93 resultados para successful building projects


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose - To investigate whether strategic orientation affects the evaluation of specific market research projects in for-profit firms.
Design/methodology/approach - A small-scale follow-up survey was conducted, building on qualitative and quantitative research among a sample of the top-1,000 marketing managers in Australia. The study used an existing market research evaluation tool, the USER scale and items generated from the qualitative research, to investigate the firm's most recent market research project.
Findings - Four market research performance factors were identified - market research as a knowledge enhancing (KE) function, the internal political use of market research, the misuse of market research and the generation of market understanding. The Miles and Snow strategy types were related to these factors, with Prospector types more likely to use market research rationally and less likely to use it for internal political purposes. Tactical projects were more likely to be misused than were those with a strategic orientation. Prospectors were far less likely and analysers far more likely to misuse tactical research projects. Prospectors were more often satisfied with the performance of their most recent market research. The Porter typology was less successful in predicting market research performance.
Research limitations/implications - The study was based on a small sample of market research projects in Australian for-profit firms. Future studies need to study these phenomena more intensively using ethnographic methods and more extensively using larger multi-country samples.
Practical implications - Market research suppliers should learn the nature of their client's strategic intent to improve their effectiveness. Defender firms should carefully monitor the use of market research, especially that of a tactical nature, which may be wasted or misused.
Originality/value - Contributes to an understanding of how strategic orientation relates to the ways market research information is used within the firm.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In recent years, building demolition has been challenging urban developers due to the increased incidence of demolition projects and the elevation of demolition requirements. The importance of building demolition is also recognised by researchers and, given its environmental impacts, it is anticipated to achieve the same attention as conventional planning, design,
construction and maintenance in the near future. In this article, the authors aim to develop a series of strategies for promoting building demolition practice. Environmentally-friendly demolition procedures are introduced through a waste minimisation decision that makes the approach on alternatives to demolition and an integrated demolition planning and design approach focus on a just-in-time (JIT) philosophy. A conceptual management framework is also presented for the implementation of demolition projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The 200 years of apprentice/master tradition that underpins the atelier studio system is still at the core of much present-day architectural design education. Yet this tradition poses uncertainties for a large number of lecturers faced with changes in the funding of tertiary education. With reductions in one-to-one staff/student contact time, many educators are finding it increasingly difficult to maintain an atelier teaching model. If these deficiencies remain unchecked and design-based schools are unable to implement strategies to reduce the resource intensity of one-to-one studio teaching programmes, then, for many higher-education providers, current architectural education may be based on an untenable course structure. Rather than spreading their time thinly over a large number of individual projects, an increasing number of lecturers are setting group projects. This allows them to coordinate longer and more in-depth review sessions on a smaller number of assignment submissions. However, while the group model may reflect the realities of the design process in professional practice, the approach is not without shortcomings as a teaching and learning archetype for the assessment of individual student skill competencies. Hence, what is clear is the need for a readily adoptable andragogy for the teaching and assessment of group design projects. The following is a position paper that describes – with a focus on effective group structures and assemblage and fair assessment models – the background, methodology and early results of a Strategic Teaching and Learning Grant currently running at the School of Architecture and Building at Deakin University in Australia.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Conventional mechanical building demolition produces numerous solid wastes, most of which are sent to landfill directly and severely degrade the living environment. Just-in-time building demolition has been developed recently with a management strategy to facilitate waste reuse. Procurement management plays a significant role in just-in-time building demolition. In particular, the demolition tendering selection needs to consider contractors' environmental performance in addition to project costs. Moreover, the flow of building materials in a demolition project may be regarded as a supply chain involving the building owner, demolition contractor and material demanders. This paper develops a framework for salvaged materials management in the emerging demolition industry. The research is to promote the recycling and reuse of building demolition materials in order to achieve better environmental and financial performance for building demolition projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Many complex problems including financial investment planning, foreign exchange trading, knowledge discovery from large/multiple databases require hybrid intelligent systems that integrate many intelligent techniques including expert systems, fuzzy logic, neural networks, and genetic algorithms. However, hybrid intelligent systems are difficult to develop because they have a large number of parts or components that have many interactions. On the other hand, agents offer a new and often more appropriate route to the development of complex systems, especially in open and dynamic environments. In this paper, it is argued that agent technology is well snited for constructing hybrid intelligent systems (especially loosely coupled hybrid intelligent systems) through a successful case study. A great number of heterogeneous computing techniques/packages are easily integlated into the experimental system under a unifying agent framework, which implies that agent technology can greatly facilitate the construction of hybrid intelligent systems.