintenance. These poor work practices increase the cost and maintenance of housing. The waste and rectification work generated by such practices means that the housing industry generally is not engaged with sustainability. Building Control is part of achieving quality of building output. Whilst the Australian Building Code has regulations for initial-build material quality and workmanship, there is no continuing control and effective enforcement over a house over its life span. Sustainability is not dealt with as a topic at all in the Building Code with only energy efficiency concerns regulated. Inadequate knowledge transfer, to the mainly small builders who produce the majority of Australia’s housing, is seen to be a key issue. Mechanisms to make the transfer of knowledge to those who need to use it need to be improved. Building regulations, for example, could be more visual and accessible in their content and small builders should be encouraged to update their knowledge and skills. This comparative research will guide industry service providers in improving their performance and suggest how overall housing quality can be improved (thereby reducing wasteful practices), by considering more appropriate mechanisms for knowledge transfer among industry service providers in the Australian housing industry.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Energy consumption attributed to the residential sector makes up around 8% of the total consumption in Australia. Roughly a third of all houses built in Victoria are done so by the largest 20 builders. These volume builders keep costs down by offering a selection of ‘clone’ designs from which the client can choose, however they lose the site-specific customisation which is required for effective passive design in favour of a one-size-fits-all approach where designs are developed to a point where they can satisfy just the minimum requirements in a range of orientations and site locations. The Australian government has implemented regulations regarding the minimum efficiency standards for housing and these initiatives to limit the carbon emissions have brought the question of energy use to the table, yet are they enough? This paper will explore the concept of cloned house designs in terms of energy efficiency and optimal siting and through computer simulation, evaluate how a cloned house design performs under different site conditions in Victoria.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Reliable forecasting as to the level of aggregate demand for construction is of vital importance to developers, builders and policymakers. Previous construction demand forecasting studies mainly focused on temporal estimating using national aggregate data. The construction market can be better represented by a group of interconnected regions or local markets rather than a national aggregate, and yet regional forecasting techniques have rarely been applied. Furthermore, limited research has applied regional variations in construction markets to construction demand modelling and forecasting. A new comprehensive method is used, a panel vector error correction approach, to forecast regional construction demand using Australia’s state-level data. The links between regional construction demand and general economic indicators are investigated by panel cointegration and causality analysis. The empirical results suggest that both long-run and causal links are found between regional construction demand and construction price, state income, population, unemployment rates and interest rates. The panel vector error correction model can provide reliable and robust forecasting with less than 10% of the mean absolute percentage error for a medium-term trend of regional construction demand and outperforms the conventional forecasting models (panel multiple regression and time series multiple regression model). The key macroeconomic factors of construction demand variations across regions in Australia are also presented. The findings and robust econometric techniques used are valuable to construction economists in examining future construction markets at a regional level.