204 resultados para Construction industry - Evaluation - Australia


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Forecasting is an integral part of all business planning, and forecasting the outlook for housing is of interest to many firms in the housing construction sector. This research measures the performance of a number of industry forecasting bodies; this is done to provide users with an indicator of the value of housing forecasting undertaken in Australia. The accuracy of housing commencement forecasts of three Australian organisations – the Housing Industry Association (HIA), the Indicative Planning Council for the Housing Industry (IPC) and BIS-Shrapnel – is examined through the empirical analysis of their published forecasts supplemented by qualitative data in the form of opinions elicited from several industry “experts” employed in these organisations. Forecasting performance was determined by comparing the housing commencement forecast with the actual data collected by the Australian Bureau of Statistics on an ex-post basis. Although the forecasts cover different time periods, the level of accuracy is similar, at around 11-13 per cent for four-quarter-ahead forecasts. In addition, national forecasts are more accurate than forecasts for individual states. This is the first research that has investigated the accuracy of both private and public sector forecasting of housing construction in Australia. This allows users of the information to better understand the performance of various forecasting organisations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

During the past few decades, the construction industry has experienced a series of changes including the innovation of construction technologies and the enhancement of management strategies. These improvements should have had a considerable effect on industrial efficiency and productivity performance, but research is needed to address whether the capital productivity levels of the construction industry have in fact shown such a huge improvement. This paper aims to develop an analysis procedure to measure capital productivity changes and to reasonably quantify factors affecting productivity levels in the construction industry. Based on the data envelopment analysis method, this research has developed a novel model measuring capital productivity and has applied it to the Australian construction industry. The numerical results indicate that the average annual capital productivity levels of the construction industry are slowly growing in all the Australian states and territories except for Queensland and Western Australia. In addition, construction technologies are shown to have a close relationship with the changes in capital productivity according to the temporal-spatial comparisons of productivity indices. The research findings are expected to be beneficial for making policy and strategic decisions to improve the capital productivity performance.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

SME play a major role in the economies and TQM is important in construction industry. The aim of this paper is to investigate, via extensive literature reviews, the management implication of Australian construction SME implementing TQM. In summary, there are four management perspectives: construction management, knowledge management, supply chain management and marketing management to enhance competitive advantage that may favour commercial viability. One can reasonably conclude that the quality improvements will greatly help to create long term commercial advantages.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Alliances are complex projects with high levels of risk and uncertainty. Despite the pain share and gain share commercial arrangement in alliances, Trust is still an issue between the Alliancing Leadership Team (ALT) and Alliancing Management Team relationship (AMT). Although the concept and components of trust have been discussed by various researchers, the characteristic of trust under different situations has not been tested within the procurement research domain. Based on semi-structured interviews with the members of the ALT and AMT of an alliance project in Australia the underlying trust based relationships between the AMT and ALT were investigated using the Soft Systems Methodology (SSM). Results demonstrate that cognitive, affect, system and cognitive-affect based trust are mediated by common good, needs, sharing, breach temptation and mishap situations. This research demonstrates that the adversarial culture of the Australian construction industry cannot be changed by the implementation of trust principles alone. The culture of suspicion dominating the ideological view of the construction industry requires organizational learning between alliance parties to execute appropriate behaviours, aligned with the alliancing philosophy, to effectively achieve ideal collaboration.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Undergraduate education in Quantity Surveying (QS) and Construction Management (CM) in Australia has traditionally incorporated concurrent industry experience as an important requisite prior to graduation. This has been primarily driven by accrediting professional associations but most universities have also recognized the value of this cooperative approach to education with industry. However, in recent years many universities have become concerned about the amount of time that students are spending in industry employment to the point where, for some students, their employment takes precedence over their academic studies. Past research has shown that working long hours has a negative effect on the study patterns of undergraduate students. This paper presents the results of research undertaken to examine the amount of time that Quantity Surveying and Construction Management students actually spend engaged in paid work during semester time and the impact on their studies. The methodology