51 resultados para Construction Project Delivery


Relevância:

90.00% 90.00%

Publicador:

Resumo:

More than 3.4 million people die each year from water, sanitation and hygiene-related causes. Lack of access to clean water and sanitation kills those most vulnerable in the third world. Leadership in managing cross-disciplinary teams is required to present economical, viable community-based solutions. This project utilised the skills of undergraduates across different disciplines of construction, project management, engineering, design, and communication, to work alongside industry mentors in a team to design, build and present an innovative, sustainable water sanitation solution for a Bangladesh community. The semester-long project enabled undergraduate students to develop skills in client relationships, teamwork, and communication as well as discipline skills of project management and construction. The real-world problem necessitated a paradigm shift away from discipline-based knowledge transference towards skills for the future. The project utilised approaches such as negotiated curriculum and assessment; self-directed, flexible participation in learning; use of social media as a learning tool and cross-disciplinary teamwork. Results from student surveys and interviews indicate that this project directly enhanced students’ work-readiness skills and recognition of the importance of problem solving using cross-disciplinary understandings. Students reported greater self-confidence for tackling future workplace challenges. The results also illustrate strong levels of student satisfaction with the cross-disciplinary approach and the importance of skills in client relationships. The project and its outcomes have implications for how learning and teaching occurs in built environment disciplines and has the potential to create significant impact on the calibre of future built environment graduates.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The drive to undertake building adaptation has increased in momentum, the primary reason being adaptation can be less expensive than new build and conventionally result in faster project delivery times. The issue of sustainable development is another clear driver for adaptation and collectively buildings contribute around half of all greenhouse gas emissions. At the same time governments seek effective and efficient ways of reducing the contribution of cities to climate change and building adaptation appears to offer a practical means of reducing building-related emissions. One example is the ‘1200 building program’ which aims to increase adaptation rates with a target of 1200 city centre office adaptations by 2020 as part of the strategy to achieve carbon neutrality. Through a longitudinal examination of building adaptations it is possible to identify the nature and extent of typical levels of adaptation, as well as determining the inter-relationship between different types of adaptation and building attributes. Melbourne city centre was used for a case study which analysed 5290 building adaptation events between 1998 and 2008. The findings promote the adaptive reuse of buildings in specific circumstances and are directly applicable for increasing sustainability in the built environment. The case study focused on existing buildings in a global city to ensure relevance to urban centres where existing commercial buildings can become part of the solution to mitigate climate change.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This article focuses on how respectful learning relationships based on reciprocity between a Anglo-western raised educator and South Sudanese Australian students and graduates in social work and welfare courses in a regional location have (re)shaped the development of a research process. A reflective critique is intertwined with a description of my search (as an experienced practitioner but new researcher) for an appropriate ethical cross cultural framework for researching and advocating with a small ethnic population in a regional location. This includes a description of the process of exploring the need for, and positioning of, changing and re-creating relationships between the ‘researcher(s)’ and the ‘researched’ as co-authors; co-researchers; collaborators and participants to address issues of selfdetermination and power in the context of cross cultural research, education and human rights. The motivation to research seems a pivotal part of ethics in cross cultural research. As an educator I became concerned that the courses I taught in, and my own teaching practices, were (unintentionally) discriminatory. There appeared to be a lack of acknowledgement and/or action regarding the ingrained Western whiteness permeated and privileged knowledge and approaches in the construction and delivery of courses. I did not think I was adequately responding to, recognising or incorporating the different knowledge’s, strengths and needs of South Sudanese Australian students and graduates. There was a lack of fit between the academic rhetoric of human rights and diversity and my/our educator practice. This article explores the ‘corralling’ effect of mainstream research culture with attention to its potential for seduction and corruption that tends to separate the passion from the researcher, the researcher from the researched, and the actual issue(s) of concern ….from everyone.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is one of the most significant technological advances in the building design and construction industry to date. Implementation of BIM has increased significantly over the past decade; and it enables the different stakeholders of a construction project to collaborate better throughout its lifecycle, and improves the opportunities to share data and decrease consumption. However, the implementation of BIM lags far behind its potential due to the existence of various barriers. This paper aims at identifying, classifying, and prioritising these barriers to BIM implementation through a survey. The research findings are expected to assist major stakeholders in the construction industry to promote BIM implementation.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Project sponsorship is assumed to be critical to the success of information systems development and implementation. However, there is limited research on the effect of vendor-based sponsorship on the management of information technology (IT) projects. This paper contributes to that emerging body of evidence. Drawing on literature on psychological contract, management control and project sponsorship, the authors propose that vendor-based sponsors influence project performance in two main ways. One is to protect project quality by renegotiating contract with the client; and the other is to resource the project. Based on a survey of senior managers in IT services vendor organisations, it reports that project sponsorship improves the quality, but not the cost or timeliness, of vendor delivery of IT projects. The findings suggest that IT services vendors can improve their project delivery capability by appointing project sponsors.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Purpose – Building upon the results of a critical review of previous studies, the purpose of this paper is to present a framework to enhance the reliability of the theoretical model for international benchmarking of labour productivity (TMIBLP) method for construction project activities. The next part of the paper presents the results of implementing the proposed framework for construction activities in the Iranian construction industry. Design/methodology/approach – This paper draws upon a critical review of the literature to highlight the drawbacks of the previous studies concerning implementing TMIBLP within the construction industry. Identifying these shortcomings, the authors propose a framework for construction projects, which presents the procedure for deploying TMIBLP for construction activities in a reliable manner. The final section of the paper demonstrates the empirical implementation of the proposed framework within the Iranian construction industry. Findings – The primary contributions of the paper include: identifying the drawbacks of previous studies within the construction context, the framework that would lead construction managers towards more reliable implementation of benchmarking for construction projects, and determining the baseline of erecting steel structures in a developing country. Practical implications – A practical implementation of the TMIBLP method was presented to address the lack of research in Iran and to show the feasibility of using the framework developed. The authors investigated the daily labour productivity for the activity of structural steel erection for six projects in Tehran in order to determine the values of the baseline productivity for each project. Accordingly, the disruption index, performance ratio and project management index as the project benchmarks were calculated for all six projects. Originality/value – Underlining the necessity of implementing methods such as TMIBLP, this study outlines the outcomes of the first study on the benchmarking of construction activities deploying the proposed framework and using the data on erecting steel structures from six construction projects in Iran. The discussions provide guidelines for construction project managers regarding benchmarking labour productivity. The paper concludes with suggestions for future research opportunities.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

