51 resultados para Practice construction


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to summarize the scope, methodology and main findings of a doctoral thesis about the implementation of enterprise resource planning (ERP) software in a major construction contracting organization in Hong Kong. This research is taken from a leadership and power and project management (PM) perspective.

Design/methodology/approach – The project adopted a case study approach in which the candidate was an employee/observer, who was embedded as a member of the business transformation team taking an action learning approach to study the ERP adoption. The research used the soft system methodology to identify gaps in the observed maturity level which exists in the organization. Data was gathered using public and private documentation, semi-structured interviews, observation and was validated through review of evidence with participants.

Findings – The results identified the importance of leadership and cultural issues in implementation of the business strategy. This research includes a contribution in two spheres: PM and construction procurement. The first implication for PM theory was to illustrate how knowledge has been efficiently managed within a construction organization by using information communication technology (ICT). It can be represented by the ladder of ICT>ERP>KM>PM. The second implication was to pave the way for the use of partnering strategies in PM practice. It can be represented by the ladder of National Culture>Organizational Culture>Leadership>Partnering Strategy>PM.

Practical implications – This model could be adapted to other large and complex organisational contexts. The research project also has implications as opening up a PM perspective on business transformation.

Originality/value – The contribution of this research is proving the success of adopting KM in a construction company by using an ERP system. The importance of culture in the traditionally collectivistic construction industry, and the issues senior management should take into account when formulating business strategies.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Background: There are few validated measures of organizational context and none that we located are parsimonious and address modifiable characteristics of context. The Alberta Context Tool (ACT) was developed to meet this need. The instrument assesses 8 dimensions of context, which comprise 10 concepts. The purpose of this paper is to report evidence to further the validity argument for ACT. The specific objectives of this paper are to: (1) examine the extent to which the 10 ACT concepts discriminate between patient care units and (2) identify variables that significantly contribute to between-unit variation for each of the 10 concepts.

Methods: 859 professional nurses (844 valid responses) working in medical, surgical and critical care units of 8 Canadian pediatric hospitals completed the ACT. A random intercept, fixed effects hierarchical linear modeling (HLM) strategy was used to quantify and explain variance in the 10 ACT concepts to establish the ACT’s ability to discriminate between units. We ran 40 models (a series of 4 models for each of the 10 concepts) in which we systematically assessed the unique contribution (i.e., error variance reduction) of different variables to between-unit variation. First, we constructed a null model in which we quantified the variance overall, in each of the concepts. Then we controlled for the contribution of individual level variables (Model 1). In Model 2, we assessed the contribution of practice specialty (medical, surgical, critical care) to variation since it was central to construction of the sampling frame for the study. Finally, we assessed the contribution of additional unit level variables (Model 3).

Results: The null model (unadjusted baseline HLM model) established that there was significant variation between units in each of the 10 ACT concepts (i.e., discrimination between units). When we controlled for individual characteristics, significant variation in the 10 concepts remained. Assessment of the contribution of specialty to between-unit variation enabled us to explain more variance (1.19% to 16.73%) in 6 of the 10 ACT concepts. Finally, when we assessed the unique contribution of the unit level variables available to us, we were able to explain additional variance (15.91% to 73.25%) in 7 of the 10 ACT concepts.