for the research was based on two separate questionnaire surveys distributed to undergraduate Quantity Surveying and Construction Management students at 7 universities across Australia. The questionnaires focused on the nature and extent of their paid work while enrolled in full-time study. The results indicate that students in the early stages of their program tend to undertake casual work that is not related to their degree but move to construction industry employment in the later stages of their program. The research found that students were spending an average of 18 hours per week in industry employment with this average increasing to over 23 hours in their final year. A number of students were spending well over 30 hours per week in industry employment. The implications of the extent of this concurrent industry employment are discussed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The performance level of construction industry in the UK is generally considered to be low. The reasons for this situation are twofold, firstly due to the temporary organisational structure of construction team and secondly the inefficient construction process. Previous research in this area has focused on developing a generic model to represent the construction process. It is necessary to develop a process model, which clearly identifies the roles and responsibilities of the major parties on the building team and identifies the key issues within the project cycle. The method for presenting this model is by using an expert system. The primary aim of this paper is to discuss the development of the CONstruction Best Practice System (CONBPS). The theoretical framework of CONBPS and the development and evaluation of the system will be described. The future research will also be discussed. Finally, the advantage of this model will be identified.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Governments in Australia face the challenge of meeting the growing demand for new infrastructure, which can be delivered more quickly in an increasingly complex environment. Alliance Contracting has been introduced to overcome some of the challenges by, aligning the incentives of the partners, clearly defining their rights and responsibilities, and providing the means for resolving disputes when they arise. The purpose of this research was to explore the critical success factors of Alliance Contracting in order to understand the roles of the various terms and conditions and how they fit together to create a relationship-based contract. A qualitative technique of semi-structured in-depth interviews was used to gather primary data in response to the research questions. The research aimed to develop an in-depth understanding of Alliance Contracting. The results show that the key contributor to the success or failure of Alliances is whether all the partners benefit equitably from the venture. Analysis of the data indicates that, in general, trusting attitudes/behaviour is perceived to be the most important critical success factor for Alliance Contracting in the broader construction industry. The second most popular critical success factor was shared and aligned goals. The third issue was the evidence of open behaviour, and the final issue was the presence of shared knowledge. The implication of this research is that there are several key factors that were necessary preconditions for successful Alliances.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study describes the development of a decision framework to support multi-disciplinary information and knowledge management model which focuses on integrated design and delivery solutions for all construction supply chain actors. The framework was developed within the context of two national information technology research projects in Australia. The first study used diffusion theory to explain the barriers and enablers to future adoption of advanced information technology solutions such as building information modelling (BIM). A grounded theory methodology was deployed and a pathways model for innovative information technology diffusion accommodating diverse patterns of adoption and different levels of expertize was developed. The second study built on the findings of the first study but specifically focussed on innovators, early and late adopters of BIM and the development of a decision framework towards advanced collaborative platform solutions. This study summarizes the empirical results of the previous studies. The core of the decision framework is the creation, use and ownership of building information sub-models and integrated models. The decision framework relies on holistic collaborative design management. Design expertise is diffused and can be found in various locations along the construction supply chain within project teams. A wide definition of design is considered from conceptual to developed to detailed design. The recent development to the decision model offers much potential as the early upstream decisions are often made in a creative, collaborative and uncertain environment. However, decision making needs to balance both a reductionist and exploratory creative empowerment approach. Shared team expertise and competency and team mental models are explored as a fundamental requirement to collaborative BIM. New skills in interdisciplinarity are discussed as an implication of future construction industry collaborative platforms.