102 resultados para Infrastructure and Construction Projects

em Deakin Research Online - Australia


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper reviews the technical features and requirements of Building Information Modelling (BIM)-servers as collaboration platforms for multi-disciplinary building and construction projects. Multi-disciplinary collaboration is the norm in the Architecture, Engineering, and Construction (AEC) industries, especially in complex projects. The widespread adoption of object-oriented Computer-aided Design (CAD) tools that support BIM capabilities has generated greater interest in model based exchange of information across disciplines and consultants who have traditionally collaborated through the frequent exchange of 2D drawings and documents. BIM-servers are collaboration platforms that are expected to provide the technical capability to support this inter-disciplinary exchange of 3D models in addition to intelligent management of the related drawings, documents and other forms of data. Since BIM-servers are a recent technical development a review of their technical features can help further development. This paper serves this objective by providing a review of the technical features and requirements for using BIM-servers as multi-disciplinary collaboration platforms on building and construction projects. The methodologies include focus group interviews (FIGs) with representatives from the diverse AEC disciplines, a case study on a state-of-the-art BIM-server, and a critical review and analysis of current collaboration platforms that are available to the AEC industries. This paper concludes that greater emphasis should be placed on supporting technical requirements to facilitate technology management and implementation across disciplines. Their implications for user-centric technology development in design and construction industry are also discussed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Cost and schedule are two of most important performance indicators of construction projects. Cost escalation and time overruns are typically associated with poor management practices. Cost overruns and delays have huge impacts on construction projects in relation to the costs of a project, the reputation of the parties involved, and the satisfaction of the final product. Therefore, it is imperative to understand the causes of cost and time overruns so that mitigation measures can be set in place. A group of industry professionals in South Australia were surveyed on their perceptions of the factors contributing towards the cost and time overruns in commercial construction projects. The results showed that timeliness of decision making is ranked as the top factor contributing towards delays whereas problems with design is perceived as most influential to the cost overruns. In addition, the questionnaire survey found that different parties, i.e. clients, contractors and consultants have different perceptions on the impacts of these factors. Similarly, the structural frame stage was considered the most critical stage for controlling the time and cost performance during the construction process. Implications are discussed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research aims to understand the attitudes and behaviours of stakeholders towards waste management and consequently identify ways of improving waste management practices in construction projects. Semi-structured interviews were conducted. The findings reveal that most of the decisions in construction projects are based on their financial returns unless there is a special requirement to comply with Green Star or any other sustainable building rating system. Even though there is a trend towards environment-friendly construction, contractors are favourable towards methods involving financial incentives. Results also indicate that private developers are more price-driven compared with government clients. Findings reveal the necessity of enforcing legislation to improve waste management practices until such practices become culturally embedded in organizations across the supply chain. Similarly, end users' motivation towards waste management was also identified as a key to encouraging stakeholders of construction projects and improving their attitudes and behaviours towards waste management practices.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Remotely located sites have become more accessible and therefore more valuable and profitable to investors and entrepreneurs. Typically these sites are environmentally sensitive. For the designer, these sites offer a unique challenge conceptually, in terms of the physical and cultural constraints. The built environment research community has yet to seriously take up the challenge of developing theoretical models for the management of the design and construction processes for remotely located projects. Such models would explore efficiency and efficacy management for projects in remote and often hostile areas, in an integrated and sustainable manner. There are varying degrees of remoteness experienced in nearly all construction projects and therefore a clearer definition of the characteristics of remote sites is required. Towards this definition, a typology is initiated for the concept of remotely located construction projects related to environmental sustainability and the management of the design process. The characteristics of the typology are drawn from a selected literature review of the fields of design management and environmental sustainability, and from an exploratory investigation of two case studies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Increasingly Malaysian property and construction firms are seeking to work internationally. Firms enter international markets through various strategies and typically property and construction professionals rely on developing various forms of cooperative and collaborative arrangements. The common modes of entry include international alliances, project joint ventures, partnerships, company joint ventures and large consortiums; which arise as a response to clients seeking expressions of interests from the international community or the firms seeking to internationalise approaching clients and/or potential host country partners. Increasingly project teams on international mega projects are composed of multiple key partners from different countries coming together to achieve a higher level of strategic flexibility. Establishing and maintaining local connections and business networks are therefore critical to ensure the success of exporting firms. This paper reports the findings of a project which explores factors affecting the performance of Malaysian property and construction professionals working internationally through effective joint ventures. The project seeks to develop a performance measurement framework to examine the extent to which Malaysian firms are developing sustainable business models internationally which adapt and respond to changing conditions. A generic framework was initially developed prior to this study through a grounded theory approach merging theory from internationalisation, design management and market knowledge literature followed by a case study empirical investigation and then further literature review based upon the themes which emerged from the case study analysis. A reflexive capability model for firms in managing both economic and non-economic capital; including social, cultural and intellectual capital was developed. This project seeks to build upon the reflexive model by adapting it to the unique contexts related to the specific geographic localities of exporting Malaysian firms. Specifically, the project explores the extent to which the performance measurement framework can be used to map capabilities Malaysian construction firms have and Which they need to develop in relation to developing and maintaining international collaborative partnerships. The preliminary results of one case study Malaysian architectural firm are discussed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