This study describes the development of a decision framework to support multi-disciplinary information and knowledge management model which focuses on integrated design and delivery solutions for all construction supply chain actors. The framework was developed within the context of two national information technology research projects in Australia. The first study used diffusion theory to explain the barriers and enablers to future adoption of advanced information technology solutions such as building information modelling (BIM). A grounded theory methodology was deployed and a pathways model for innovative information technology diffusion accommodating diverse patterns of adoption and different levels of expertize was developed. The second study built on the findings of the first study but specifically focussed on innovators, early and late adopters of BIM and the development of a decision framework towards advanced collaborative platform solutions. This study summarizes the empirical results of the previous studies. The core of the decision framework is the creation, use and ownership of building information sub-models and integrated models. The decision framework relies on holistic collaborative design management. Design expertise is diffused and can be found in various locations along the construction supply chain within project teams. A wide definition of design is considered from conceptual to developed to detailed design. The recent development to the decision model offers much potential as the early upstream decisions are often made in a creative, collaborative and uncertain environment. However, decision making needs to balance both a reductionist and exploratory creative empowerment approach. Shared team expertise and competency and team mental models are explored as a fundamental requirement to collaborative BIM. New skills in interdisciplinarity are discussed as an implication of future construction industry collaborative platforms.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Introducing new technologies poses a particular challenge to the players involved in a project. For a successful low energy building, a new design process is required and players must assume new and additional responsibilities. Hypocaust systems, where conditioned or non-conditioned air is passed through ducts within the concrete floor or ceiling of a building prior to its delivery to the rooms, are starting to appear in new buildings in Australia. This paper describes the lessons learned from the early experiences with a hypocaust system, installed in a new building in Melbourne. It concludes that a more cooperative process among all those involved in introducing and using a new 'technology' is essential if the problems described are to be avoided or at least minimized.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Construction Planning and Scheduling is taught for the fIrst time ill Semester 2, 2004 in the School of Architecture and Building, Deakin University. During the unit development process and the implementation of teaching activities, several issues arose in relation to implementing computer-aided construction scheduling and unit delivery in a unitary environment. Although various types of construction planning and scheduling software have been developed and applied, none of them can be run inside an online teaching software package, which provides powerful functions in administration. This research aims to explore the strategies to connect a project planning and scheduling software package and an online ~aching and learning software package by a Web-based support platform so that both the lecturer and students can draw up and communicate a construction plan or schedule with tables and fIgures. The key techniques of this supportive platfonn are idt;nlifies and they include a web-based graphically user-interfaced, dynamic and distributed multimedia data acquisition mechanism, which accepts users' drawings and retrieval information from canvas and stores the multimedia data ona server for further usage. This paper demonstrates the techniques and principals needed to construct such a multimedia data acquisition tool. This. research will fill the gap.in the literature in respect to an online pedagogical solution to an existing problem.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The professional project manager is a sought after commodity (McManus, 1995:12). Many companies face increasing demands to complete projects faster, at lower costs and to higher specifications and as Lock (1996;50) comments; “This work, far from requiring specialisation, demands a sufficient general understanding of the work carried out by those participants for the project manager to be able to discuss the work sensibly”. Though for some the term project manager can be clearly identified, others believe the terms project manager and project management, as used in the construction industry, mean all things to all men and lead to confusion (The Chartered Institute of Building, 1982;12). The lack of clarity surrounding the role of project manager made this area worthy of investigation.