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Legislation and standards are alleged to be one of the key solutions for improving accessibility and Universal Design implementation in Malaysia including its implementation in housing design. In response to this concern, the government of Malaysia has taken considerable steps in articulating professional practice obligations as demonstrated in continual improvements in relevant new laws and standards (Malaysian Standard (MS)). The findings from a preliminary study have however evidenced a clear gap between having laws and standards and ensuring their implementation in the construction industry. This paper reviews the issues faced by the existing Malaysian enforcement and practices to Universal Design. The findings emphasise awareness, understanding and practice implications for the legislation and its standards in Malaysia, and problems and assumptions perceived. Findings indicate that there is lack of understanding and awareness of the current legislation and standards in the construction industry, in addition to the insufficiency of comprehensive guidelines to regulate Universal Design in Malaysia.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The late-2000s global financial crisis has wrought dramatic impacts on the construction industry. However, the issue of whether the crisis influenced the behaviours of the construction industry has not been addressed yet. This research presents an econometric approach to investigating the effects of the recent global financial crisis on construction labour productivity. By employing the error correction model and panel regression methods, the direct and indirect effects of the financial crisis on the changes in Australian construction labour productivity are explored at national and state levels. Neither the direct nor the indirect effects appear statistically significant. The results indicate that the direct effect of the financial crisis drives up construction labour productivity at the national level, while the indirect effect diminishes productivity. The effects of the financial crisis on the state construction labour productivity vary from state to state. The financial crisis influenced construction labour productivity directly and significantly in the northern and eastern regions, while the direct effects appear not significant in the other states and territories. The indirect effects of the financial crisis on productivity are statistically significant in three regions: the Australian Capital Territory, the Northern Territory and Western Australia. By comparison, the model with the financial effects fails to provide more accurate simulating results. As such, this research concludes that the influence of the late-2000s financial crisis on Australian national and state construction labour productivity is limited.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

BACKGROUND: Males employed in the construction industry have high rates of suicide. Although reasons underpinning this risk are multifaceted, poor help-seeking and stigma are represent major contributors. Males in the construction industry are also exposed to other risk factors for mental ill health and suicide, including unemployment. Sigma-reducing interventions that are accessible and attractive to recently unemployed males in the construction industry could therefore improve help-seeking, and address depression and suicidal behaviour in this population. METHODS/DESIGN: Contact&Connect will use a parallel individual randomized design to evaluate the effectiveness of a multimedia-based intervention aimed at reducing stigma. The intervention consists of a package of 12 brief contact interventions (BCIs) delivered over a six month period. BCIs will direct participants to informational programs and microsites. Content will address three major themes: debunking depression myths and stereotypes, normalisation, and empowerment. Target enrolment is 630 (315 in each arm), each to be followed for 12 months. Eligible participants will be males, between 30 and 64 years, unemployed at the time of recruitment, registered with Incolink (a social welfare trustee company for unemployed members of the construction industry), and own a smart phone with enabled internet connectivity. DISCUSSION: At present, there are no programs that have been shown to be effective in reducing stigma in the blue-collar male population. Contact&Connect promises to provide a tailored, efficient, and scalable approach to reducing stigma, depressive symptoms and suicidality among unemployed males. TRIAL REGISTRATION: Australian New Zealand Clinical Trials Register ACTRN12615000792527  (date of registration: 30 July, 2015).

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Concrete has been successfully used to build strong and economic structures. However severe environmental exposures slowly deteriorate concrete strength until complete failure reducing its designed service life. Fiber Reinforced Polymer “FRP” has been recently introduced in the construction industry to strengthen and retrofitting several structural elements including columns. In this research two types of FRP have been used to wrap concrete column in order to increase its capacity; these are Carbon Fiber Reinforced Polymer “CFRP” and Glass Fiber Reinforced Polymer “GFRP”. Twelve short concrete columns have been wrapped with one and two FRP layers including CFRP and GFRP to evaluate their mechanical performance. Mechanical testing has shown that, in general, concrete columns wrapped with FRP produced higher modulus of elasticity compared to the control sample. Results showed that one layer of CFRP have 85.8% increases where as one layer of GFRP showed an increase of 64.5%. Furthermore, two layers of CFRP and GFRP showed 112.5% and 77.2% increase respectively.