176 resultados para Construction industry Environmental aspects


Relevância:

100.00% 100.00%

Publicador:

Resumo:

International comparisons of construction industry performance are notoriously difficult. A recent comparative study, extensive in scope and using an innovative approach, is reviewed and questions raised regarding various aspects of the methodology adopted, the validity of the conclusions drawn and manner in which outcomes were reported. Particular areas of concern include the unequivocal statement of conclusions that are based on a small sample, and the use of data from that sample that are, in fact, no more than estimates of project performance. Attention is drawn to the limitations of the research reported and the reliability of the methods used, and the data gathered is examined.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction management graduates are employed in job functions such as building and civil engineering contracting, construction and project management consulting, client organisations (public and private) and developer organisations. Considering the diversity of employment opportunities for construction management graduates, they increasingly need to have a portfolio of skills to work effectively and efficiently with other professions in the industry. In exploring this, the objective of the research presented in this paper is to determine if construction management graduates are meeting the expectations of their employers. In considering the competitive forces impacting the construction industry, the authors of this paper sought to establish whether construction managers are able to identify those key skills needed for the future success of the industry. In turn, this information is considered critical for the successful formulation of curricula. Therefore, to establish whether construction management graduates are meeting the expectations of contractors, a survey was distributed to managers to establish their expectations and observations of recent graduates. The survey results indicate that managers are generally satisfied with the skill level of graduate students. The survey also highlighted several important skills that were considered to be lacking in graduates. cknowledging that there is always a need to improve the skill level of graduates, the authors propose a number of recommendations that are considered to improve the content construction management curricula.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Agenda 21 may be considered the most significant programme of action influencing environmental policy for the Australian development and construction industry. The industry has remained one of the most rapidly expanding sectors; yet, we have seen the gradual process of exhausting natural resources and irreversible environmental degradation. Even with the introduction of numerous new environmental policies, it remains questionable as to whether real improvements have occurred across the industry. Legislative mechanisms to direct on-site environmental management appear deficient; information flows between participants along the supply chain appear to impact upon environmental management performance; and industry fragmentation remains compounded by ill-defined external, non-contractual supply chain influences that directly impact on contractual systems. Limited research has considered construction supply chain theory and environmental management particularly in reference to policy. The literature highlighted a need to develop a supply chain model which seeks to integrate chain actors and government regulators through holistic information management. The model assumes that fundamental to industry change is statutory control to mandate construction environmental management plans. However, industry change and subsequent environmental management rely upon effective information dissemination. The next stage involves model refinement, investigating barriers and enablers to widespread diffusion of such an innovative integrated environmental management system.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The impacts on the environment from human activities are of increasing concern. The need to consider the reduction in energy consumption is of particular interest, especially in the construction and operation of buildings, which accounts for between 30 and 40% of Australia's national energy consumption. Much past and more recent emphasis has been placed on methods for reducing the energy consumed in the operation of buildings. With the energy embodied in these buildings having been shown to account for an equally large proportion of a building's life cycle energy consumption, there is a need to look at ways of reducing the embodied energy of buildings and related products. Life cycle assessment (LCA) is considered to be the most appropriate tool for assessing the life cycle energy consumption of buildings and their products. The life cycle inventory analysis (LCIA) step of a LCA, where an inventory of material and energy inputs is gathered, may currently suffer from several limitations, mainly concerned with the use of incomplete and unreliable data sources and LCIA methods. These traditional methods of LCIA include process-based and input-output-based LCIA. Process-based LCIA uses process specific data, whilst input-output-based LCIA uses data produced from an analysis of the flow of goods and services between sectors of the Australian economy, also known as input-output data. With the incompleteness and unreliability of these two respective methods in mind, hybrid LCIA methods have been developed to minimise the errors associated with traditional LCIA methods, combining both process and input-output data. Hybrid LCIA methods based on process data have shown to be incomplete. Hybrid LCIA methods based on input-output data involve substituting available process data into the input-output model minimising the errors associated with process-based hybrid LCIA methods. However, until now, this LCIA method had not been tested for its level of completeness and reliability. The aim of this study was to assess the reliability and completeness of hybrid life cycle inventory analysis, as applied to the Australian construction industry. A range of case studies were selected in order to apply the input-output-based hybrid LCIA method and evaluate the subsequent results as obtained from each case study. These case studies included buildings: two commercial office buildings, two residential buildings, a recreational building; and building related products: a solar hot water system, a building integrated photovoltaic system and a washing machine. The range of building types and products selected assisted in testing the input-output-based hybrid LCIA method for its applicability across a wide range of product types. The input-output-based hybrid LCIA