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Designing a successful web project requires understanding not only of its owner's business and technological needs, as well as having the substantial management and development experience, but it also depends on a thorough knowledge of the system's application domain and of other existing systems in the domain. In order to gather such domain knowledge, it is necessary to identify the nature of the proposed web services venture with regards to other similar services offered in the domain, the business setting of enterprises that initiate such ventures, the various types of customers involved, and how these factors translate into requirements. In this paper, we present an approach to studying the domain of web-enabled Human Resource and payroll services with the aim of attaining design knowledge that would ensure customer satisfaction and could eventually pave the way to the successful implementation of web-enabled services.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Information in construction industry is delivered and interpreted in a language specific to the industry in which large complex objects are only partially described and with much information being implicit in the language used. Successful communication therefore relies on participants in the industry leaming how to interpret the language through many years of education, training and experience. With the introduction of computer technology, and in particular the detailed digital building information model (DB 1M), the accepted language currently in use is no longer a valid method of describing the building. At all stages in the paper based design and documentation process it is generally readily apparent which parts of the design require further completion and which are fully resolved. This is able to be achieved through the complex graphical language currently in use. In the DBIM, all information appears at the same level of resolution making difficult the interpretation of implicit information embedded in the model. This compromises the collaborative design environment which is being described as a fundamental characteristic of the future construction industry. This paper focuses on two areas. The first analyses design resolution and the role uncertain information plays in the design process. It then discusses the manner in which designers and the industry in general deal with incomplete or unresolved information. The second describes a theoretical model in which a design resolution (DR) environment incorporates the level of design resolution as an operable element in a collaborative DBIM. The development and implementation of this model will allow designers to better share, understand and interpret design knowledge from the shared information during the various stages of digital design and before full resolution is achieved.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Building demolition has been undergoing evolutionary development in its technologies for several decades. In order to achieve a high level of demolition material reuse and recycling, new management approaches are also necessitated. Several information systems are proposed or developed particularly promoting efficient project management, waste minimization and project safety. These information systems include waste exchange, 4D visualization, safety aware schedule, waste product schedule, site atTangement optimization and so on. However, the fragmented information systems applied by various parties involved in the demolition project could generate conflicts due to the lack of communication and standardization. This paper aims to develop a framework of an integrated information system for building demolition projects, which covers the major aspects of innovative management approaches and conventional construction project management perspective. Practically, the system will serve as an information portal for all demolition project team members.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Building demolition imposes substantial environmental impacts. In particular, large amount of demolition wastes are disposed to landfills. A solution to ease the situation is to maximally reuse and recycle waste building material. Management philosophies such as Just-in-time are applied into demolition project management in order to promote reuse and recycling of demolition wastes. Transportation logistics, widely applied in the manufacturing industry, is ideal to be adopted into demolition projects to optimise waste material production, inventorying, and transportation. In particular, it enables right types and amounts of dismantled building materials to be transferred to right location, and at right time, as required by material demanders. Consequently, waste reuse and recycling can be facilitated. Furthermore, logistics management helps the demolition project team to reduce cost, shorten project duration, and satisfy material demanders. Transportation planning concerns thorough preparation technically and managerially on the demolition site for transportation activities. Information exchange is playing a significant role in delivering and sharing information among project participants, including building owner, demolition project team, potential material demanders, and transporters. This research paper aims to identify the role of transportation logistics in a building demolition project and to analyse inventory control, transportation, and various technical aspects of logistic management for demolition wastes.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Changes in the funding of tertiary education resulting in less one-to-one staff/student contact time mean that we cannot continue to teach as we have historically been taught. If design schools are unable to implement strategies that successfully overcome resource intensive studio teaching programs, then current architectural education may for many higher education providers be based on an unsustainable course structure. Rather than spreading their time thinly over a large number of individual projects, an increasing number of lecturers are setting group projects. This allows them to co-ordinate longer and more in-depth review sessions on a smaller number of assignments. However, while the group model may reflect the realities of the design process in practice, the approach is not without short comings as a teaching archetype for the assessment of individual skill competencies. Hence, what is clear is the need for a readily adoptable andragogy for the teaching and assessment of group design projects.