Conclusion: The findings reported here represent the third published argument for validity of the ACT and adds to the evidence supporting its use to discriminate patient care units by all 10 contextual factors. We found evidence of relationships between a variety of individual and unit-level variables that explained much of this between-unit variation for each of the 10 ACT concepts. Future research will include examination of the relationships between the ACT’s contextual factors and research utilization by nurses and ultimately the relationships between context, research utilization, and outcomes for patients.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Physical models and scaled prototypes of architecture play an important role in design. They enable architects and designers to investigate the formal, functional, and material attributes of the design. Understanding digital processes of realizing scaled prototypes is a significant problem confronting design practice. This paper reports on three approaches to the translation of Gaussian surface models into scaled physical prototype models. Based on the geometry of Eladio Dieste’s Gaussian Vaults, the paper reports on the aspects encountered in the process of digital to physical construction using scaled prototypes. The primary focus of the paper is on computing the design geometry, investigating methods for preparing the geometry for fabrication and physical construction. Three different approaches in the translation from digital to physical models are investigated: rapid prototyping, two-dimensional surface models in paper and structural component models using CNC fabrication. The three approaches identify a body of knowledge in the design and prototyping of Gaussian vaults. Finally the paper discusses the digital to fabrication translation processes with regards to the characteristics, benefits and limitations of the three approaches of prototyping the ruled surface geometry of Gaussian Vaults. The results of each of three fabrication processes allowed for a better understanding of the digital to physical translation process. The use of rapid prototyping permits the production of form models that provide a representation of the physical characteristics such as size, shape and proportion of the Gaussian Vault.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Managing information and knowledge in the construction industry is an important focus for research. The goal is to expedite better integration of construction knowledge amongst the stakeholders. Better use of this knowledge could allow the building industry to achieve quality outputs making best use of resources – the linked goals of time, cost and quality. Information networks and knowledge transfer are central to this and are recognized as integral to an industry strategy to improve productivity. However, poor delivery of information to those at the construction site and lack of effective methods of transferring knowledge between parties involved in construction become major challenges. Based on a critical review of literature and an interview survey, this paper identifies the information networks adopted in the Malaysian construction industry and models these using four knowledge transfer components classified as ‘control’, ‘innovation’, ‘best practice’ and ‘audit’ element. Knowledge integration practices - attitude, communication, skills, commitment and monitoring; and factors related to information barriers including accessibility, service delivery, information updates and publication, were identified as critical features for the success of knowledge integration in the Malaysian construction industry. A framework for knowledge transfer is proposed to promote better practices in the Malaysian construction industry.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The principles and knowledge about arid planning and design have much applicability to contemporary Australian planning discourses because of climate change evidence and policy shifts that sketch a hotter and more unreliable future climate with an emphasis upon a semi-arid environment for Australia. Despite this merit and intent, we appear to have learnt little from the past and are failing to draw upon the pioneering planning and design knowledge that underpinned community development and scaffolding in numerous Australian arid and semi-arid communities, and to bring this knowledge into our future planning processes and strategies.

This paper considers the essential attributes and variables of three Australian arid planning and design, drawing upon historical practice and research that have been explored in the planning of semi-arid and arid places including Port Pirie, Whyalla, Monarto, Broken Hill, Port Augusta, Leigh Creek, Andamooka, Olympic Dam Village and Roxby Downs. It specifically reviews Woomera Village (1940s) Shay Gap (1970s) and the proposed extensions to Roxby Downs (2010s) as models of how to better plan and design communities in arid environments. Instrumental in these innovations is the use of landscape-responsive urban design strategies, water harvesting and irregular rainfall capture, arid horticulture, building design, colour and materiality, orientation and shading strategies, and social community construction under difficult isolationist circumstances. The paper points to key strategies that need to be incorporated in future climate change responsive community developments and policy making.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The aim of the research outlined in this paper is to develop a best practice process model for building projects based on the use of an expert system. The CONstruction Best Practice System (CONBPS) focusses on projects which are based on the traditional procurement strategy, using the JCT 80 standard form of contract. The model clearly identifies the sequence of construction activities. It also identifies the roles and responsibilities of the major parties on the building team and the issues within the project cycle, which can prove critical to project success. The system incorporates many user-friendly functions, including the provision of multi-choice icons and the provision of an on-line help function. Besides, it also provides interim and final reports which are used to advise the participants on the success factors that they have ignored and to which aspects they should pay more attention. A framework was initially developed focussing on the whole design process with a full knowledge-based system developed for the Inception Stage. CONBPS can be used as a teaching/learning tool to assist teachers and students to better understand the construction process. Also, it could prove useful to project managers and all the participants in the construction process.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The construction industry in the UK needs to improve its performance and provide clients with an improved level of satisfaction. The inefficient design and construction process is usually criticised as one of the main causes of poor performance.