method was applied to each of the selected case studies in order to obtain their respective embodied energy results. These results were then evaluated with the use of a number of evaluation methods. These evaluation methods included an analysis of the difference between the process-based and input-output-based hybrid LCIA results as an evaluation of the completeness of the process-based LCIA method. The second method of evaluation used was a comparison between equivalent process and input-output values used in the input-output-based hybrid LCIA method as a measure of reliability. It was found that the results from a typical process-based LCIA and process-based hybrid LCIA have a large gap when compared to input-output-based hybrid LCIA results (up to 80%). This gap has shown that the currently available quantity of process data in Australia is insufficient. The comparison between equivalent process-based and input-output-based LCIA values showed that the input-output data does not provide a reliable representation of the equivalent process values, for material energy intensities, material inputs and whole products. Therefore, the use of input-output data to account for inadequate or missing process data is not reliable. However, as there is currently no other method for filling the gaps in traditional process-based LCIA, and as input-output data is considered to be more complete than process data, and the errors may be somewhat lower, using input-output data to fill the gaps in traditional process-based LCIA appears to be better than not using any data at all. The input-output-based hybrid LCIA method evaluated in this study has shown to be the most sophisticated and complete currently available LCIA method for assessing the environmental impacts associated with buildings and building related products. This finding is significant as the construction and operation of buildings accounts for a large proportion of national energy consumption. The use of the input-output-based hybrid LCIA method for products other than those related to the Australian construction industry may be appropriate, especially if the material inputs of the product being assessed are similar to those typically used in the construction industry. The input-output-based hybrid LCIA method has been used to correct some of the errors and limitations associated with previous LCIA methods, without the introduction of any new errors. Improvements in current input-output models are also needed, particularly to account for the inclusion of capital equipment inputs (i.e. the energy required to manufacture the machinery and other equipment used in the production of building materials, products etc.). Although further improvements in the quantity of currently available process data are also needed, this study has shown that with the current available embodied energy data for LCIA, the input-output-based hybrid LCIA appears to provide the most reliable and complete method for use in assessing the environmental impacts of the Australian construction industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This study investigated the feasibility of ranching the abalone Haliotis rubra (Leach) and Haliotis laevigata (Donovan) on concrete artificial reefs at a site chosen by industry investors on silty bottom off Altona Beach, Port Phillip Bay, Victoria, Australia. The study started from the premise that artificial reef deployment combined with abalone stock enhancement may achieve the dual purpose of habitat and stock improvement. It evaluated the hydrodynamics of the site in relation to artificial reef structural stability and drift algal transport, the development and ecology of the artificial reef assemblage, and abalone enhancement by seeding the reefs with hatchery juvenile abalone and transplanting adult broodstock abalone. Despite a scarcity of reports on culturing abalone on artificial reef, a literature review examined broadly the functions of artificial reefs, particularly in the context of abalone enhancement, and the relationship between artificial reefs, hydrodynamics and ecology. The major finding was that the success of artificial reef projects is highly dependent on the environment of the chosen site, and that preliminary studies are essential to predict their likely success. This consideration alone provided strong justification to undertake this study. The topography at the Altona site was generally flat, with natural patches of low basalt boulder reef, offering low habitat complexity, yet supporting a diverse range of flora and fauna, including a low-density wild stock of H. rubra. Water depth was a mean of 3.3 m at low tide and 4.4 m at high tide. A single, uncomplicated, concrete artificial reef of H-shape design, was tested as abalone habitat. The hydrodynamic analysis confirmed previous studies of Port Phillip Bay, with mild current speeds of mean 0.045 m.s-1, and maximum-modelled wave height (H1/3) of 1.21 m and period (T1/3) of 4.51 sec. Water temperature ranged from 9.9şC during July to 23.8şC during January, with salinity averaging of 35.5 ppt. The site had a low probability of receiving drift algae, necessary as a food source for abalone, because of its geographic location, potentially affecting ranch productivity. Ecological monitoring of the three-year old artificial reef shows complex changes in the flora and fauna over time, particularly in respect of the sessile fauna. Key differences between the artificial reef and a nearby natural reef community were: lower cover of corallines and late colonisers, such as sponges. High levels of sedimentation were recorded at the Altona site. Hatchery juvenile H. laevigata, with mean survival of 15% after two years and a mean annual growth rate of 39 mm, showed the most promise for outplanting. In comparison, for hatchery juvenile H. rubra, mean survival was 9% after three years and mean annual growth rate was 22 mm. No natural recruitment of H. laevigata was recorded on artificial reef despite transplants of adult broodstock on the reefs. Natural recruitment of H. rubra was also low and insufficient to reliably contribute to abalone ranch stock. Having examined the hydrodynamic, ecological and enhancement attributes of the Altona site, the study concluded that the site was marginally viable for abalone ranching, and that an alternative site near Werribee, 20 km further southwest, had superior attributes for growth and survival of abalone.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research examined the inclusion of environmental rating tools in the design of commercial buildings. Environmental issues are becoming increasingly important for designers and the results of the study suggest that rating tools can be an asset to design teams, provided they are integrated and reinforced throughout the design process.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

