69 resultados para Engineering Asset Management, Optimisation, Preventive Maintenance, Reliability Based Preventive Maintenance, Multiple Criteria Decision Making

em Deakin Research Online - Australia


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Engineering asset management organisations (EAMOs) are increasingly motivated to implement business intelligence (BI) systems in response to dispersed information environments and compliance requirements. However, the implementation of a business intelligence (BI) system is a complex undertaking requiring considerable resources. Yet, so far, there are few defined critical success factors (CSFs) to which management can refer. Drawing on the CSFs framework derived from a previous Delphi study, a multiple-case design was used to examine how these CSFs could be implemented by five EAMOs. The case studies substantiate the construct and applicability of the CSFs framework. These CSFs are: committed management support and sponsorship, a clear vision and well-established business case, business-centric championship and balanced team composition, a business-driven and iterative develop ment approach, user-oriented change management, a business-driven, scalable and flexible technical framework, and sustainable data quality and integrity. More significantly, the study further reveals that those organisations which address the CSFs from a business orientation approach will be more likely to achieve better results.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Implementation of integrated catchment management (ICM) is hampered by the lack of a conceptual framework for explaining how landowners select farming systems for their properties. Benefit–cost analysis (a procedure that estimates the costs and benefits of alternative actions or policies) has limitations in this regard, which might be overcome by using multiple-criteria decision analysis (MCDA). MCDA evaluates and ranks alternatives based on a landowner's preferences (weights) for multiple-criteria and the values of those criteria. A MCDA approach to ICM is superior to benefit–cost analysis which focuses only on the monetary benefits and costs, because it: 1) recognizes that human activities within a catchment are motivated by multiple and often competing criteria and/or constraints; 2) does not require monetary valuation of criteria; 3) allows trade-offs between criteria to be measured and evaluated; 4) explicitly considers how the spatial configuration of farming systems in a catchment influences the values of criteria; 5) is comprehensive, knowledge-based, and stakeholder oriented which greatly increases the likelihood of resolving catchment problems; and 6) allows consideration of the fairness and sustainability of land and water resource management decisions. A MCDA based on an additive, multiple-criteria utility function containing five economic and environmental criteria was used to score and rank five farming systems. The rankings were based on the average criteria weights for a sample of 20 farmers in a US catchment. The most profitable farming system was the lowest-ranked farming system. Three possible reasons for this result are evaluated. First, the MCDA method might cause respondents to express socially acceptable attitudes towards environmental criteria even when they are not important from a personal viewpoint. Second, the MCDA method could inflate the ranks of less profitable farming systems for the simple reason that it allows the respondent to assign non-zero weights to non-economic criteria. Third, the MCDA might provide a better framework for evaluating a landowner's selection of farming systems than the profit maximization model.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper provides a review of research contributions on forest management and planning using multi-criteria decision making (MCDM) based on an exhaustive literature survey. The review primarily focuses on the application aspects  highlighting theoretical underpinnings and controversies. It also examines the nature of the problems addressed and incorporation of risk into forest  management and planning decision making. The MCDM techniques covered in this review belong to several schools of thought. For each technique, a variety of empirical applications including recent studies has been reviewed. More than 60 individual studies were reviewed and classified by the method used, country of origin, number and type of criteria and options evaluated. The review serves as a guide to those interested in how to use a particular MCDM approach. Based on the review, some recent trends and future research directions are also highlighted.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The link between management practices and worker’s motivations impacting construction productivity is being considered as significant among the research community. This research aimed to identify and analyse the underlying attributes impacting construction productivity from the site management perspective. This research presents a framework designed to analyse and quantify the relative relevance of different drivers in the determination of productivity levels and the degree of effectiveness of potential opportunities for improving performance of overall projects. Owing to the complexity of construction projects and underlying conflicting drivers influencing higher worker’s productivity, the Analytical Hierarchy Process (AHP) is employed to deal with interdependent relationships within a multi-criteria decision-making model. In the analytical approach, the large unstructured decision parameters are identified first and then are broken down into the manageable and measurable components using a top down hierarchical structure. This paper demonstrates an example to illustrate how to empirically analyse and prioritise a set of influencing parameters as selection criteria in devising appropriate management practices to ensure higher productivity vis-à-vis optimum performance of projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Contents:
1. Role of multi-criteria decision making in natural resource management /​ Gamini Herath and Tony Prato
2. Analysis of forest policy using multi-attribute value theory /​ Jayanath Ananda and Gamini Herath
3. Comparing Riparian revegetation policy options using the analytic hierarchy process /​ M. E. Qureshi and S. R. Harrison
4. Managing environmental and health risks from a lead and zinc smelter : an application of deliberative multi-criteria evaluation /​ Wendy Proctor, Chris McQuade and Anne Dekker
5. Multiple attribute evaluation of management alternatives for the Missouri River System /​ Tony Prato
6. Multi-criteria decision analysis for integrated watershed management /​ Zeyuan Qiu
7. Fuzzy multiple attribute evaluation of agricultural systems /​ Leonie A. Marks and Elizabeth G. Dunn
8. Multi-criteria decision support for energy supply assessment /​ Bram Noble
9. Seaport development in Vietnam : evaluation using the analytic hierarchy process /​ Tran Phuong Dong and David M. Chapman
10. Valuing wetland aquatic resources using the analytic hierarchy process /​ Premachandra Wattage and Simon Mardle
11. Multiple attribute evaluation for national park management /​ Tony Prato
12. The future of MCDA in natural resource management : some generalizations /​ Gamini Herath and Tony Prato.


Relevância:

100.00% 100.00%

Publicador:

Resumo:

In recent years, building demolition has been challenging urban developers due to the increased incidence of demolition projects and the elevation of demolition requirements. The importance of building demolition is also recognised by researchers and, given its environmental impacts, it is anticipated to achieve the same attention as conventional planning, design,
construction and maintenance in the near future. In this article, the authors aim to develop a series of strategies for promoting building demolition practice. Environmentally-friendly demolition procedures are introduced through a waste minimisation decision that makes the approach on alternatives to demolition and an integrated demolition planning and design approach focus on a just-in-time (JIT) philosophy. A conceptual management framework is also presented for the implementation of demolition projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Recent studies of the experience of the British life insurance industry indicate that a period of transition, and the development of more diversified investment strategies, began in the interwar period. Australian life insurers lagged behind their British counterparts in the introduction of such strategies. This paper investigates why this was the case. It argues that in the Australian market there was both a lack of opportunity and incentive to broaden asset portfolios. However, this did not mean that asset management practices did not advance. Australian life offices became progressively more sophisticated in their approach to portfolio management during this period. Developments in the interwar period provided a grounding for post-war expansion into the equity market.