With a focus on different aspects of stakeholder management, various sets of critical success factors (CSFs) have been suggested in the literature. It is crucial to explore the relative importance and groupings of these factors. This paper aims to identify CSFs associated with stakeholder management in construction projects, and explore their ranking and underlying relationship. 15 CSFs were identified through a literature review, and consolidated by interviews and pilot studies with professionals in construction industry. A questionnaire instrument containing these 15 CSFs was sent out to project managers in Hong Kong, and 183 completed questionnaires were retrieved. The top three ranked factors for stakeholder management were "managing stakeholders with social responsibilities", "assessing the stakeholders' needs and constraints to the project", and "communicating with stakeholders properly and frequently". Using factor analysis and considering the high importance of the factor "managing stakeholders with social responsibilities", the 15 CSFs were grouped into five dimensions namely, precondition factor, stakeholder estimation, information inputs, decision making, and sustainable support. All these five groupings and their relationship were included in a framework for successful stakeholder management in construction projects. These findings help to clarify what the high prioritized factors are, and could also be used as an assessment tool to evaluate the performance of stakeholder management and thus help to identify areas for improvement.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Studies on market convergence are well considered in the literature. However, the majority of the previous research focused on housing markets and few studies have concentrated on construction markets. Owing to a simultaneously dramatic increase in the construction prices of the sub-markets in the building construction sector in Australia, this paper aims to identify the convergence among these markets, involving house construction market, other-residential building construction market, and non-residential building construction market. To achieve it the Granger causality test and generalized response function depending on the vector error correction model with the quarterly data of Australia’s eight states from 1998 to 2010 will be applied. Based upon the econometric tests, the price diffusion patterns among these construction markets have been identified. Research on the convergences of construction markets not only helps construction firms perform well in business operations and arbitrage activities, but also provides policy makers with useful information for enacting effective construction policies for national perspectives and approaches to infrastructure planning.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Objective
To examine how adults use new local walking and cycling routes, and what characteristics predict use.

Methods
1849 adults completed questionnaires in 2010 and 2011, before and after the construction of walking and cycling infrastructure in three UK municipalities. 1510 adults completed questionnaires in 2010 and 2012. The 2010 questionnaire measured baseline characteristics; the follow-up questionnaires captured infrastructure use.

Results
32% of participants reported using the new infrastructure in 2011, and 38% in 2012. Walking for recreation was by far the most common use. In both follow-up waves, use was independently predicted by higher baseline walking and cycling (e.g. 2012 adjusted rate ratio 2.09 (95% CI 1.55, 2.81) for > 450 min/week vs. none). Moreover, there was strong specificity by mode and purpose, e.g. baseline walking for recreation specifically predicted walking for recreation on the infrastructure. Other independent predictors included living near the infrastructure, better general health and higher education or income.