This research sought a deeper understanding of the project management role and an identification of the skills and professionals associated with it. The desk top study revealed definitions of the role and perceptions of the skills involved. The literature showed that authors believed in the need for a balance between knowledge, experience and training and the types of professions involved. The research methodology comprised a qualitative approach, with a questionnaire sent out to a non-random sample of practices specialising in project management. The data analysis adopted uni and bi-variant methods, using SPSS. The research found that the role of the project manager is very broad. Furthermore it is adopted by many construction professions as the background of the project manager is largely perceived as irrelevant to the role. A definition is proposed and relevant skills are identified, finally the importance of experience and training is highlighted.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper presents design, construction, and evaluation of a micropump for drug delivery applications. The proposed micropump consists of three components: fluidics, electronics, and software. The fluidics component includes a silicone elastic diaphragm, a microservo, housing and two check valves. The diaphragm is modeled and simulated to establish its geometrical specifications. The housing is built using a rapid prototype machine. The electronics component consists of a microcontroller, a microswitch array, a simple display and a power unit. The software component is written in C and receives inputs from user, controls the microservo speed and displays the programmed speed. A number of experiments are conducted to evaluate the performance and capabilities of the micropump. The experiments focus on measurement of flow rate, dosage and duration of operation. A discussion of the performance and capabilities of the developed micropump is also given.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Curriculum collaboration between TAFE (vocational college) and universities in Australia has had a chequered history. Attempts to collaborate on curriculum development and delivery have mostly been at the margins of articulation and educational pathways. This study examines a pilot project in dual sector construction management education conducted at RMIT University over a two year period. The study demonstrates the challenges with mutual curriculum development between TAFE and higher education in Australia, and demonstrates the methods utilised to overcome these challenges. The results of the projects reveal that the benefits to students in hands-on experiences, theoretical knowledge gained and practical demonstrations were invaluable and worthy of ongoing research and development. The paper also raises critical questions about flexibility and mobility in educational institutions in Australia.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Australian post-compulsory vocational or technical education and higher education (university) has traditionally been delivered separately. Attempts to collaborate on curriculum development and delivery have mostly been at the margins of articulation and educational pathways. This study examines a pilot project in construction management education conducted at RMIT University over a two-year period. The study demonstrates the challenges with mutual curriculum development between vocational and higher education in Australia and demonstrates the methods utilised to overcome these challenges. The results of the project reveal that the benefits to students in hands-on experiences, theoretical knowledge gained and practical demonstrations were invaluable and worthy of ongoing research and development. The article also raises critical questions about flexibility and mobility in educational institutions in Australia.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Although information communication technology (ICT) is long regard as very useful tool in today’s construction engineering and project management environment, organizations must not only operate based upon its original setting, but also requires on-going observation, additional features and fine is a very common phenomenon that organizations purchase the licensed “off their own business need. Due to the incapability of such software and inefficient customization, the possible result is making that ICT tool not user-friendly and sometimes the whole system becomes obsolete.

The purpose of this paper is to review and report those action organization to enhance the performance of its Enterprise Resource Planning (ERP) system launched in December 2002. Such actions include: improving data inputting method; removing the tran the organization’s “Delegation and Limits of Authority”; publishing the “League Table” amongst users; integrating the 3D Mode into the system and upgrading hardware.

Whilst the ultimate goals of such system are well beyond the time limit of this research study, an obvious interim result, achieved by this case studied organization, was winning a landmark project worth US$500 million after the ERP system was functioned prope and effectively. Their experience and success becomes an exemplar which can be borrowed by those companies, from managerial perspectives and as a roadmap, planning to adopt information technology (IT) strategy and use ICT tool in the construction engineering and project management framework. Singapore, where public housing provisions have been a major concern of their citizens as the building stock gets older.