119 resultados para Rationalization of construction


Relevância:

100.00% 100.00%

Publicador:

Resumo:

International comparisons of construction industry performance are notoriously difficult. A recent comparative study, extensive in scope and using an innovative approach, is reviewed and questions raised regarding various aspects of the methodology adopted, the validity of the conclusions drawn and manner in which outcomes were reported. Particular areas of concern include the unequivocal statement of conclusions that are based on a small sample, and the use of data from that sample that are, in fact, no more than estimates of project performance. Attention is drawn to the limitations of the research reported and the reliability of the methods used, and the data gathered is examined.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction management graduates are employed in job functions such as building and civil engineering contracting, construction and project management consulting, client organisations (public and private) and developer organisations. Considering the diversity of employment opportunities for construction management graduates, they increasingly need to have a portfolio of skills to work effectively and efficiently with other professions in the industry. In exploring this, the objective of the research presented in this paper is to determine if construction management graduates are meeting the expectations of their employers. In considering the competitive forces impacting the construction industry, the authors of this paper sought to establish whether construction managers are able to identify those key skills needed for the future success of the industry. In turn, this information is considered critical for the successful formulation of curricula. Therefore, to establish whether construction management graduates are meeting the expectations of contractors, a survey was distributed to managers to establish their expectations and observations of recent graduates. The survey results indicate that managers are generally satisfied with the skill level of graduate students. The survey also highlighted several important skills that were considered to be lacking in graduates. cknowledging that there is always a need to improve the skill level of graduates, the authors propose a number of recommendations that are considered to improve the content construction management curricula.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

While there have been many attempts at comparisons of construction performance over the past 50 years, the results have generally been inconclusive and/or contradictory.

Such comparisons are of great interest to industry, governments and theorists alike but there is little agreement as to how they are best done. A variety of methodologies have been used, however, the lack of satisfactory outcomes has been due largely to one factor, the lack of a truly reliable method for comparing construction costs in different currencies

Exchange rates are recognised as being unsuitable, and while purchasing power parity (PPP) has a long history, the method still has many critics. In addition, the nature of the building industry and its products makes the establishment of reliable construction PPPs very difficult. Both the UN’s International Comparison Program (ICP) and the European Union gather data for the production of construction-specific PPP indices, but neither body publishes them, as there is too much doubt about their reliability.

New approaches are being developed and some are soon to be trialled. This paper looks at the problems, describes and discusses some new approaches, and assesses their potential.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Disputes have become an inherent feature of the construction industry. A plethora of studies have been undertaken to identify the causes of disputes so as to determine the most appropriate prevention and resolution strategies. While it is widely known what the main causes of dispute are, they still remain prevalent in the Australian construction industry. This is because there is a need to better understand the complexity and interplay between causal variables. Using data derived from the
literature a conceptual causal model of construction disputes is developed. The model identifies the key causal variables and pathogens that can contribute to disputes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The present work combines electron backscatter diffraction, transmission electron microscopy and Schmid analysis to investigate secondary twinning in the magnesium alloy Mg-3AI-1Zn. Inspection of the misorientations between the parent matrix and {1011} - {1012} doubly twinned volumes reveals that there are four possible variants. One of these variants characterized by 38°< 1210 > misorientation with the matrix is favoured much more than the others. This variant involves activation of the secondary twinning systems that are quite inconsistent with the Schmid-type behaviour. For the secondary twin to grow significantly it must take on a shape enforced by the primary twin, however, this is not optimal for strain compatibility. It is argued that the 38° < 1210 > variant occurs most frequently because it provides the closest match between the primary and secondaty twinning planes, thus minimizing the compatibility strain. This conjecture is confirmed by the simulations of twin activity m ellipsoidal grains performed using the visco-plastic self-consistent crystal plasticity model.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The model draws from theories of industrial economics and supply chain literature, and is an attempt to advance the construction supply chain field through the development of an industrial organisational methodology to describe construction supply chains.
Empirical studies have examined the industrial organisation of other industries, typically forming descriptions based upon vertical integration and horizontal market concentration. A review of the trends in the supply chain literature indicate there is a need to develop a model to describe the industrial organisation of the construction industry through supply chain structure. The merging of the supply chain concept with the industrial organisation model as a methodology for understanding the structural characteristics is an important contribution to construction economic theory. The paper begins to develop a language for describing the structure and behaviour of supply chains specific to the construction industry and is so doing suggests a neo-industrial organisation approach.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper aims to explore the feasibility of implementing formal partnering in China's construction industry. After a literature review and synthesis, a self-administered industry-wide postal questionnaire survey was conducted to examine practice, detect problems and find solutions. Professionals involved in China's construction industry found having very limited knowledge and experience in formal partnering, which indicates that formal partnering is undeveloped in China. However, most companies are found maintaining close and cooperative business relationship with other parties, which suggests that informal partnering has been implemented as an alternative because trust is deeply rooted in the Chinese culture. The feasibility of implementing partnering in China is revealed. It is recommended that international architectural, engineering and construction (AEC) firms and clients enter China's construction industry by adopting partnering methods to collaborate harmoniously with local Chinese parties. The perceived outcome has been found promising. This paper makes an original contribution to the general body of knowledge on partnering procurement route, in particular in China's construction industry, on which previous research has barley focused. Current situation of partnering implementation in China is examined and problems investigated. Underlying reasons are also explored and feasible initiatives recommended.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Delay in project completion is a major problem in construction that often leads to costly disputes and acrimonious relationships between the parties involved. The primary aim of this investigation was to determine why these delays occur and to develop control measures to minimise their impact.

Relevância:

100.00% 100.00%

Publicador:

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Research on construction prices is significant for contractors and traders. A comprehensive understanding of construction prices may influence crucial decisions in business operation and arbitrage activities. This study focuses on the cointegration relationships of regional construction prices in Australia by using a range of econometric techniques including the stationarity test, the Engle-Granger cointegration approach examines the long run equilibrium relationships within the regional markets, and the error correction models explore the short run disequilibrium relationships. Finds of this study reveal that the economic system in which the construction industry participants operate is characterized by a highly competitive, integrated marketplace, Especially in Melbourne and Sydney. But exclude Northern Territory and Queensland. Furthermore, the results of long term relationships estimation suggest that there are 15 pairs of regional construction prices have long term equilibrium relationships. Additionally, the causalities and diffusion among the construction price indices in six states and two territories of Australia are estimated in this study. These outcomes suggest that causal links between regions mainly exist among adjoining states.