Conclusions
The new infrastructure was well-used by local adults, and this was sustained over two years. Thus far, however, the infrastructure may primarily have attracted existing walkers and cyclists, and may have catered more to the socio-economically advantaged. This may limit its impacts on population health and health equity.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Taylor Family Digital Library is the central library opened in 2011 at the University of Calgary dedicated to supporting digital scholarship, creativity, analysis and a supportive learning environment for students. The new building is a technologically advanced converged cultural institution, with mandates to continually evolve in order to meet the needs of students and researchers. The infrastructure to support these mandates required research, collaboration and intense planning, resulting in new construction and technology standards for library renovation and construction projects. This pragmatic article is written for those who will follow in similar footsteps; it provides a roadmap for those embarking on the construction of a new technologically advanced library building.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is twofold. First, it aims to highlight the main factors and items affecting the productivity of construction projects, based on the perceptions of CEOs in construction companies in Iran. Second, the study compares the elicited CEOs’ perceptions against the findings of studies based on the views of such as project managers, middle managers and employees in other levels. Design/methodology/approach – The study drew upon literature on construction work to develop a conceptual model. Further, a total of 60 CEOs from road construction companies were surveyed using a five-point Likert scale questionnaire to generate the data. The collated data were categorised and ranked according to the CEOs perceived level of importance using the relative importance index. Findings – The findings highlight the main factors and items affecting labour productivity in construction projects in Iran as perceived by CEOs, which are mainly of human resources management nature and could be attributed to motivation and managerial policy aspects. The study also recognises that factors associated with the working environment particularly safety and health are perceived as insignificant by Iranian CEOs which could be a concern for the Iranian construction industry. The discussions shed some light on the discrepancies between the perceptions of CEOs and previous studies in regards to major determinants of productivity in the construction context. Originality/value – This study is the first study aiming at discussing the perceptions of CEOs of construction companies active in construction projects in Iran. As such, the study highlights the standpoint of the main decision makers in construction companies in regards to labour productivity in the construction sector. Thus, the key contribution of the present study is providing insight into the perceptions of CEOs, who play the most vital role in strategic development of construction companies whereas previous studies have mostly focused on project or middle managers having a lower influence in determining the strategic plans of companies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction waste generation has been identified as one of the major issues in the construction industry due to its direct impacts on the environment as well as the efficiency of the construction industry. As the industry cannot continue to practice if the environmental resources on which it depends are depleted, the significance of waste management needs to be understood in order to encourage stakeholders to achieve related goals. Therefore, this research aims to determine effective approaches to eliminate and/or minimise waste generation in construction projects. Mixed methods were adopted by combining qualitative and quantitative research approaches. Interviews and a questionnaire survey were conducted as the primary data collection methods. The findings reveal twenty six critical solutions for waste management. Five factors of solutions for waste management were extracted from the exploratory factor analysis. These factors were: team building and supervision; strategic guidelines in waste management; proper design and documentation; innovation in waste management decisions; and lifecycle management. The evidence from this study suggests that both technologies and attitudinal approaches require improvement to eliminate/minimise waste generation in construction projects. Similarly, attention should be paid to being mindful of the environmental effects of waste generation and avoiding waste generation as early as possible in construction projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry has been found to be a major generator of waste and there are many challenges associated with finding the most sustainable way to manage construction waste. As the construction industry is a project based industry, it is essential to look at cultural issues related to waste management at the project level. Therefore, this research aims to identify the current status of waste management practices in construction projects by analysing project managers’ views on waste management performance in construction projects; project managers’ attitudes towards waste management; and project managers’ views on waste management culture in construction projects. A questionnaire survey was carried out and project managers were selected as a target group to distribute questionnaires, as project managers have a vital involvement in promoting and maintaining project culture in the construction project environment. Data was analysed using descriptive statistics and the Kruskal-Wallis test. The findings reveal that project managers believe that even though the operational cost of waste minimisation is high in construction projects, overall waste management is profitable. At the same time it was interesting that even though project managers believe most project participants are satisfied with existing waste management systems, overall waste management efforts are not perceived as being at a satisfactory level in construction projects. Project managers consider waste as an inevitable by-product, but they do not believe that waste management is beyond the control of project members or that waste has no value. At the same time, it was found that project managers infer that project participants are cost and time conscious in waste management despite the roles, responsibilities and duties of each party in waste management not being well-coordinated or fully understood. Taken together, these findings highlight the misconceptions related to waste management in construction projects and emphasise the necessity of collective responsibility on the part of project participants to enhance the performance of waste management in construction projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this study was twofold: (1) Identifying the risks that are critical for risk management of road construction projects in Sri Lanka on a life cycle basis and (2) defining the shares of the parties involved in projects in terms of handling the identified risks. A Delphi study was conducted among 33 Sri Lankan experts (consultants, project managers, contractors) in three rounds. The findings showed that the construction and design phases are prone to many major risks. Moreover, ‘delays in payment by the client’ was the most critical risk factor in the construction stage. Furthermore, it was established that some major risks could occur in more than one phase of the project life cycle, stressing the necessity of handling these risk factors as a prerequisite for project success. The discussions presented in this study would enhance the effectiveness of implementing risk management practices in Sri Lankan road construction projects. From a broader vantage point, it will also serve the risk management body of knowledge in the construction industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The intense competition between the Iranian construction companies has led them to take all appropriate measures to decrease the costs as much as possible. Hence, due to the pivotal role of human resources in construction projects cost, a major part of Iranian construction companies seek their profitability and survival in maximizing the productivity of their operatives. Because of the widespread belief among contractors about the low productivity of daily workers and operatives with basic salary, they commit a major part of their projects activities to sub-contractors. Deployment of sub-contractors by construction firms has become largely conventional in country's construction projects. The aims of this paper is defined as determining the factors and grounds affecting sub-contractors productivity and evaluate their overall negative side effects on project productivity via a structured questionnaire. A total of 31 factors selected and were divided into 7 broad categories. The perceptions of companies managers were asked about the level of effect brought about by the mentioned factors and groups upon productivity on a time based criterion. The analysis indicated that the most important grounds affecting sub-contractors productivity in descending order include: Materials/Tools, Construction technology and method, Planning, Supervision system, Reworks, Weather, and Jobsite condition. Project managers should focus on the identified major grounds and relevant factors in order to improve productivity as long as they commit construction activities to sub-contractors. © 2012 Copyright Vilnius Gediminas Technical University (VGTU) Press Technika.