With a focus on different aspects of stakeholder management, various sets of critical success factors (CSFs) have been suggested in the literature. It is crucial to explore the relative importance and groupings of these factors. This paper aims to identify CSFs associated with stakeholder management in construction projects, and explore their ranking and underlying relationship. 15 CSFs were identified through a literature review, and consolidated by interviews and pilot studies with professionals in construction industry. A questionnaire instrument containing these 15 CSFs was sent out to project managers in Hong Kong, and 183 completed questionnaires were retrieved. The top three ranked factors for stakeholder management were "managing stakeholders with social responsibilities", "assessing the stakeholders' needs and constraints to the project", and "communicating with stakeholders properly and frequently". Using factor analysis and considering the high importance of the factor "managing stakeholders with social responsibilities", the 15 CSFs were grouped into five dimensions namely, precondition factor, stakeholder estimation, information inputs, decision making, and sustainable support. All these five groupings and their relationship were included in a framework for successful stakeholder management in construction projects. These findings help to clarify what the high prioritized factors are, and could also be used as an assessment tool to evaluate the performance of stakeholder management and thus help to identify areas for improvement.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The promotion of offsite production is a possible future strategic direction for the construction industry as it provides economic, environmental and social benefits. However, in China, the uptake of offsite production, particularly in the housing sector, is relatively low and few studies have identified and examined the reasons behind this trend. This research gap is addressed and factors that inhibit the wider use of offsite production in China’s housing construction industry are investigated. A questionnaire survey was carried out, examining the views of 110 construction professionals in China including developers, designers, contractors, manufacturers and suppliers. Factor analysis of 21 separate variables was undertaken which extracted six principal factors, namely: ‘constructability implementation’, ‘social climate and attitudes’, ‘architectural performance’, ‘costing’, ‘supply chain’ and ‘preparatory stage’. The findings identify both barriers and challenges to increasing the uptake of offsite production in China. This provides a rare insight about the housing construction industry in China with possible implications for other developing countries that are seeking to identify and overcome barriers to the wider uptake of offsite production.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

BACKGROUND: Males employed in the construction industry have high rates of suicide. Although reasons underpinning this risk are multifaceted, poor help-seeking and stigma are represent major contributors. Males in the construction industry are also exposed to other risk factors for mental ill health and suicide, including unemployment. Sigma-reducing interventions that are accessible and attractive to recently unemployed males in the construction industry could therefore improve help-seeking, and address depression and suicidal behaviour in this population. METHODS/DESIGN: Contact&Connect will use a parallel individual randomized design to evaluate the effectiveness of a multimedia-based intervention aimed at reducing stigma. The intervention consists of a package of 12 brief contact interventions (BCIs) delivered over a six month period. BCIs will direct participants to informational programs and microsites. Content will address three major themes: debunking depression myths and stereotypes, normalisation, and empowerment. Target enrolment is 630 (315 in each arm), each to be followed for 12 months. Eligible participants will be males, between 30 and 64 years, unemployed at the time of recruitment, registered with Incolink (a social welfare trustee company for unemployed members of the construction industry), and own a smart phone with enabled internet connectivity. DISCUSSION: At present, there are no programs that have been shown to be effective in reducing stigma in the blue-collar male population. Contact&Connect promises to provide a tailored, efficient, and scalable approach to reducing stigma, depressive symptoms and suicidality among unemployed males. TRIAL REGISTRATION: Australian New Zealand Clinical Trials Register ACTRN12615000792527  (date of registration: 30 July, 2015).