A new construction process system, CONstruction Best Practice System (CONBPS), has been developed based on the use of an expert system. CONBPS is based on the traditional procurement strategy as it is probably the most popular procurement method in the UK and yet it is subject to most criticism. This model clearly identifies the roles and responsibilities of the major parties within the building team and identifies the activities and the key issues within the project cycle. The completed model reflects the full project cycle from inception to completion.

The prototype of this system has been demonstrated to the construction participants for their comments. The practitioners included architects, quantity surveyors, planning supervisors, private and public clients. The method of collecting data was through the use of semi-structured interviews.

Following feedback from practitioners, the CONBPS has been updated. This version is more robust; besides, it is more practical and user-friendly as it incorporates the comments from practitioners, who are also the potential users.

The primary aim of this paper is to discuss the development of the updated CONBPS. The improvement of the updated CONBPS includes the information for constructing the system, the computerised functions, system structure, knowledge representation structure and the system operation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research is concerned with the comparative cost of building structural frames in Australia. The research has been undertaken to evaluate the cost performance of a number of technologies that are typically used in medium-rise commercial buildings of ten storeys. The research methodology is based on pricing a number of standard building frame designs in five Australian cities. The results represent the cost of producing the same building using different building construction designs. By utilising a standard model, project variables like building quality, ground conditions and access were eradicated, thereby facilitating an unbiased comparison of cost performance. The second stage of the research invoiced a focus group of industry experts who were asked to validate the results of the cost study. In addition, participants of the focus group were asked to comment on the preferred construction practice for each of the typical building designs. Results suggest that post-tensioned in situ concrete frames have the best cost performance for most buildings. However, other designs can have good cost performance under some circumstances. Findings suggest that the Australian construction industry has long cultural preference for the use of in situ concrete in structural frames.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Construction projects have been criticised for low performance for many decades. One of the reasons for this situation is the temporary multi-organisation of the construction team; the ultimate reason may be due to the divergent background and specialist skills of the project team members. The aim of this paper is to investigate the different opinions of construction participants within the construction process. It focuses on the projects which use the traditional procurement strategy in the building sector as this process is often perceived as being far from efficient. The methodology used in this research is by interview; the targeted interviewees include architects, quantity surveyors, clients and planning supervisors. An expert system which has been developed to model the construction process, called the CONstruction Best Practice System (CONBPS), has been demonstrated and the participants’ comments sought. The findings are that different construction parties have different perceptions of the construction process and their understanding of each other’s role is ambiguous.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Time, cost and quality are the traditional determinants of project success. The level of client satisfaction is a newly defined measurement of project success. Often the satisfaction level of construction clients is not high. The reasons for this situation are twofold, firstly due to the temporary organizational structure of construction team and secondly, the inefficient construction process. The traditional procurement route, whilst still the most popular in the building sector, is probably subject to most criticism. The primary aim of this research is to develop a new best practice model for building projects. This will enable the client’s project manager to identify best practice under the traditional procurement route before the work is executed. Within this model, the sequence of construction activities, the responsibilities of the parties and the critical aspect of each phase of the project are identified. This model can then be utilized at both the design and/ or the construction stage in order to secure project success.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Building effective pathways for students to transfer from and between education sectors and qualifications has been the subject of extensive research, policy development and practice over the last 20 years, both in Australia and internationally. Different researchers and policy-makers have examined this topic from various angles, but all from the perspective that improved pathways constitute an essential feature in a more flexible and integrated tertiary education system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper explores insights into the regulatory state and state capitalism through the lens of how states construct and regulate markets in the area of ‘dangerous consumptions’, in particular, land-based casino gambling. It focuses on what is needed for public interest regulation; with a focus on consumer protection and harm prevention. Gambling constitutes a site of explicit state regulation as the state decides and negotiates license-to-operate conditions along with the degree of significance accorded to impact/harm, regulatory monitoring and enforcement, harm prevention and state/operator duty of care...