The following describes the background, methodology and early results of a Strategic Teaching and Learning Grant currently running at the School of Architecture and Building at Deakin University. The project is evaluating two design programs at Deakin and it is envisaged that the results of the
investigation may inform other project-based teaching disciplines experiencing a similar need for new knowledge and skill-based delivery due to increasing staff-student ratios.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Waste exchange is as a facilitator for construction and demolition waste deduction by reuse and recycling in construction projects. The just-in-time philosophy, which has been well cultivated in the manufacturing industry, is highly adoptable for demolition projects. Particularly, waste exchange that is usually performed after the actual demolition process can be shifted forward so that waste inventory from demolition is eliminated or reduced to facilitate waste reuse and recycling. A web-based waste exchange system is an ideal platform to enable communications among project participants before a demolition project commences so that waste materials can be sold before they are produced. Therefore, the productivity of the demolition project could be improved. This research paper aims to investigate and analyse the adoption of just-in-time philosophy in building demolition project management. It also describes the development of the proposed web-based waste exchange system that implements just-in-time demolition in detail, including its functionalities, information flows and major components.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Information technology has transformed the “heartland” of education around the world. Classrooms are global, students international, but traditional methods and their adjacent challenges persist or are exacerbated in online schoolhouses. There is reason to believe that team performance of online students completing team projects can be significantly improved by the active participation of a facilitator. What could explain such improvement? Given the communication barriers that learners can experience using e-learning technologies, the skill of a teacher at facilitating an understanding of e-collaboration and the prescient need to facilitate collaborative skills at all times is essential to a successful educational result. There may also be generational learning style issues to consider. One practical, proven tool is progress reporting. This paper reviews the literature and reflects on author experiences in the online education of Management students at universities in the United States and Australia to draw theoretical connections with communication, leadership, and punctuated equilibrium relevant to contemporary educational practice. The implications of effective facilitation of student teams for Management education and management of student performance are explored.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Construction management graduates are employed in job functions such as building and civil engineering contracting, construction and project management consulting, client organisations (public and private) and developer organisations. Considering the diversity of employment opportunities for construction management graduates, they increasingly need to have a portfolio of skills to work effectively and efficiently with other professions in the industry. In exploring this, the objective of the research presented in this paper is to determine if construction management graduates are meeting the expectations of their employers. In considering the competitive forces impacting the construction industry, the authors of this paper sought to establish whether construction managers are able to identify those key skills needed for the future success of the industry. In turn, this information is considered critical for the successful formulation of curricula. Therefore, to establish whether construction management graduates are meeting the expectations of contractors, a survey was distributed to managers to establish their expectations and observations of recent graduates. The survey results indicate that managers are generally satisfied with the skill level of graduate students. The survey also highlighted several important skills that were considered to be lacking in graduates. cknowledging that there is always a need to improve the skill level of graduates, the authors propose a number of recommendations that are considered to improve the content construction management curricula.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Building design decisions are commonly based on issues pertaining to construction cost, and consideration of energy performance is made only within the context of the initial project budget. Even where energy is elevated to more importance, operating energy is seen as the focus and embodied energy is nearly always ignored. For the first time, a large sample of buildings has been assembled and analysed in a single study to improve the understanding of the relationship between energy and cost performance over their full life cycle. Thirty recently completed buildings in Melbourne, Australia have been studied to explore the accuracy of initial embodied energy prediction based on capital cost at various levels of model detail. The embodied energy of projects, elemental groups, elements and selected items of work are correlated against capital cost and the strength of the relationship is computed. The relationship between initial embodied energy and capital cost generally declines as the predictive model assumes more detail, although elemental modelling may provide the best solution on balance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This article reports on a qualitative research study undertaken with Indigenous government employees to explore ways in which Indigenous communities can access programs involving caring for Country' (knowledge, responsibility and inherent right to protect the traditional natural landscape) on their traditional land and, in so doing. improve their health. Factors that optimise such nature-based projects are the capacity of their intention to build relationships, consultation. transparency, consistency, education and training between Indigenous communities. government and the general public. Government agencies need to develop strategies where partnership and collaboration are effective with Indigenous communities and within the agencies themselves, in order to resolve controversial issues surrounding access to Country.