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction waste generation has been identified as one of the major issues in the construction industry due to its direct impacts on the environment as well as the efficiency of the construction industry. As the industry cannot continue to practice if the environmental resources on which it depends are depleted, the significance of waste management needs to be understood in order to encourage stakeholders to achieve related goals. Therefore, this research aims to determine effective approaches to eliminate and/or minimise waste generation in construction projects. Mixed methods were adopted by combining qualitative and quantitative research approaches. Interviews and a questionnaire survey were conducted as the primary data collection methods. The findings reveal twenty six critical solutions for waste management. Five factors of solutions for waste management were extracted from the exploratory factor analysis. These factors were: team building and supervision; strategic guidelines in waste management; proper design and documentation; innovation in waste management decisions; and lifecycle management. The evidence from this study suggests that both technologies and attitudinal approaches require improvement to eliminate/minimise waste generation in construction projects. Similarly, attention should be paid to being mindful of the environmental effects of waste generation and avoiding waste generation as early as possible in construction projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose-Understanding and simulating construction activities is a vital issue from a macro-perspective, since construction is an important contributor in economic development. Although the construction labor productivity frontier has attracted much research effort, the temporal and regional characteristics have not yet been explored. The purpose of this paper is to investigate the long-run equilibrium and dynamics within construction development under a conditional frontier context. Design/methodology/approach-Analogous to the simplified production function, this research adopts the conditional frontier theory to investigate the convergence of construction labor productivity across regions and over time. Error correction models are implemented to identify the long-run equilibrium and dynamics of construction labor productivity against three types of convergence hypotheses, while a panel regression method is used to capture the regional heterogeneity. The developed models are applied to investigate and simulate the construction labor productivity in the Australian states and territories. Findings-The results suggest that construction labor productivity in Australia should converge to stable frontiers in a long-run perspective. The dynamics of the productivity are mainly caused by the technology utilization efficiency levels of the local construction industry, while the influences of changes in technology level and capital depending appear limited. Five regional clusters of the Australian construction labor productivity are suggested by the simulation results, including New South Wales; Australian Capital Territory; Northern Territory, Queensland, and Western Australia; South Australia; and Tasmania and Victoria. Originality/value-Three types of frontier of construction labor productivity is proposed. An econometric approach is developed to identify the convergence frontier of construction labor productivity across regions over time. The specified model can provides accurate predictions of the construction labor productivity.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose - This paper aims to present a survey of the perceptions of the barriers to implementing reverse logistics (RL) practices in South Australian (SA) construction organisations. Despite the extensive research on forward logistics and RL, there is a paucity of studies that examine the barriers to implementing RL particularly within the Australian construction industry. This study builds on the ongoing research being undertaken by the authors, entitled “Designing for reverse logistics (DfRL) within the building life cycle: practices, drivers and barriers”, which is examining the best practices and drivers that could be used as a “road map” for developing appropriate solutions for the successful implementation of RL. Design/methodology/approach - Data were collected by utilising a triangulated data collection approach, a literature review and 49 questionnaires. The review of the literature identified 16 barriers to implementing RL. The quantitative survey data were subjected to descriptive and inferential statistics with correlation analysis to examine the relationships between different pairs of variables comprising RL’s critical barriers. Findings - The following barriers were indicated as most significant: lack of incorporation of salvaged materials by designers; regulation restrictions to usage of recovered materials and components; potential legal liabilities; higher costs; and longer-time association with deconstructing buildings. The least ranked barriers were mostly drawn from the operational and industrial categories as being: organisational lack of support for deconstruction due to incompatible design; lack of organisational support for deconstructing buildings due to higher health and safety risks; and inadequate skills and experience for deconstruction (operational). The industrial barrier was related to “higher costs of salvaged materials in comparison to virgin products”. Research limitations/implications - First, the reported findings are focussed on one study that used questionnaire surveys within the construction industry; therefore, the results may not be generalisable to other contexts. Further, studies should be conducted and extended to other industrial sectors beyond the construction industry. Second, the quantitative study (n 49) used a smaller sample, and the survey items were based on the review of the literature. Practical implications - The identified barriers could be used as a “road map” for the development of appropriate solutions for the successful implementation of RL, and to improve the environment-related decision-making processes of contractors. Originality/value - This study makes a contribution to the body of knowledge on the subject of RL within a previously unexplored SA context. In addition, the study provides some insights on the contributory effects of the barriers to the implementation of RL. It is the first work undertaken to determine the barriers to the adoption of RL within the SA construction industry.