This paper outlines conceptualization of gambling as a ‘dangerous consumption’. Secondly, it examines the dominant regulatory paradigm responsive regulation (RR) and adequacy of RR as conceptual framework for the challenges posed by gambling as a ‘dangerous consumption’. Thirdly, it draws on a regulatory case study of RR in practice, drawing on a multi method approach to regulation of an Australian land-based casino [Victoria’s monopoly Crown Casino]. It concludes that current use of RR is inadequate to the task and argues for alternatives principles and public health approach as in the OECD hazard avoidance model applied to chemical accidents. This prioritizes prevention, preparedness [for risk/harm eventualities] and response [enforcement] and points to the need for a more nuanced response to the regulation of dangerous consumptions that directly addresses public interest.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

One of the most significant assessment challenges in higher education is how to authentically assess the acquisition of graduate attributes. When the assessment of attributes is developed to prepare students for the real world context or work place, it becomes even more challenging and complex. This paper presents a study of assessing work-integrated learning: a curriculum intervention within the discipline of the Built Environment, which sought to actively foster the development of graduate attributes to prepare students for the workforce. The research explores how the assessment of graduate attributes can be validated, and ultimately enhanced, by understanding the learning journey from the student perspective. The research focuses on the distinctive issues associated with Work-Integrated Learning (WIL) using an industry-mentored project, on a construction related issue. The students were asked to capture their reflections in the form of reflective diaries, which were prepared weekly throughout the subject. The research showed that many students expressed very positive views about their learning experiences. This occurred in spite of the challenges caused by the formal assessment process that were undertaken as part of the subject. The implications of the study are examined in relation to both the construction management discipline and wider context of assessing graduate attributes in higher education The paper suggest that giving voice to the student-learning journey offers a powerful lens through which the assessment of attributes can be validated.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper is about assessing the practice of Project-Based Joint Ventures formed between local and international contractors in the UAE construction industry. This common practice nowadays, provides the means for contractors to quickly add resources to enhance project acquisition. Studies indicate that JVs are among the tools that contractors will need to get together in the face of increasing market demands. Specifically, Project-Based JVs are often used in the UAE Construction industry with an exceptional growth in an attempt to diversify from Oil and Gas. The UAE is very business friendly which makes it attractive for such kind of alliance or partnership for local contractors to get the necessary experience and for international contractors to minimize the risks associated with entering new markets. In this context, studies that evaluate this alliance phenomenon in the UAE construction industry are limited. The few industry-related studies have primarily focused on large, international JVs; yet, many JVs are formed on small and medium-sized projects within the UAE. The paper aims to assess the current practices and understand the many factors involved with forming, managing, and controlling JV partnerships. The research methodology adopted a mix of quantitative and qualitative approaches. First, a closed question survey was disseminated to construction professionals in the UAE in light of the literature findings. Second, two case studies were demonstrated and analysed, then triangulated with the literature and survey findings to remove possible bias and improve the confidence in the collected data. The paper concluded that the JV in the UAE construction industry is mostly formed on project-basis rather than continuous collaboration. The management control mostly used in the UAE construction industry is shared management of activities in a venture with the operations shared between parents. The paper addressed major factors that lead to successful JV in the construction projects of the UAE which are namely trust, correct structure, communication, and partner’s commitment. Partners’ common objectives do not affect the JV success or failure. Willingness to adapt eliminates conflicts and enhances the JV success prospect.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The failure of learning from our mistakes or those of others, has generated unnecessary waste of time and costs, in the construction industry, due to its project based, fragmented and unstable nature. Lessons Learned, as an important way of improving projects performance, is analyzed in this study, with the aim to explore the current practice of Lessons Learned in the UAE construction industry. A literature review has revealed what “Lessons Learned” is under different contexts, and focused on various factors influencing a Lessons Learned Programme. The research method of a series of structured interviews, followed by an on line questionnaire, is adopted in this study. It was found that although the concept of Lessons Learned is quite familiar by most of professionals in the project management in the UAE construction industry, Lessons Learned practice is mainly performed in an informal way (individually or ad hoc). As for barriers for Lessons Learned practice, Culture factors, such as “Afraid to be blamed for mistakes” and “lack of learning culture” (1st and 2nd rank) influence significantly in Lessons Learned practice. It is also found that a formal lessons learned programme does exist in some organizations. However, with the lack of a dedicated Lessons Learned repository and Lessons Learnt system, Lessons Learned has yet a long way to reach its potential.