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is twofold. First, it aims to highlight the main factors and items affecting the productivity of construction projects, based on the perceptions of CEOs in construction companies in Iran. Second, the study compares the elicited CEOs’ perceptions against the findings of studies based on the views of such as project managers, middle managers and employees in other levels. Design/methodology/approach – The study drew upon literature on construction work to develop a conceptual model. Further, a total of 60 CEOs from road construction companies were surveyed using a five-point Likert scale questionnaire to generate the data. The collated data were categorised and ranked according to the CEOs perceived level of importance using the relative importance index. Findings – The findings highlight the main factors and items affecting labour productivity in construction projects in Iran as perceived by CEOs, which are mainly of human resources management nature and could be attributed to motivation and managerial policy aspects. The study also recognises that factors associated with the working environment particularly safety and health are perceived as insignificant by Iranian CEOs which could be a concern for the Iranian construction industry. The discussions shed some light on the discrepancies between the perceptions of CEOs and previous studies in regards to major determinants of productivity in the construction context. Originality/value – This study is the first study aiming at discussing the perceptions of CEOs of construction companies active in construction projects in Iran. As such, the study highlights the standpoint of the main decision makers in construction companies in regards to labour productivity in the construction sector. Thus, the key contribution of the present study is providing insight into the perceptions of CEOs, who play the most vital role in strategic development of construction companies whereas previous studies have mostly focused on project or middle managers having a lower influence in determining the strategic plans of companies.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction waste generation has been identified as one of the major issues in the construction industry due to its direct impacts on the environment as well as the efficiency of the construction industry. As the industry cannot continue to practice if the environmental resources on which it depends are depleted, the significance of waste management needs to be understood in order to encourage stakeholders to achieve related goals. Therefore, this research aims to determine effective approaches to eliminate and/or minimise waste generation in construction projects. Mixed methods were adopted by combining qualitative and quantitative research approaches. Interviews and a questionnaire survey were conducted as the primary data collection methods. The findings reveal twenty six critical solutions for waste management. Five factors of solutions for waste management were extracted from the exploratory factor analysis. These factors were: team building and supervision; strategic guidelines in waste management; proper design and documentation; innovation in waste management decisions; and lifecycle management. The evidence from this study suggests that both technologies and attitudinal approaches require improvement to eliminate/minimise waste generation in construction projects. Similarly, attention should be paid to being mindful of the environmental effects of waste generation and avoiding waste generation as early as possible in construction projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose - The users of construction technologies such as builders and trades people have been acknowledged as sources of potentially important innovations. These innovations may be in the form of safer, less labour intensive, or cheaper methods and processes. The purpose of this paper is to assess whether the Australian construction industry is providing an environment where user-based innovation is being supported and implemented. Design/methodology/approach - An explorative study was undertaken to provide an insight into actual experiences of the implementation of user-based innovation. The data were collected through faceto- face semi-structured interviews providing case studies on multiple aspects of the implementation of innovative construction technologies. The cases involved a cross section of advances, including product, tool, and system technologies. Findings - The main motivation behind developing the technologies was problem solving. The associated industries of manufacturing and retail, as well as consultants within the construction industry present the greatest barriers to implementation. Originality/value - This research provides a better understanding of the factors that are preventing the successful implementation of user-based innovative construction technologies in small firms.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this paper is twofold. Firstly, its aim is to ascertain the major aspects of job satisfaction for South Australian construction workers including the main ramifications of job satisfaction in the working environment. Secondly, it investigates the influence of key age-related factors i.e. chronological age, organisational age and length of service on major aspects of job satisfaction. The collected data for this study comprised 72 questionnaires completed by construction practitioners working at operational levels in the South Australian construction industry. Based on the responses from the target group, this study deduced that job dissatisfaction was predominantly related to the adverse impact on personal health and quality of life. In addition, indifference and the perception of dejection in the workplace are the main consequences of low levels of job satisfaction. Inferential analyses revealed that none of the age-related factors could significantly affect the major aspects of job satisfaction of construction workers in the South Australian context. The study concludes with providing practical suggestions for redesigning human resources practices for increasing the level of job satisfaction within the South Australian construction industry.